| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | MS Nut and Bolt off size. |
| 3 | Holding Clamp J-I hook for AB cable. |
| 4 | LT Bare N. Conn. PG Clamp L-DB 120-25mm2. |
| 5 | Holding Clamp for PCC pole. |
| 6 | X Arm Clamp for PCC pole with N/B. |
| 7 | F-Clamp for PCC pole with Nut and Bolt. |
| 8 | LT Clamp for PCC pole. |
| 9 | Stay Clamp with Nut and Bolt for PCC pole.8.5 Mtr. |
| 10 | Suspension Clamp with Eye Hook. |
| 11 | MS Clamp PCC with Nut and Bolt for Susp. Clamp. |
| 12 | Dead end Clamp with I Hook. |
| 13 | HT Stay Insulator. |
| 14 | Insulated PRC (IPC 95-95 SQ.MM.) |
| 15 | Shear Head Type PRC 120 to 25 SQ.MM. |
| 16 | LT bare N. Connector PG Clamp 95-25mm2. |
| 17 | IPC for 120 sq.mm. to 120sq.mm. |
| 18 | LT DB Holding clamp with Nut and Bolt. |
| 19 | Head Shrink type end caps for LT ABC. |
| 20 | LT Distribution Box 3 Phase. |
| 21 | Al. Crimping type Lugs 25 sq.mm. |
| 22 | AL. lug 120sq.mm. |
| 23 | Al. Crimping type Lugs 240sq.mm. |
| 24 | Al. Lug 95sq.mm. |
| 25 | Annexure-B (Following work as per UPCL norms) |
| 26 | Erection of earthing Rod. |
| 27 | Fabrication of steel. |
| 28 | Excavation of pit for stay set. |
| 29 | Erection of 11 KV stay set. |
| 30 | Excavation of pit for pole. |
| 31 | Erection of single PCC pole. |
| 32 | Erection of PCC double Pole. |
| 33 | Erection of SP-55 double Pole. |
| 34 | Laying, Stringing and Fixing of LT Service Cable (Overhead), complete in all respects. |
| 35 | Installation, Erection, Testing and Commissioning of 100 KVA Distribution Transformer (DTR) on Double Pole Structure, complete with all necessary fittings, hardware and accessories. |
| 36 | Installation, Erection, Testing and Commissioning of 63 KVA Distribution Transformer (DTR) on Double Pole Structure, complete with all necessary fittings, hardware and accessories. |
| 37 | Laying/Stringing, Sagging, Testing and Commissioning of Weasel Conductor on HT Line, complete in all respects |
| 38 | Cartage of PCC pole, 51-70 Km. |
| 39 | Cartage of SP-55 pole, 51-70 Km. |
| 40 | Cartage of petty material, 51-70 Km. |
| 41 | Cartage of 63 KVA DTR, 51-70 Km. |
| 42 | Cartage of 100 KVA DTR, 51-70 Km. |
| 43 | Cartage of 250 KVA DTR, 51-70 Km. |
| 44 | Installation and Fixing of Aluminium Lugs suitable for LT AB Cable at Distribution Transformer (DTR), complete in all respects. |
| 45 | Fixing of Heat Shrink Cap for AB cable. |
| 46 | Fixing of Jointing sleeves for AB Cable. |
| 47 | Fixing of MS Clamp. |
| 48 | Installation of LT Distribution Box. |
| 49 | Fixing of Dead End Clamp. |
| 50 | Fixing of Suspension Clamp with I Hook. |
| 51 | Laying, Erection and Commissioning of LT AB Cable 3×120 + 95 Sq.mm. Please Enable Macros to View BoQ information |