| 1 | Loading, carriage & unloading of following materials from centre store Daliganj to JE Store/work site and its stacking. Distance approx (0-35) kms. |
| 2 | Line Material |
| 3 | STP Pole 9/11 Mtr. long. |
| 4 | 100 KVA T/F |
| 5 | ACSR Weasal Conductor |
| 6 | LT PVC Cable 1x400/3.5x 240/1x 70/630SQMM |
| 7 | ABC( 3x120/95/70/50/16) Sqmm. |
| 8 | 11 kv Pin Insulator (Polymeric) |
| 9 | 11 kv Disc Insulator |
| 10 | Stay Set |
| 11 | Stay Wire |
| 12 | 11 KV XLPE Cable (3x35/70/120/170/185) |
| 13 | 11 KV S/TH CABLE JOINT KIT |
| 14 | 11 KV O/D AND I/D CABLE JOINT KIT |
| 15 | Safe Loading carriage and unloading of following material from JE Dump store to Pit Site . |
| 16 | Fabrication, erection of sub-station type double pole 11 mtr. Long ST pole along with fixing of necessary clamps. Accessories required including supply & fixing of straight MS 100x50mm top channel (2240mm long) one no. dropper channel/Angle 100x50 mm 2 nos. with arrangement of fixing 3 nos. pin insulator as per RESPO specification and direction of E/I. Only pole & insulator supplied by the dept. |
| 17 | Grouting of STP in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mm x 45mm above ground level in 1:2:4 in cement, coarse sand and stone gritt as per RESSPO norms. |
| 18 | Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole as per IS/RESPO norms. |
| 19 | Providing and Fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole as per IS/RESPO norms. |
| 20 | Proper Jumpering of 11 KV Line on tapping point |
| 21 | Providing and Fixing of LT Distribution Box Fuse unit box as per RESPO specification. |
| 22 | Painting of ST Pole with Red Oxide and AL painting as per RESPO specification. |
| 23 | Grouting ,Binding and Nuzzuiling of Stay set 16x1800 complete including and fixing of necessary clamp accessories. |
| 24 | Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wired shall be supplied by the department. |
| 25 | Erection & commissioning of (3x120/95/70/25/16 Sq.mm) Aerial Bunched Conductor as per IS/RESPO norms. |
| 26 | Stringing and sagging of 3 Phase 4 wire of 11 KV Line on ACSR Weasal Conductor .(only conductor Provided by Department) |
| 27 | Laying of Cable 11 KV XLPE cable (3x35/70/120/170/185) sqmm in pakka road by Drilling method laying cable as per RESPO specification & direction of E/I. |
| 28 | Hoisting of 11 KV XLPE Cable will be passed through MS Pipe duly clamped pole at the bottom, middle and top of the pole. |
| 29 | Cable Route Marker as per RESPO |
| 30 | Laying of LT PVC Cable 1x400/3.5x240/630 SQMM as RESPO specification & direction of E/I. |
| 31 | Earthing of Pipe Type with 60 feet deep boring and Providing Jindal make Pipe \\"B\\" Class 1\\" Dia and GI Strip 25x5x6 mtr long attached with clamps and GI Pipes (All material Arranged by contractor) |
| 32 | Safe Installation of 100 KVA T/F on double pole by providing and fixing of proper size all accessories. along with making HT/LT connection and its commissioning as per IS/RESPO norms. |
| 33 | SUPPLY AND INSTALLATION OF FOLLOWING MATERIAL |
| 34 | Holding Clamps |
| 35 | AL LUG Long Barrel 240/400 SQ MM |
| 36 | LT clamp for PCC Pole |
| 37 | EYE-HOOK |
| 38 | SUSPENSION CLAMP |
| 39 | DEAD END CLAMP |
| 40 | 11 KV Disc Fitting |
| 41 | Copper L PIECE |
| 42 | AL LUG 95/120 SQ MM |
| 43 | DANGER BOARD WITH CLAMP |
| 44 | NUMBER PLATE WITH CLAMP |
| 45 | BARBED WIRE GST will be paid extra as per rule. Please Enable Macros to View BoQ information |