| 1 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified materials with in all lifts and lead upto 1000 metres etc. complete & as per direction of the Engineer-in-Charge |
| 2 | Re-working of scarified bituminous surface suitable after supplementing base materials with sand & compacting finished surface as per Technical Specification & as per Clause - 601.8.3.2 of MoSRT&H Specifications for road & Bridge works etc. complete & as per direction of the Engineer-in-Charge |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 etc. complete & as per direction of the Engineer-in-Charge. |
| 4 | Dismantling of Cement Concrete pavment by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02cum in volume and stock piling at designated locations and disposal of dismanteled materials up to a lead of 1000 meters stacking servicables and unservicables materials separately as per Technical Specification Clause 202 etc. complete & as per direction of the Engineer-in-Charge. |
| 5 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRD Specification for Rural roads Clause 201 by manual means as per the direction of the Engineer in charge. |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoRTH specifications for Road & Bridge works (4th revision) etc complete as per specification & direction of Engineer-in-Charge.. |
| 7 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). |
| 8 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m etc complete & as per direction of the Engineer-in-Charge. |
| 9 | Fine dressing and turfing including transportation by mechanical means with all leads and lifts and placing of turfs in position and ramming with thapies including watering and cost of labour and all materials but excluding the charges of GST etc complete as per specification & direction of Engineer-in-Charge. |
| 10 | Construction of granular sub-base by providing close grade granular sub-base grading-III material as per table-400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H Specifications as per the direction of the Engineer-in-Charge. |
| 11 | Providing , Laying, spreading and compacting graded stone aggregates in Wet Mix Macadam as per specification including premixing material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub-base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of MORTH specifications for road & bridge works (4th revision) including cost conveyance required as directed by Engineer-in-Charge. |
| 12 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means and including cost conveyance & royality of all materials & cost of all labour & T&P required for the work hire charges of machinaries etc complete as per Technical specification clause 502 of MORD for low porosity surface etc complete as per specification & direction of Engineer-in-Charge. |
| 13 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH specification for road & bridge works (4th revision) etc complete as per specification & direction of Engineer-in-Charge. |
| 14 | Providin & laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over previously prepared surface with hydrostatic paver finisher with sensore control to the required grade, level & alingment & roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 504 of MoSRT&H Specifications for road and bridge works (4th Revision) Page-169 Item -45 |
| 15 | Providing & laying Semi Dense Bituminous Concrete with batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen ,transporting the hot mix to work site ,laying with a hydrostatic paver finisher to the required grade,level & allignment and rolling with smooth wheeled ,vibratory and tandem roller to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (Latest Revision) etc complete including cost conveyance etc required as per specification & direction of Engineer-in-Charge. |
| 16 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501as per the direction of Engineer-In-Charge |
| 17 | Providing and Laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads@250 gms per sqm area,thicknessof 2.5mm is exclusive of surface applied glass beads as per IRC:35 etc. complete & as per direction of the Engineer-in-Charge |
| 18 | Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of Engineer-in-Charge. |
| 19 | Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. |
| 20 | PCC M-15 grade bed using 40mm to 10 mm size crushed stone aggregates mixed by concrete mixer laying in layers and compacting by vibrator & all leads and lifts as per approved drawing & technical specification and as per section 1700& 2100 of MORTH specification for road and bridge works (latest revision) including cost conveyance etc required as directed by Engineer-in-charge. |
| 21 | Foundation |
| 22 | Sub-Structure |
| 23 | R.C.C work of M-25 grade with 20mm and down grade black hard granite stone chips including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. |
| 24 | Foundation |
| 25 | Sub-Structure |
| 26 | Superstructure |
| 27 | Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications direction of Engineer in charge. |
| 28 | R.C.C M-30 grade in wearing course using 20mm and down grade BHGCB chips of approved quality from approved quarry including hoisting lowering and laying in position in layers with proper packing and ramming by means of vibrator to proper slope and level including watering and curring with cost conveyance royality of all materials required for the work including all labour,T&P for the work etc complete in all respect as per the specification and direction of Engineer-in-charge. |
| 29 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications etc. complete as per specification & direction of Engineer in charge. |
| 30 | Providing laying R.C.C. Hume pipe NP3 class for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection work, backfilling,concrete and masonry work in head walls and parapets clause 1106 of MORD specification for Rural roads and as per irection of Engineer-in charge. |
| 31 | 600 mm dia |
| 32 | 1000 mm dia |
| 33 | 300 mm dia |
| 34 | Providing Rough stone dry packing/pitching in slope protection wall approns and revetments to designed thickness using hard granite stones of required size of approved quality from approved quarry including quarrying supplying cinveying and cost conveyance royality of all materials including T&P complete including filling the interstices with small stones by wedging and hammering finished to proper slope and level but excluding the charges of GST as per direction of the Engineer-in-charge including dewatering if required. |
| 35 | Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 of MORD specification for Rural roads and as per direction of Engineer-in- charge. |
| 36 | Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2 of MoRD |
| 37 | 600mm equilateral triangle |
| 38 | 600mm Circular |
| 39 | Providing and fixing of typical informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing . |
| 40 | Providing and fixing of typical MMSYCitizen sign board with logo as per MORD specifications and drawing. Two MS plates of 2mm thick, top & middle plate duly welded with MS flat iron 25mmx5mm size on back on edges. The flat iron frame of both plate will be welded to 2nos 75mmx75mm of 12SWG sheet tubes posts duly embeded in C.C. M-15 grade blocks of 600mmx600mmx750mm, 750mm below ground level. The top most dimond plate will be welded to middle plate by 47mmx47mm of 12SWG steel tube. All M.S. will be stove enameled on both sides. Lettering & printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quailty in required shade & colour. All sections of framed posts & steel tubes will be painted with primer & two coats of paint as per drawing clause 1701 and Annexure 1700.1 and as per direction of Engineer-in-charge. |
| 41 | Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical specification. |
| 42 | Fixing of 5th. Km. Stone |
| 43 | Fixing of Km. Stone |
| 44 | Fixing or 200m Stone |
| 45 | Guard Post (M-20) |
| 46 | Maintenance |
| 47 | Maintenance Cost of Projects Road for the 1st Year |
| 48 | Maintenance Cost of Projects Road for the 2nd Year |
| 49 | Maintenance Cost of Projects Road for the 3rd Year |
| 50 | Maintenance Cost of Projects Road for the 4rth Year |
| 51 | Maintenance Cost of Projects Road for the 5th Year Please Enable Macros to View BoQ information |