| 1 | Cleaning of gate groove by removal of sand, mud, boulders, etc. C/R and H/R gates at right side and left side of main canal as per specification & direction of E/I . |
| 2 | Extraction of C/R and H/R gate from gate groove and Removal of shade,worm Gear machine system and operating platform etc. of C/R gate for fitting of new rubber seal and painting of both side gate etc. at right side and left side of main canal as per specification and direction of E/I. |
| 3 | Providing and laying of P.C.C. of P.C.C./R.C.C M -20 with nominal mix (1:1.5:3) for operating Platform, 03 nos C/R gate and 02 nos H/R gates |
| 4 | Fabrication and Erection of Clamping hooks,rubber seal, clamping plate of C/R gates at right side and left side of main canal as per specification and direction of E/I. |
| 5 | Fabrication and Erection of Clamping hooks,rubber seal, clamping plate of H/R gates at right side of main canal as per specification and direction of E/I. |
| 6 | Fabrication and Erection of Clamping hooks,rubber seal clamping plate of H/R gates at left side of main canal as per specification and direction of E/I. |
| 7 | Fabrication and Erection of CHEQURED PLATE of C/R Gate at Right side of main canal as per specification and direction of E/I. |
| 8 | Fabrication and Erection of CHEQURED PLATE of C/R Gate at Left side of main canal as per specification and direction of E/I. |
| 9 | Painting of 03 no C/R and 02 no H/R gates as per specification and direction of E/I. |
| 10 | Repair /Replacement of damaged/worn out parts of worm gear machine system and greasing ,changing lube oil and overhauling etc. including all charges (labour and workshop charges etc.) . |
| 11 | Installing of all C/R and H/R gate ,shade, worm gear machine system and operating platform etc. at right side and left side of main canal as per specification and direction of E/I. |
| 12 | Construction of coffer dam of C/R Gate at Right side of main canal by sand filling in empty cement plastic bags for stopping water into up stream and after complete the work disposal of coffer dam all complete job as per specification and direction of E/I. |
| 13 | Construction of coffer dam of C/R Gate at Left side of main canal by sand filling in empty cement plastic bags for stopping water into up stream and after complete the work disposal of coffer dam all complete job as per specification and direction of E/I. |
| 14 | Goods and Services Tax @18% |
| 15 | Labour cess@1% Please Enable Macros to View BoQ information |