| 1 | Exceration in foundation, trenches etc, erth work in al type of soil such as pick werk, jumper work, blasting work kankar,mourum singles including decomposed soft and hard rock etc. upto all heights stacking the excavatn earth not more than 3 metres civar from the edge of excavation and then returning the stacked soll in 15cm layers when required inte plinths and sides of foundation etc. consolidating nach deposited layer by rumming and watering and then disposing of all surplus excavated rarth upno all leads and its as directed by the Engineerin charge complete in all respects. |
| 2 | Dismentalling of broken GI pipe. |
| 3 | 65 mm dia (L). |
| 4 | Laying, jointing and testing in trenches GI pipe confirming to ISI specification i/c commissioning complete in all respect of following dia in distribution (earth work in trenches shall be measured and paid the separately) including all leads and lifts as per the direction & satisfaction of E-in-charge with butt welding. |
| 5 | 65 mm dia (L). |
| 6 | Releying, Jointing and testing in trenches of pipe confirming to ISI specification i/e commissioning compl in all respect of following dia in distribution jearth work in trenches shall be measured and paid for separately) induding all leads and lifts as per the direction & satisfaction of E-in-charge. |
| 7 | 65 mm dia (L). |
| 8 | Cutting of MS pipe complete in all respect with all leada and lifts as per the satisfaction of E-in-charge. |
| 9 | GI pipe 65 mm dia. |
| 10 | Welding of MS. pipe with circumferential butt welding joint welded sockets at both end with double/ triple layer 6 as per 15 816-1965 according to wall thickness of pipesj The work shall be done as per entire satisfaction of Engineer-in-Charge within all leads and lifts. |
| 11 | GI pipe 65 mm dia. |
| 12 | Providing and fixing double flanged cast steel sluice valve of Kirloskar/KSB/Leader make and of class-150 for rising main and capable of with standing normal seat pressure as per relevant IS specifications with upto date amendments including rubber, gaskets, nuts and bolts complete in all respect and to thte entire statisfaction of Engineer-in Charge (65 mm dia). |
| 13 | Providing, welding, and fixing M.S. plate flanges of various dia (nominal bore) of following Flange tables confirming to IS 6392-1971 or latest with up to date amendments after every 100 m pipe or as per site requirement including cutting of pipes wherever required, welding in three layers (leak proof) confirming to specifications as prescribed in relevant I.S. Code i.e. IS 816-1969 or latest as applicable with up to date amendments with nuts, bolts and washers and specials etc. confirming to IS-1963 or latest with up to date amendments including packing sheet i.e. asbestos fibre sheet minimum 3 mm thick and painting with anticorrosive paints complete in all respects in all leads, lifts and carriage of material at site and as directed by Engineer-In-Charge. (65 mm dia Table-5) |
| 14 | Providing and laying cement concrete 1:3:6 (1cement:3 sand: 6 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work in foundation and plinth. |
| 15 | Providing and laying cement concrete 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20 mm nominal size)and curing complete excluding cost of form work in foundation and-plinth. |
| 16 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, struting and propping etc with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu-reinforced concrete and plain concrete and plain concrete work including c all leads, lifts and carriage of material at site and as direction by the Engineer-in-charge. |
| 17 | Vertical surfaces such as walls (any Thickness) partitions and the like including attached pillasters, buttresses, plinth and string source and the like. |
| 18 | Providing and placing tor steel reinforcement for RCC work i/c bending,binding and placing in material at site and as direction by the Engineer-in-Charge including cost of binding wires position complete upto floor two level including all leads and lifts. |
| 19 | Steel work welded in built up section truses and franed work including cutting hoisting, fixing in postion and applying a priming coat or red lead painting in grating framed guard bars, and as dorection by the Engineer-in-Charge. |
| 20 | Painting two coats (excluding priming coat)on new steel work based surfaces, with ready mixed paint, brushing to give an even shade including cleaning of all dirt, dust and other foreign matter, sand papering and stopping, with paint other than white. Please Enable Macros to View BoQ information |