| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | I Hook Clamp for PCC pole. |
| 3 | X Arm Clamp for PCC Pole with N/B. |
| 4 | F clamp. |
| 5 | LT clamp for PCC pole with N&B. |
| 6 | Stay clamp with Nut and Bolt PCC Pole 8.5 Mtr. |
| 7 | LT Shackle Insulator, 65x65mm. |
| 8 | Stay Insulator. |
| 9 | Annexure-B (Following work as per UPCL norms) |
| 10 | Fabrication of steel members including cutting, drilling, bending, welding, grinding, fitting, and assembling complete as per approved design, drawings, and technical specifications. |
| 11 | Excavation of pit for stay set of required size and depth in all types of soil, including dressing, ramming, disposal of excavated earth, and complete as per specification. |
| 12 | Erection of 11 kV stay set complete with stay rod, stay wire, turn buckle, thimble, stay clamp, guy insulator and all associated accessories, including fixing, tensioning, and making the stay arrangement complete as per approved specifications. |
| 13 | Grouting of stay set with cement concrete of specified grade, including placing, compacting, curing, and finishing complete as per approved drawings and technical specifications. |
| 14 | Excavation of pit for pole of required size and depth in all types of soil, including dressing of sides, dewatering (if required), disposal of surplus excavated earth, and complete as per approved specifications. |
| 15 | Erection of single PCC pole at the designated location, including lifting, positioning, plumbing, alignment, backfilling of excavated earth, ramming, and all incidental works required for complete installation as per approved specifications. |
| 16 | Providing and laying cement concrete grouting of specified grade around the erected pole foundation, including excavation dressing, mixing, placing, compacting, curing, and finishing complete in all respects as per approved specifications. |
| 17 | Laying, stringing, sagging and binding of 1-Phase 2-Wire LT overhead line using Weasel conductor, including all necessary accessories, jointing, fixing on insulators, and completion of the line in accordance with approved drawings and technical specifications |
| 18 | Lopping and chopping of tree branches along or near the electrical line corridor to maintain statutory safety clearance from conductors, including cutting, trimming, removal, and disposal of branches, complete as per departmental safety norms and specifications. |
| 19 | Cartage/transportation of PCC poles from the departmental store, supplier's premises, or designated stacking point to the work site for a lead distance of 21 km to 50 km, including loading, unloading, handling, and safe delivery complete. |
| 20 | Cartage/transportation of petty materials from the departmental store, supplier's premises, or designated stacking point to the work site for a lead distance of 21 km to 50 km, including loading, unloading, handling, stacking, and safe delivery complete. |
| 21 | Head-load/manual cartage of PCC poles from the unloading point or stacking location to the exact work site for a lead distance up to 1 km, including handling, shifting, loading/unloading, and positioning at site complete. |
| 22 | Installation and fixing of danger board and/or pole number plate on the electrical pole/structure at the designated location, including all necessary clamps, nuts, bolts, fittings, and accessories, complete as per departmental standards and specifications. |
| 23 | Straightening and realignment of tilted PCC pole to its correct vertical position, including excavation (where required), lifting, positioning, backfilling, ramming, grouting, and all incidental works necessary to restore the pole safely and securely as per departmental specifications. |
| 24 | Dismantling of existing conductor/jumper and re-jumpering of conductor at the required location, including cutting, jointing, binding, tightening, fixing on hardware fittings, and all associated works necessary for restoring continuity of the line, complete as per approved specifications and departmental standards. Please Enable Macros to View BoQ information |