| 1 | WELL RENOVATION |
| 2 | 3.7:Removal of Unsuitable Soil with Disposal upto 1000 m <br> Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 |
| 3 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth |
| 4 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. |
| 5 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 6 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 |
| 7 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) |
| 8 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 9 | OD18516/2026-2027:MAN / MAZDOOR FOR LOADING AND UNLOADING |
| 10 | OD18517/2026-2027:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm ornearest available size confirming to IS 2185 part I of 1979 for super structure up tofloor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etccomplete |
| 11 | OD18518/2026-2027:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work,Details of cost for 1 mx1 m framed guard bar grating of 0.218 quintal |
| 12 | OD18515/2026-2027:Plastering cement plaster of mix 1:4 including all cost |
| 13 | OD18519/2026-2027:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set includingconveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etccomplete |
| 14 | OD18588/2026-2027:Filling with Contractors own earth (excluding Rock ) open areas in layers not exceeding 20cm in depth consolidating layer by ramming and watering lead upto 50m and lift upto 1.5m asper direction of site engineer in charge . Please Enable Macros to View BoQ information |