| 1 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 2 | Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required (DSR-18/2.24.1/AR) |
| 3 | Eatra for every additional lift of 1.5m or part three of in excavation/banking excavated of stacked materials, 1.50mtr to 3.0 mtr (AR/GNIDA) |
| 4 | Cartage of ballast, Kankar Coal, grit or sand including loading & unloading but excluding stackings on pakka roads. (SOR-20/231) |
| 5 | As in item (231) above but for cement steel or other materials. Lead upto 2Km (SOR-20/232(a)) |
| 6 | Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30cms. measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. Out side periphery of area cleared. (SOR-20/259(i)) |
| 7 | Same as above 259(i) above but grass only (SOR-20/259(a) |
| 8 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. |
| 9 | All kinds of soil (DSR-18/2.28.1/AR) |
| 10 | Tractor with trolley including POL & driver. (SOR-20/S.No-19/Chapter-2) |
| 11 | Supply of labour. ( Based on SOR-20/SN-12/Chapter-2) |
| 12 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil (DSR-18/2.30.1/AR) |
| 13 | Supplying at site :R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-incharge (cost of earth works in excavation, concrete works in foundation to be paid separately). (DSR-18/16.15.1) |
| 14 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 15 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 16 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. (DSR-18/16.17) |
| 17 | With G.I. barbed wire (DSR-18/16.17.1) |
| 18 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost) (DSR-18/16.85) |
| 19 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (DSR-18/16.69) |
| 20 | White washing with lime to give an even shade : Old work (one or more coats) (DSR-18/13.87.2) |
| 21 | Painting or varnishing with valsper or other approved high grade enamel or super par synthetic clean varnish complete one coat over previously painted surface including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. paint to be used should confirm ISI no. 105/106/133-1950 (SOR-20/647/15.07) |
| 22 | Painting with aluminium paint of approved brand and manufacture to give an even shade: One or more coats on old work (DSR-18/100.1) |
| 23 | Supply of Dewatering Pump 10 HP (MORTH Sno-109, Chapter-20/P746) |
| 24 | Trenching of ordinary soil upto a depth of 60cm including removal and stacking of serviceable material and then disposal of surplus soil by spreading and neatly leveling within a lead of 50mtr. And making up the trenched area to proper levels by filling with earth or earth mixed with sludge/manure before and after flooding trench with water (excluding cost of imported earth sludge and manure) (AR/GNIDA) |
| 25 | Supply of selection-1/doob grass in carpet at site fresh and free from weeds having proper roots in green including loading, unloading carriage and all taxed paid etc. and as per direction of officer in charge (1 Sqm carpet grass covers 4.0 Sqm area of grassing) 39. Grassing with selection no. 1/doob grass including. (AR/GNIDA) |
| 26 | Grassing with selection no. 1/doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth it needed (The grass and good earth shgall be paid for separately) Pe (1) in rows 5cm apart in both directions (AR/GNIDA) |
| 27 | Hiring of Portable Re-cycle jetting cum suction machine mounted on Mahindra volero maxi with hydraulically operate Man-Hole De-silterupto depth of 15 Meter with driver for the area of Gr. Noida. As directed by Engineers in-Charge for 8.50 hours perday overtime will be paid on pro-rate basis. pressure 3000PSI (Min) with 15 mtrs suction head and jetting water capacity of 2000 litres. Rate As Per Noida |
| 28 | Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, Rates are inclusive of all taxes, royalty etc. all T&P/machine material and labour required for proper completion of work. (SOR-2020/New item/Sr.No.19.01) |
| 29 | Water Tanker with Sprinkler 6000 Litre or above cap. With POL/Driver including filling of water etc. complete (SOR-20/30) |
| 30 | Supply of labour. ( Based on SOR-20/SN-12/Chapter-2) |
| 31 | Complete maintenance of the entire Garden featured having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, ledge, flower, beds foliage creeper etc. including hoeing weeding, pruning, replacement of plants gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizer, (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as per directed by officer in charge, (Cost of good earth, manure, fertilizer, insecticide, pesticide will be provided by the department and lawn mover and brush cutter with fuel and other T&P material/articles shall be provided by contractor) and as per direction officers in charge. play ground and public parks. (AR/GNIDA) |
| 32 | Watering of developed lawn/ground cover area including arrangement of water system and pope etc. complete item (AR/GNIDA) |
| 33 | Supply of Cowdung (AR/GNIDA) |
| 34 | Plain/Reinforced Cement concrete in open foundation complete as per Drawing and Technical Specifications. (MORTH-20/9.06/E/Case-II) |
| 35 | RCC Grade M-25 using batching plant transit mixture and manual placing (MORTH-20/9.06/E/Case-II) |
| 36 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (DSR-18/5.22) |
| 37 | Thermo Mechanically treated bars of grade Fe-500D or more. (SAIL Steel) (DSR-18/5.22.6/AR) |
| 38 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |