| 1 | Cleaning of gate groove by removal of sand, mud, boulders, etc. of EMERGENCY GATES and SERVICE GATES at right side and left side of WELL as per specification & direction of E/I . |
| 2 | Extraction of EMERGENCY GATES and SERVICE GATES at right side and left side of WELL from gate groove and Removal of shade,worm Gear machine system and operating platform , Trash rack etc. for fitting of new rubber seal and painting of both side gate etc. as per specification and direction of E/I. |
| 3 | ismantling of P.C.C./R.C.C. of TRASH RACK of EMERGENCY GATES and SERVICE GATES at right side and left side of WELL DANRO RESERVOIR SCHEME as per direction of E/I. (SOR WRD part –B, page no-102, item no-5.1.18) |
| 4 | Providing and laying of P.C.C. of P.C.C./R.C.C M -20 with nominal mix (1:1.5:3) for Operating platform of 02 nos EMERGENCY gate and 02 SERVICE gates at left side and right side of well, for TRASH RACK of EMERGENCY AND SERVICE gates at right side and left side of well . |
| 5 | Fabrication and Erection of rubber seal clamping plate of EMERGENCY AND SERVICE gates at right side and left side of WELL as per specification and direction of E/I. |
| 6 | Fabrication and erection of Chequrred plate,Ladder etc. of left side and right side of the well as per direction and specification of E/I. |
| 7 | Supply,fitting and fixing M.S Extension pipe of dia 8 inch and 8mm thick at right side and left side of WELL . |
| 8 | Flange coupling male and female suitable for 8 inch dia extension pipe fitting at right side and left side of WELL . |
| 9 | Fabrication, fitting and fixing of trash rack as per direction of E/I. (SIZE=1.5MX1.5M) at right side and left side of WELL |
| 10 | Fabrication and Erection of new Entrance Door and Window of DANRO RESERVIOR SCHEME With all cost of materials all complete job at right side and left side of WELL as per specification and direction of E/I. |
| 11 | HIRING CHARGE OF DIESEL PUMP FOR DEWATERING at right side and left side of WELL . |
| 12 | Cleaning of well, tunnel, (Upstream), removing Desalting including labour cost all job with cost of material at right side and left side of WELL as per direction of E/I. |
| 13 | Painting of 02 no EMERGENCY GATES and 02 no SERVICE gates at right side and left side of WELL as per specification and direction of E/I. |
| 14 | Repair /Replacement of damaged/worn out parts pf worm gear machine system and greasing ,changing lube oil and overhauling etc. including all charges (labour and workshoap charges etc.) at right side and left side of WELL. |
| 15 | Installing of all Emergency gate and Service gate ,shade, worm gear machine system and operating platform etc. left side and right side of the well as per specification and direction of E/I.. |
| 16 | Construction and Disposal of coffer dam for DANRO RESERVOIR SCHEME all complete job at right side and left side of WELL as per specification and direction of E/I. |
| 17 | Goods and Services Tax @18% |
| 18 | Labour cess@1% Please Enable Macros to View BoQ information |