Tender For Construction Of Flood Mitigation Structure And Berm Protection Over The Left Edge Of River Sutlej At Village Khilche Opposite Of Advance Bandh Rd 35500
Tender Overview
Project Description
Tender for Construction Of Flood Mitigation Structure And Berm Protection Over The Left Edge Of River Sutlej At Village Khilche Opposite Of Advance Bandh Rd 35500
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Jun-2026 | Corrigendum 2 | Date | 30-Jun-2026 |
| 2 | 23-Jun-2026 | Corrigendum 1 | Date | 26-Jun-2026 |
| 3 | 30-Jun-2026 | Corrigendum 3 | Date | 03-Jul-2026 |
| 4 | 03-Jul-2026 | Corrigendum 4 | Date | 06-Jul-2026 |
| 5 | 10-Jul-2026 | Corrigendum 6 | Date | 16-Jul-2026 |
| 6 | 11-Jun-2026 | Corrigendum | Date | 22-Jun-2026 |
| 7 | 16-Jul-2026 | Corrigendum8 | Date | 22-Jul-2026 |
| 8 | 06-Jul-2026 | Corrigendum 5 | Date | 10-Jul-2026 |
| 9 | 22-Jul-2026 | Corrigendum 9 | Date | 27-Jul-2026 |
| 10 | 27-Jul-2026 | Corrigendum10 | Date | 03-Aug-2026 |
| 11 | 23-Jun-2026 | Corrigendum 1 | Date | 26-Jun-2026 |
| 12 | 11-Jun-2026 | Corrigendum | Date | 22-Jun-2026 |
| 13 | 04-Aug-2026 | Corrigendum 7 | Date | 10-Aug-2026 |
| 14 | 11-Aug-2026 | Corrigendum 11 | Date | 17-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Filling of Stone or Spall into Crates and Hand Packing i/cSupply of Boulder Stone with weight 18 Kg. - 40 kg. andBoulder Stone with weight upto 18 Kg. not exceeding 10% oftotal quantity of Boulder Stone i/c Carriage of Boulder Stonefrom Quarry to site of work including loading & unloadingfrom quarry to stackyard, stacking and Re-carriage/Rehandeling of Boulder Stone from stackyard to site of worketc. Complete in all respect. |
| 2 | Weaving of Wire Netting for Wire Crates i/c binding sides & partitions to make Crates of 15 cm x 15 cm or 25 cm x 7.5 cm mesh i/c supply & carriage of M.S. Annealed Wire. |
| 3 | Tipping of Wire Crates including equipment |
| 4 | Excavation of soil using Excavator and hydraulic tractor trollyI/C cutting and loading in trolley and transporting to theembankment all locations including all lifts and leads,excluding royalty with an avg. lead 3 km |
| 5 | Supply and laying of graded filter with graded gravel 25 mmto 75 mm including loading, unloading carriage fromapproved quarry. Complete in all respect, as per drawing,design, spesifications & the instruction of Engineer incharge. |
| 6 | Supply of Stone or Spall for Pitching i/c Supply of BoulderStone with weight 3.6 Kg. - 18 kg. i/c Carriage of BoulderStone from Quarry to site of work including loading &unloading from quarry to site of work etc for pitching.Complete in all respect. On Level. |
| 7 | Supply of Stone or Spall for Pitching i/c Supply of BoulderStone with weight 3.6 Kg. - 18 kg. i/c Carriage of BoulderStone from Quarry to site of work including loading &unloading from quarry to site of work etc for pitching.Complete in all respect. On Slope |
| 8 | Filling stone or spall On level. |
| 9 | Filling stone or spall On side slopes behind pitching. |
| 10 | Grouting With Bajri or Shingle |
| 11 | Dismantling stone spalls or Brick bats filling .In wire cratesincluding opening of cratesand stacking crate material |
| 12 | Basic Rate of ordinary earth/clay taken from private landincluding compensation but excluding royalty Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-12 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-13 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-14 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender