| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 2 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 3 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. |
| 4 | All works above plinth and upto floor V level |
| 5 | Concrete of M25 grade with minimum cement content of 300 kg /cum |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : |
| 7 | Cement mortar 1:4(1 cement :4 coarse sand) |
| 8 | Mirror polishing on marble work/Granite work/stone work where ever required to give high gloss finish complete. |
| 9 | Stone tile (polished) work for wall lining over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand) and cement slurry @ 3.3 kg/sqm including pointing in white cement complete. |
| 10 | 8 mm thick |
| 11 | Granite of any colour and shade |
| 12 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. |
| 13 | Hot finished welded type tubes |
| 14 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, bufing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 15 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. |
| 16 | Polished Granite stone slab of colour Black, Cherry/Ruby Red or equivalent |
| 17 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 19 | Two or more coats on new work |
| 20 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 21 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 22 | In cement mortar |
| 23 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. |
| 24 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 25 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq. mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) |
| 26 | Providing and laying 60 mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. |
| 27 | Granite work (Polished and machine cut) of thickness 18mm for wall lining (veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand) including pointing with white cement mortar 1:2 (1 white cement: 2 marble dust) with an admixture of pigment to match the granite shade: Granite of any colour and shade. (Sample and colour shall be approved by Engineer in charge) :Area of slab above 0.50 sqm |
| 28 | Cutting the entire area of the marble joint and making a groove of 3 x 10 mm using a circular saw cutter machine and cleaning. And grout the joints of the flooring using a matched colour epoxy grout. Including filling, grouting and finishing etc all complete as per direction of Engineer-In-Charge. |
| 29 | Service of High pressure water jet cleaning of Road, Pathway & Corridor etc by specialized agency such as urban clap or equilent including cleaning dust, removing debris, removing plants/alge, etc. to the entire satisfaction of Engineer-in-charge including, the waste so obtained shall be collected to any distance within compound and stacking, (The rates are inclusive of labour, material, brooms, dusters and its operation, repairing work etc. required). The work shall be carried out at thyagraj sports complex and what ever equipments/ machinerys required as per the site conditions. (The work should be carried out by specialized agency and contractor should be responcibel for labour's identity card, uniform & Safety Equipment such as safety belt etc. at his own cost). (No material and T&P shall be provided by the Department). |
| 30 | Dismantling of (old) polycarbonate sheet roofing which wornout by the wind at height upto 10.m of Thyagraj Sports Complex etc. including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. |
| 31 | Providing and fixing 10 mm clear or any colour of required multi wall polycarbonate sheet (Sunlite VMI or coxwell or GE Brand Lexan or equivalent ) The multiwall polycarbonate sheet shall be fixed on tubular steel structure with 25 micron thick powder coated aluminium section with powder 50 mm top and bottom profile and weather proof EPDM gasket on both side of joints so as to make the whole structure water tight as per approved design / drawing .The aluminium section with powder coating of 25 micron shall be fixed in joints and both end of polycarbonate sheet to fix the sheet rigidly on steel frame structure .The weather proof EPDM Gasket and aluminium profile shall be fixed and sealed with silicon (Winsil-20) to make the joints fully waterproof . the overhang end of polycarbonate shall be fixed with self tapping and self drilling 55 mm long steel screws fixed not more than 300 mm center and as per direction of engineer -in-charge. |
| 32 | Credit (deduct) for dismantled materials take away by the contractor from the site. Old dismantle material such as aluminum profile & channel, EPDM gasket, (old) Polycarbonate sheet etc complete as per direction of Engineer-in-charge. |
| 33 | Credit(deduct) for steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead complete as per direction of Engineer-in-charge. |
| 34 | Modified Estimated Cost after using Correction factor on DSR-2023 on account of GST @ 0.973 |
| 35 | Add Cost Index @ 3% on DSR 2023 item. Please Enable Macros to View BoQ information |