|
| 1 | Excavation in foundation,trenches etc.in earth work in all kinds of soil such as pick work, jumper work, blasting hard of soft rock by chiselling where theblasting work is prohibited slushy daldal and saturated soil including pumping or bailing out water within all heights, stacking the excacated soil within all leads clear from the edge of excavation and then returning the stacked soil in 150 mm (fifteen centimetres) layerwhen required into plinths,sides of foundation consolidating eachdeposited layer by remming and watering and then disposingof all surplus excavated earth as per the direction of Engineer-in-Charge with in all leads and lifts. |
| 2 | Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding cost of centring and shuttering in: Foundations and plinth: |
| 3 | Providingformworkwithsteelplates3.15 mm thick welded with angle iron in frame 30x30x5mm,so as to give a fair finish i/c centring shuttering,strutting & propping etc. with wooden battens & ballies,ht. of propping & centring below supporting floor to ceiling not exceeding 4.00 mts. & removal of the same for in situ-reinforced concrete & plain concrete work :- |
| 4 | Vertical surfaces such as wall (any thick.) partitions & the like i/c attached pillasters, buttresses, plinth & string courses & the like. |
| 5 | Flat surfaces such as soffits of suspendedfloors,roofs,landingsandthe like floors etc.up to 200mm in thickness. |
| 6 | Edge in slabs |
| 7 | Providing and laying cement concrete 1:1.5:3 (1cement :1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for RCCwork in :- |
| 8 | Foundation ,footing, bases of columns and the like & mass concrete. |
| 9 | Wall (any thickness but not less than 0.10 mts.Thickness)attached pillasters,buttresses plinth,& string courses etc.from top of found.level upto floor two level |
| 10 | Providing Tor steel reinforcement for RCC work i/c bending,binding& placing complete upto floor two level. |
| 11 | Providing in RCC work smooth finishing of the exposed surface with cement mortor1:3(1cement :3 sand ) |
| 12 | Steel work welded in built up sections, trusses & framed work i/c cutting, hoisting & fixing in position & applying a priming coatof red paint :- In grating, framed, guards, bars, ladders, railing, brackets & similar works. |
| 13 | Providing and laying cement concrete 1:2:4(1cement :2 sand :4 stone aggregate 20mmnominalsize)&curingcompletebut excludingthe cost of form work and reinforcement for reinforced concrete work In suspended floors, roofs, landing and shelves and their supports, balconies, beams,girders,bressumersandcantilevers upto floor two level |
| 14 | White washing with lime on undecorated wall surfaces two coats to give an even shade including thoroughly brooming the surfacetoremovealldirt,dust,mortardirt and other foreign matter. |
| 15 | Providing,lowering,layingandjointingHDPE pipe (confirming to PE80 PN8 DN160 IS 14333:1996)inproperpositionbybuttfusion joining procedure including hydraulic testing as per relevant IS Code, complete with all material for joining procedure like butt fusion welding machine with hydraulic jack, top loadingclampetc.pumpandaccessories for hydraulic testing and all labours as directed by engineer in charge as confirming to IS- 7634 (Part II): 2012 amended upto date). |
| 16 | Providing and placing in horizontal layers filtering media duly graded, screened, washedandcleanedasspecifiedforSDBbythe Engineer-in-Charge. |
| 17 | Cost of covering for sludge drying bed |
| 18 | Sludge dewatering system (screw press) with all necessary arrangements with 3 m3/hr capacity Please Enable Macros to View BoQ information |