|
| 1 | 12 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) |
| 2 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting,unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. |
| 3 | Providing unskilled labour for sweeping, cleaning of roads, drains, public places, schools, toilets, offices etc. complete for 8-hour duty including tools & tackles |
| 4 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 5 | Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) : Lead upto 4.00 KM |
| 6 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately): Holes 45 cm dia, and 45 cm deep. |
| 7 | Providing and stacking of Polyalthia longifolia (Ashok) of height 180-195 cm. in gunny bag of size 30 cm as per direction of the officer-in-charge. |
| 8 | Providing and stacking of Mangifera indica (Mango-grafted ) of height 60-75 cm. in big poly bag of size 25 cm as per direction of the officer-in-charge. |
| 9 | Providing and stacking of Eugenia jambolana (Jamun) of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge. Each |
| 10 | Making wall paintings on pre-painted wall surfaces with superior quality exterior/weather coat paint including one coat background painting of different shades over primer coat and artistic/pictorial figures, slogans, messages and awareness graphics on Swachhata Campaign theme for prominent display, including lettering, logos, sanitation awareness messages, cost of all paints, primer, labour, brushes, scaffolding, tools & plants and all incidental charges complete as per direction of Engineer-in-Charge. |
| 11 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 12 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 13 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |