| 1 | Demolition of RCC work by mechanical means and stock piling at designated locations and disposal of dismentled materials upto a lead of 1 km, stacking servicable and unservicable material separately including cutting reinforcement bars complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 2 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish I/c centring , shuttering , strutting and proping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4m and removal of the same for insitu- reinforced concrete &plain concrete work in :- |
| 3 | suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 4 | Providing and laying cement concrete 1:2:4 ( 1cement:2 sand: 4graded stone aggregate 20 mm nominal size )and curing complete excluding the cost of form work and reinforcement in:- Slab complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 5 | Prov. Tor steel reinforcement for RCC work @52 Kg / Cum complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 6 | Fixing . 500 mm dia man hole cover with frame complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 7 | 20 mm cement plaster in single coat on rough side of brick/concrete/ stone walls for interior plastering up to floor two levels including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80 mm in girth and finished even and smooth in cement mortar 1:4 (1 cement:4 sand) in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 8 | White washing with lime on undecorated wall surfaces two coats to give an even shade including thoroughly brooming the surface to remove all dirt , dust and other foreign matters in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 9 | Excavation in earth work and disposal of excavated earth upto a lead of 20 metres and lift upto 1.50 metres, disposed earth to be levelled and neatly dressed in Pick-Jumper work complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 10 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centring & shuttering in complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 11 | Providing and laying cement concrete 1:1½:3 (1 cement: 1½ sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 12 | i) Foundation footings bases of columns and the like and mass concrete. |
| 13 | ii) Walls (any thickness but not less than 0.1m) including attached pilasters, buttresses, plinth and string courses etc. from top of foundation level upto floor two level) |
| 14 | (iii) Suspended floors, roofs, landing and shelves and their support, balconies, beams, girders, bressumers and cantilever upto floor two level. (Cast in situ) |
| 15 | Providing and laying no fine cement concrete 1:6 (1 cement: 6 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 16 | (i) Foundation and plinth, walls etc. |
| 17 | Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batten and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete & plain conrete work in complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 18 | i) Flat surfaces such as soffits of suspended floors, roofs, landings & the like. (Floors upto 200mm th.) |
| 19 | ii) Vertical surfaces such as walls (any thickness) partition and the like including attached pillasters, buttresses, plinth and string courses and the like. |
| 20 | White washing with lime on undecorated wall surfaces two coats to give an even shade including thoroughly brooming the surface to remove all dirt, dust, mortar dirt and other foreign matter. |
| 21 | Providing mild steel/tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 22 | Providing and laying in trenches, galvanized mild steel tubes (light grade), tube fittings (earth work in trenches to be measured & paid for separately). complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 23 | 50mm nominal bore |
| 24 | Providing and fixing gun metal full way wheel valve complete in all respect with in all leads and lifts as per the direction and direction and satisfactionof Engineer-in-charge. |
| 25 | 50mm nominal bore |
| 26 | Providing and fixing 1.80 m high barbed wire fencing with MS Pipe posts 1.50m high 40 mm, 5.0m C/C with 3 horizontal rows of barbed wire embedded in CC 1:3:6.in all leads and lifts and as per the entire satisfaction of Engineer-in-charge. Please Enable Macros to View BoQ information |