| 1 | Straightening one slanted LTpole after unbinding the lineand binding the line afterwork. |
| 2 | Renewal of existingdamaged/broken old LT stayin existing stay rod. |
| 3 | Providing Stay for LT polesincluding digging & backfilling pit in ordinary soil |
| 4 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 5 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 6 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 7 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 8 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 9 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 10 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 11 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 12 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 13 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 14 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 15 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite |
| 16 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 17 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 18 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 19 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 20 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 21 | Providing Cable Tie |
| 22 | Providing End Caps |
| 23 | Installation of Pre-insulated lugs for 70sqmm |
| 24 | Installation of Pre-insulated lugs for 50sqmm |
| 25 | Installation of Pre-insulated lugs for 16sqmm |
| 26 | Providing sattelite connectors for consumer connection |
| 27 | Erection of suspension clamp for LT ABC of any size |
| 28 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of all materials |
| 29 | Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 30 | Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 31 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole,backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole |
| 32 | Renewal of existing damaged/old LT PSC/RCC (three phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 33 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 34 | Stringing of 1.1 kV Aerial bunched cable of size 1 x 25 + 1 x 25 sqmm with bare/insulated Messenger through existing poles |
| 35 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing) |
| 36 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). Please Enable Macros to View BoQ information |