| 1 | Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORTandH specifications |
| 2 | Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORTandH specifications |
| 3 | Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications |
| 4 | The Structural design and drawing of RCC Drain work will be submitted by the contractor to the department. dully vetted from Institute of reputed IIT, such as IIT Delhi, IIT Roorkee .The cost will be borne by the contractor. The work will be executed as per design drawing approved by department... |
| 5 | Providing and fixing factory-made wet cast high strength precast reinforced cement concrete box drain of Width X Height as per BOQ. Box Drain shall be steam cured in a controlled environment and manufactured by using high performance self compacting concrete of M- 50 grade using Fe 500 D grade TMT steel reinforcement bar. The Manhole opening at every 30 meter c/c shall be made by keeping as suitable clear opening of 600x600 mm in precast drain and the M.H. shaft shall be precast based on actual size requirement and Precast M.H. of size 800x 800 x 1600 and 800x 800 x 1100 or as per site requirement with all necessary arrangement of steps as per standard specification of Haryana PWD, schedule of rates 2023.The precast box drain and M.H. shall consist of special in-built inserts at appropriate location for safer and faster installation. Design should confirm to IRC/BIS standards/ Guidelines/Codes furthermore taking into consideration expected handling and erection stresses etc. Rubber gasket required to ensure water-tight character and for jointing of each segment flange bolts with zinc coating and round washer or equivalent nut-bolt connection will be supplied as part of the box drain. Any international guideline such as Japan and EURO codes may be followed in case of any gap in IRC/BIS standard and guideline. The design of the box drain and M.H. dully vetted from Institute of IIT/NIT . The precast drain should be designed considering super imposed dead load, live load including dynamic impact, tractive and braking forces and earth pressure as per IRC:6-2017. Class AA loading or Class 70R Load live load should be considered (whichever is higher) for design. Box drain shall have inter-locking plug-socket arrangement. Precast manufacturer shall be certified for ISO 9001, ISO 14001 and ISO 45001. The precast factory should have its own NABL approved QA-QC laboratory within plant premises to ensure daily testing of precast products. Product shall be manufactured using RO water for durability criteria. Reinforcement cage shall be fabricated with automated cage making unit within plant premises having necessary machines like cutting and bending for getting consistent rebar production. Final product testing laboratory to test load carrying capacity. The work executing as per the direction of Engineer In-charge of suitable height as per site requirement. The rates are including dismantling of existing road and other utility coming under the alignment, excavation, refilling of earth dully proper compacting, disposal of extra earth as per direction of Engineer-in-charge, shifting of utility as per site requirement, proper barricading of site, arrangement of diversion of traffic, making the site smooth in original condition prepare alignment for construction of road. complete in all respects including defect lability with operation and maintenance for five year after commissioning of work. Precast drain make:- Fuji Infrastructure Technology, Siddhivinayak Pre-cast Pipes Pvt. Ltd and Fuji Silvertech Concreate Pvt. Ltd. |
| 6 | [17.14.1]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 1. Grading I material [Through Rate] |
| 7 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] |
| 8 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] |
| 9 | [21.95.1]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 1. 350 mm [Through Rate] Please Enable Macros to View BoQ information |