Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 19-06-2026 | NIET NO- 01 of the FY 2026-2027 of the SE, PIU-Bankura, WBDWSIP, PHE Dte.(SL.NO-01).... | Other | 25-07-2026 |
| 2 | 19-06-2026 | NIET NO- 01 of the FY 2026-2027 of the SE, PIU-Bankura, WBDWSIP, PHE Dte.(SL.NO-01)... | Other | 25-07-2026 |
| 3 | 19-06-2026 | NIET NO- 01 of the FY 2026-2027 of the SE, PIU-Bankura, WBDWSIP, PHE Dte.(SL.NO-01).. | Other | 25-07-2026 |
| 4 | 19-06-2026 | NIET NO- 01 of the FY 2026-2027 of the SE, PIU-Bankura, WBDWSIP, PHE Dte.(SL.NO-01). | Other | 25-07-2026 |
| 5 | 19-06-2026 | NIET NO- 01 of the FY 2026-2027 of the SE, PIU-Bankura, WBDWSIP, PHE Dte.(SL.NO-01) | Other | 25-07-2026 |
| Sl. No. | Item Description |
| 1 | Raw water Intake Structure (Pile Supported) cum pump house including approach bridge as per scope and technical specifications. |
| 2 | Mechanical Works |
| 3 | Vertical turbine pumps, column pipe assembly and all accessories and drive motors of duty points / rating based on the minimum requirements as described in the technical specifications and requirements or as required all complete as per scope of works. |
| 4 | Pipes, fittings and specials, valves on pump discharge pipe including swing check valves, butterfly valves, sluice valves, air release valves and other apputenances with necessary provision for auto / manual control and operation as described in the technical specifications and requirements or as required all complete as per scope of works (Supply partially made by Oter Agency) |
| 5 | EOT Cranes with accessories as described in the technical specifications and requirements or as required all complete as per scope of works |
| 6 | Miscellaneous equipment including ventilation system, fire extinguishers etc as described in the technical specifications and requirements or as required all complete as per scope of works (excluding Onshore Tranformer and DG Yard/Substation Building) |
| 7 | Any other item and sub items not specified in the above but required to complete the work as described in the technical specifications and requirements or as required all complete as per scope of works |
| 8 | Electrical Work |
| 9 | LT MCC Switchgear for VT Pump-motor, Soft starters , LPBS, Miscellaneous panels including lighting panels, Aux. as described in the technical specifications and revised requirements for Intake Pump House as required all complete as per scope of works. |
| 10 | Complete lighting system in all the civil structures and buildings (including approach bridge) including fixtures, poles, wires, conduits, cables, wiring and necessary accessories including Emergency lighting systems with lighting fixtures and cables as described in the technical specifications and requirements or as required all complete as per scope of works (excluding Onshore Tranformer and DG Yard/Substation building) |
| 11 | Supply of Complete cabling system with LT, instrumentation and control cables, cable trays (Including Cable Laying on approach bridge) and accessoriesas described in the technical specifications and requirements or as required all complete as per scope of works |
| 12 | Earthing for all equipments including earthing pits as necessary, including Lightning protection system for all civil structures and buildings as described in the technical specifications and requirements all complete as per scope of works.(excluding Onshore Tranformer and DG Yard/Substation building) |
| 13 | Any other item and sub items not specified in the above but required to be procured to complete the works |
| 14 | Instrumentation and Control Work: Supply of Instrumentation and SCADA Control Equipment (Installation of equipment including, but not limited to secure storage, protection, erection, installation and initial testing. Items not listed and required for completing the job shall be supplied by contractor as a part of the installation without any additional payment) as described in the technical specifications and requirements or as required all complete as per scope of works.Supply of Redundant SCADA control system for remote monitoring and control in the central SCADA room including work station for SCADA server, data server, web server complete with server rack panel, PC with monitor for operator stations, laptop, LED display, , printer, necessary software and hardware, internet leased line for for SCADA webcast as described in the technical specifications and requirements or as required all complete as per scope of works. Field Instrument & Cabling System for Raw Water Intake PS as per technical specifications and requirements all complete as per scope of works. |
| 15 | Supply of Electromagnetic Flowmeter in Common Header pipe 800 NB |
| 16 | Supply of Pressure Transmitter (Smart Electronic 2-Wire type 4-20 mA DC Output load with local LCD Display and HART Supported, Accuracy +1% of span or better reaptibilty of ±1% of span. |
| 17 | .Supply of Radar Level Tranmitter (Range 20m) |
| 18 | Supply of Pressure gauge ( Bourdon/Bellow/Diaphram Operation, minimum 150 mm dial size, MOC- AISI 360SS, Movement AISI 316SS, Case material SS 314,IP -65, accuracy ±1%, 0-16 Kg/cm²) |
| 19 | Supply of Instrumentation Cabling system including all GI perforated cable trays, prefabricated GI bends and Tees for cable trays with all nut and bolts, etc. as per employers requirements. |
| 20 | Water Treatment Plant |
| 21 | Mechanical Work |
| 22 | Stilling Chamber and Parshall Flume: Motorised inlet and outlet valves with provision for auto/manual operation (with valve operating platform) and dismantling joints and piping, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders, valve operating platforms etc, Bypass pipe with valves, fittings and specials, Motorised drop gate/sluice gates, with provision for auto/manual operation, at the exit of Parshall flume. |
| 23 | Flash Mixer: Agitator/Flash Mixers complete with motor assembly, reduction gear, base frame etc, Motorised inlet and outlet valves with provision for auto/manual operation (with valve operating platform) and dismantling joints and piping, Draining pipe with motorised valves with provision for auto/manual control, connecting pipes, specials, fittings for draining to sludge collection sump, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders, operating platforms etc. |
| 24 | Clariflocculator |
| 25 | Clarifier Bridge Assembly alongwith flocculators including support, clips, etc, Metal works including handrails, step irons, steel ladders, operating platforms etc. |
| 26 | Telescopic sludge bleeding arrangement, Bottom Sludge scraping arrangement complete with motor assembly, reduction gear, scraper blades etc, Sludge extraction piping with motorised isolation valves, fittings and specials, dismantling joints, including extraction header pipes. |
| 27 | Clarified Water collector arrangement including weir plates |
| 28 | Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks |
| 29 | Rapid Sand Filters, Pipe gallery and Filter Annex Building |
| 30 | Filter Sand and Supporting gravel pack, Under drain systems with filter nozzles, Wash water drain troughs, Motoried inlet gates or valves with provision for auto/manual control, Motorised Filtered water outlet valves with provision for auto/manual control, Motorised wash water drain gates or valves with provision for auto/manual control, Motorised Air Scour valves with provision for auto/manual control, Filtered water Flow meters (ROF and LOF) with provision for relay of the data, All necessary valves for filter drain and Air release with motorised control and provision for auto/manual control, Piping including fittings, dismantling joints and specials, Backwash water flow measuring and control system including flow control valve and associate piping, Sump drain pumps with piping, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders etc. |
| 31 | Air Blower of required capacity along with silencer, motor, suction filter, NRV, discharge isolation valve, V-belt and pulley, acoustic hood, pressure gauge, pressure switch and common base frame etc. |
| 32 | Miscellaneous equipment including ventilation system, fire extinguishers etc. |
| 33 | EOT monorail hoist with accessories for handling of blower system |
| 34 | Chemical House: Mixer of Alum mixing/storage tank with Alum dilution trays, Chemical transfer/dosing pumps for Alum solution with suction/delivery pipes, valve,fittings and specials , Alum dosage chambers with pipes, motorised valves, fittings and specials, Alum dosage pipes, motorised valves, fittings and specials from the chemical house to dosage point with a difiuser, Polymer solution preparation and dosage pump with suction and delivery pipes, motorised valves, fittings and specials, Polymer dosage pipes, motorised valves, fittings and specials from the chemical house to dosage points with diffusers, All other pipes, motorised valves, fittings and specials for utility water supply, overflow and drain in the chemical house, Sump drain pumps with piping, Metal works including handrails, step irons, steel ladders, hatches, Ventilation, fire extinguishers, dust collectors, exhaust fans of lime powder feeding, Weighing Machine of 1000 kg capacity etc. as per technical specification and requirements all complete |
| 35 | Chlorine Building |
| 36 | Weigh-scale suitable for chlorine cylinders, Vacuum type Chlorinator for pre-chlorination, Vacuum type chlorinator for post-Chlorination, Chlorine ejector for pre and post chlorination, Utility water boosting pumps and motors with pipes, valves, fittings and specials, Chlorine gas and solution pipes, valves, fittings and specials from the chlorine building upto dosage points (pre and post chlorination), Safety Equipment as per technical specification and requirements all complete |
| 37 | Chlorine cylinders / tonners as required as per technical specification and requirements all complete |
| 38 | Filter Backwash arrangement: Horizontal Centrifugal pumps including motors and piping for pumping to Overhead reservoir, Horizontal pumps including motors and piping for surface wash of filter beds and clariflocculator and motorized inlet gate or valve with provision of auto/manual handling, dismantling joints, specials and piping, Metal works including handrails, step irons, steel ladders etc. as per technical specification and requirements all complete. |
| 39 | Sludge sump cum Pump House: Motorised inlet gate or valve with provision of auto/manual handling, dismantling joints, specials and piping, Metal works including handrails, step irons, steel ladders etc. , Horizontal centrifugal pump and motor with motorised valves, dismantling joints, pipings,fittings etc for conveyance of sludge to Sludge Lagoon, as per technical specification and requirements all complete. |
| 40 | Plant piping: Interconnection pipe between inlet chamber, flash mixing tanks including pipes, fittings, dismantling joints, and specials, Interconnection between flash mixing tanks and Clariflocculator including pipes, fittings, dismantling joints and specials, Interconnection between Clariflocculator and clear water reservoir including pipes, fittings, dismantling joints and specials, Interconnection between rapid sand filters and clear water reservoir including pipes, fittings, dismantling joints and specials, Sludge drain pipe between the treatment units upto Sludge holding tanks including pipes, specials, dismantling joints, Interconnecting pipes between Sludge Sump, sludge Lagoon as per technical specification and requirments all complete. |
| 41 | Clear Water Reservoir cum Pumping Station |
| 42 | Horizontal Centrifugal pumps including motors as specified in the technical specification all complete. |
| 43 | Pipes, fittings and specials, Valves on pump discharge pipe including check valves, butterfly valves, sluice valves, air release valve and other ancillary valves with necessary provision for auto/manual control of with necessary protection against thrust force, Motorised Sluice gates with provision for auto/manual operation, Inlet and outlet gates/valves of reservoirs, Sump drain pumps with piping, Inlet pipes, drain pipes, overflow pipes of reservoir with fittings and special upto outer wall of reservoirs/ valve chambers, Dewatering pump with piping, Surge Protection System including ventilation arrangement, etc. |
| 44 | EOT Crane with accessories |
| 45 | Miscellaneous equipment including ventilation system, fire extinguishers etc. |
| 46 | Miscellanous Equipments and Furniture |
| 47 | Water quality analyzer rack, Laboratory equipment /apparatus including Laboratory reagent, Laboratory glassware's and reagents |
| 48 | Sampling table complete with pumps, pipelines, valves etc, Sampling pumps with piping from sampling points to laboratory |
| 49 | Air conditioning, ventilation system along with rain protection cowl and bird screen, fire extinguishers etc. |
| 50 | Furniture for Administrative Building, Chemical House (Laboratory furniture), Chlorination Building, Filter Annex Building, Staff Quarter, Guard Room. |
| 51 | Any other item and sub items not specified in the above but required to complete the works |
| 52 | Electrical work |
| 53 | Power substation- 33KV Indoor switchboard |
| 54 | 33KV/0.433 KV transformers with OLTC and Automatic Voltage Regulator |
| 55 | 415V indoor switch board/MCC/PDB, Soft starters, Capacitors, LPBS, bus-duct, Electrical control panel set for filter bed system, Electrical control panel set for filter bed system, 110 V Ni-Cd batteries including battery chargers and Distribution panels |
| 56 | Complete lighting system in all the civil structures and buildings (including street poles on approach road, interplant roads and pathways and adequate number of high mast lighting arrangement with lightning arrestors) including fixtures, poles, wires, conduits, cables, wiring and necessary accessories including Emergency lighting systems with lighting fixtures and cables, Miscellaneous panels including lighting panels |
| 57 | Complete cabling system with HT, LT, instrumentation and control cables, cable trays and accessories |
| 58 | Earthing for all equipments including earthing pits as necessary, including Lightning protection system for all civil structures and buildings. |
| 59 | 415V 200KVA DG set with AMF panel & accessories. |
| 60 | Any other item and sub items not specified in the above but required to complete the works |
| 61 | Instrumentation and Automation |
| 62 | SCADA control system for remote monitoring and control in the central SCADA room including work station for SCADA server, data server, web server complete with server rack panel, PC with monitor for operator stations, laptop, LED display, , printer, necessary software and hardware, internet leased line for for SCADA webcast |
| 63 | UPS for SCADA and monitring, Surveillance and Telephone system etc with UPS panel |
| 64 | Main CPU Controller Panel with Remote I/O PLC panel, RTU for RWPS, CWPS, substation, different WTP units, desktop PC for local HMI, at specified locations including PLC/ICP with software and hardware with complete ancillary equipment. |
| 65 | Instruments like flow meter with transmitter and smart remote display,level sensor with local display and trasmitter, Water quality measurement equipment including analyzer, sensor, local display, necessary weather protection enclosure, transmitter complete with all cables and accessories, Pressure transmitter, Instrumentation and control cables including cable trays, racks, ducts, OFC, LAN cable, conduit cable laying pipe, multiport switch, etc. |
| 66 | IP EPABX Telephone system, IP PA Emergency Announcement system, CCTV monitoring system for WTP and all other remote areas. |
| 67 | Fiber Optic L2 Switch communication system betweenremote locations and WTP through Armoured Single Mode OFC with HDPE pipe conduit complete with enclosure, and all accessories. |
| 68 | Any other item and sub items not specified in the above but required to complete the works. |
| 69 | Clear Water Transmission main |
| 70 | Supply of (MS, DI) Pipes, Specials, Fittings and Pipeline appurtenances at site including transportation, insurance etc. complete with all accessories from WTP to Intermediate Ground Level Storage Reservoir as per technical specificaiton and requirments. |
| 71 | Intermediate Ground Level Storage Reservoir |
| 72 | All piping and appurtenances,Motorised Sluice gates with provision for auto/manual operation, Inlet and outlet gates/valves of reservoirs, Sump drain pumps with piping, Inlet pipes, drain pipes, overflow pipes of reservoir with fittings and special upto outer wall of reservoirs/ valve chambers including ventilation arrangement all complete as required as per technical specificaiton and requirments. |
| 73 | Raw water Intake Structure (Pile Supported) cum pump house including approach bridge as per scope and technical specifications. |
| 74 | Mechanical Works |
| 75 | Vertical turbine pumps, column pipe assembly and all accessories and drive motors of duty points / rating based on the minimum requirements as described in the technical specifications and requirements or as required all complete as per scope of works. |
| 76 | Pipes, fittings and specials, valves on pump discharge pipe including swing check valves, butterfly valves, sluice valves, air release valves and other apputenances with necessary provision for auto / manual control and operation as described in the technical specifications and requirements or as required all complete as per scope of works (Supply partially made by Oter Agency) |
| 77 | EOT Cranes with accessories as described in the technical specifications and requirements or as required all complete as per scope of works |
| 78 | Miscellaneous equipment including ventilation system, fire extinguishers etc as described in the technical specifications and requirements or as required all complete as per scope of works (excluding Onshore Tranformer and DG Yard/Substation Building) |
| 79 | Any other item and sub items not specified in the above but required to complete the work as described in the technical specifications and requirements or as required all complete as per scope of works |
| 80 | Electrical Work |
| 81 | LT MCC Switchgear for VT Pump-motor, Soft starters , LPBS, Miscellaneous panels including lighting panels, Aux. as described in the technical specifications and revised requirements for Intake Pump House as required all complete as per scope of works. |
| 82 | Complete lighting system in all the civil structures and buildings (including approach bridge) including fixtures, poles, wires, conduits, cables, wiring and necessary accessories including Emergency lighting systems with lighting fixtures and cables as described in the technical specifications and requirements or as required all complete as per scope of works (excluding Onshore Tranformer and DG Yard/Substation building) |
| 83 | Supply of Complete cabling system with LT, instrumentation and control cables, cable trays (Including Cable Laying on approach bridge) and accessoriesas described in the technical specifications and requirements or as required all complete as per scope of works |
| 84 | Earthing for all equipments including earthing pits as necessary, including Lightning protection system for all civil structures and buildings as described in the technical specifications and requirements all complete as per scope of works.(excluding Onshore Tranformer and DG Yard/Substation building) |
| 85 | Any other item and sub items not specified in the above but required to be procured to complete the works |
| 86 | Instrumentation and Control Work: Supply of Instrumentation and SCADA Control Equipment (Installation of equipment including, but not limited to secure storage, protection, erection, installation and initial testing. Items not listed and required for completing the job shall be supplied by contractor as a part of the installation without any additional payment) as described in the technical specifications and requirements or as required all complete as per scope of works.Supply of Redundant SCADA control system for remote monitoring and control in the central SCADA room including work station for SCADA server, data server, web server complete with server rack panel, PC with monitor for operator stations, laptop, LED display, , printer, necessary software and hardware, internet leased line for for SCADA webcast as described in the technical specifications and requirements or as required all complete as per scope of works. Field Instrument & Cabling System for Raw Water Intake PS as per technical specifications and requirements all complete as per scope of works. |
| 87 | Supply of Electromagnetic Flowmeter in Common Header pipe 800 NB |
| 88 | Supply of Pressure Transmitter (Smart Electronic 2-Wire type 4-20 mA DC Output load with local LCD Display and HART Supported, Accuracy +1% of span or better reaptibilty of ±1% of span. |
| 89 | .Supply of Radar Level Tranmitter (Range 20m) |
| 90 | Supply of Pressure gauge ( Bourdon/Bellow/Diaphram Operation, minimum 150 mm dial size, MOC- AISI 360SS, Movement AISI 316SS, Case material SS 314,IP -65, accuracy ±1%, 0-16 Kg/cm²) |
| 91 | Supply of Instrumentation Cabling system including all GI perforated cable trays, prefabricated GI bends and Tees for cable trays with all nut and bolts, etc. as per employers requirements. |
| 92 | Water Treatment Plant |
| 93 | Mechanical Work |
| 94 | Stilling Chamber and Parshall Flume: Motorised inlet and outlet valves with provision for auto/manual operation (with valve operating platform) and dismantling joints and piping, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders, valve operating platforms etc, Bypass pipe with valves, fittings and specials, Motorised drop gate/sluice gates, with provision for auto/manual operation, at the exit of Parshall flume. |
| 95 | Flash Mixer: Agitator/Flash Mixers complete with motor assembly, reduction gear, base frame etc, Motorised inlet and outlet valves with provision for auto/manual operation (with valve operating platform) and dismantling joints and piping, Draining pipe with motorised valves with provision for auto/manual control, connecting pipes, specials, fittings for draining to sludge collection sump, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders, operating platforms etc. |
| 96 | Clariflocculator |
| 97 | Clarifier Bridge Assembly alongwith flocculators including support, clips, etc, Metal works including handrails, step irons, steel ladders, operating platforms etc. |
| 98 | Telescopic sludge bleeding arrangement, Bottom Sludge scraping arrangement complete with motor assembly, reduction gear, scraper blades etc, Sludge extraction piping with motorised isolation valves, fittings and specials, dismantling joints, including extraction header pipes. |
| 99 | Clarified Water collector arrangement including weir plates |
| 100 | Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks |
| 101 | Rapid Sand Filters, Pipe gallery and Filter Annex Building |
| 102 | Filter Sand and Supporting gravel pack, Under drain systems with filter nozzles, Wash water drain troughs, Motoried inlet gates or valves with provision for auto/manual control, Motorised Filtered water outlet valves with provision for auto/manual control, Motorised wash water drain gates or valves with provision for auto/manual control, Motorised Air Scour valves with provision for auto/manual control, Filtered water Flow meters (ROF and LOF) with provision for relay of the data, All necessary valves for filter drain and Air release with motorised control and provision for auto/manual control, Piping including fittings, dismantling joints and specials, Backwash water flow measuring and control system including flow control valve and associate piping, Sump drain pumps with piping, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders etc. |
| 103 | Air Blower of required capacity along with silencer, motor, suction filter, NRV, discharge isolation valve, V-belt and pulley, acoustic hood, pressure gauge, pressure switch and common base frame etc. |
| 104 | Miscellaneous equipment including ventilation system, fire extinguishers etc. |
| 105 | EOT monorail hoist with accessories for handling of blower system |
| 106 | Chemical House: Mixer of Alum mixing/storage tank with Alum dilution trays, Chemical transfer/dosing pumps for Alum solution with suction/delivery pipes, valve,fittings and specials , Alum dosage chambers with pipes, motorised valves, fittings and specials, Alum dosage pipes, motorised valves, fittings and specials from the chemical house to dosage point with a difiuser, Polymer solution preparation and dosage pump with suction and delivery pipes, motorised valves, fittings and specials, Polymer dosage pipes, motorised valves, fittings and specials from the chemical house to dosage points with diffusers, All other pipes, motorised valves, fittings and specials for utility water supply, overflow and drain in the chemical house, Sump drain pumps with piping, Metal works including handrails, step irons, steel ladders, hatches, Ventilation, fire extinguishers, dust collectors, exhaust fans of lime powder feeding, Weighing Machine of 1000 kg capacity etc. as per technical specification and requirements all complete |
| 107 | Chlorine Building |
| 108 | Weigh-scale suitable for chlorine cylinders, Vacuum type Chlorinator for pre-chlorination, Vacuum type chlorinator for post-Chlorination, Chlorine ejector for pre and post chlorination, Utility water boosting pumps and motors with pipes, valves, fittings and specials, Chlorine gas and solution pipes, valves, fittings and specials from the chlorine building upto dosage points (pre and post chlorination), Safety Equipment as per technical specification and requirements all complete |
| 109 | Chlorine cylinders / tonners as required as per technical specification and requirements all complete |
| 110 | Filter Backwash arrangement: Horizontal Centrifugal pumps including motors and piping for pumping to Overhead reservoir, Horizontal pumps including motors and piping for surface wash of filter beds and clariflocculator and motorized inlet gate or valve with provision of auto/manual handling, dismantling joints, specials and piping, Metal works including handrails, step irons, steel ladders etc. as per technical specification and requirements all complete. |
| 111 | Sludge sump cum Pump House: Motorised inlet gate or valve with provision of auto/manual handling, dismantling joints, specials and piping, Metal works including handrails, step irons, steel ladders etc. , Horizontal centrifugal pump and motor with motorised valves, dismantling joints, pipings,fittings etc for conveyance of sludge to Sludge Lagoon, as per technical specification and requirements all complete. |
| 112 | Plant piping: Interconnection pipe between inlet chamber, flash mixing tanks including pipes, fittings, dismantling joints, and specials, Interconnection between flash mixing tanks and Clariflocculator including pipes, fittings, dismantling joints and specials, Interconnection between Clariflocculator and clear water reservoir including pipes, fittings, dismantling joints and specials, Interconnection between rapid sand filters and clear water reservoir including pipes, fittings, dismantling joints and specials, Sludge drain pipe between the treatment units upto Sludge holding tanks including pipes, specials, dismantling joints, Interconnecting pipes between Sludge Sump, sludge Lagoon as per technical specification and requirments all complete. |
| 113 | Clear Water Reservoir cum Pumping Station |
| 114 | Horizontal Centrifugal pumps including motors as specified in the technical specification all complete. |
| 115 | Pipes, fittings and specials, Valves on pump discharge pipe including check valves, butterfly valves, sluice valves, air release valve and other ancillary valves with necessary provision for auto/manual control of with necessary protection against thrust force, Motorised Sluice gates with provision for auto/manual operation, Inlet and outlet gates/valves of reservoirs, Sump drain pumps with piping, Inlet pipes, drain pipes, overflow pipes of reservoir with fittings and special upto outer wall of reservoirs/ valve chambers, Dewatering pump with piping, Surge Protection System including ventilation arrangement, etc. |
| 116 | EOT Crane with accessories |
| 117 | Miscellaneous equipment including ventilation system, fire extinguishers etc. |
| 118 | Miscellanous Equipments and Furniture |
| 119 | Water quality analyzer rack, Laboratory equipment /apparatus including Laboratory reagent, Laboratory glassware's and reagents |
| 120 | Sampling table complete with pumps, pipelines, valves etc, Sampling pumps with piping from sampling points to laboratory |
| 121 | Air conditioning, ventilation system along with rain protection cowl and bird screen, fire extinguishers etc. |
| 122 | Furniture for Administrative Building, Chemical House (Laboratory furniture), Chlorination Building, Filter Annex Building, Staff Quarter, Guard Room. |
| 123 | Any other item and sub items not specified in the above but required to complete the works |
| 124 | Electrical work |
| 125 | Power substation- 33KV Indoor switchboard |
| 126 | 33KV/0.433 KV transformers with OLTC and Automatic Voltage Regulator |
| 127 | 415V indoor switch board/MCC/PDB, Soft starters, Capacitors, LPBS, bus-duct, Electrical control panel set for filter bed system, Electrical control panel set for filter bed system, 110 V Ni-Cd batteries including battery chargers and Distribution panels |
| 128 | Complete lighting system in all the civil structures and buildings (including street poles on approach road, interplant roads and pathways and adequate number of high mast lighting arrangement with lightning arrestors) including fixtures, poles, wires, conduits, cables, wiring and necessary accessories including Emergency lighting systems with lighting fixtures and cables, Miscellaneous panels including lighting panels |
| 129 | Complete cabling system with HT, LT, instrumentation and control cables, cable trays and accessories |
| 130 | Earthing for all equipments including earthing pits as necessary, including Lightning protection system for all civil structures and buildings. |
| 131 | 415V 200KVA DG set with AMF panel & accessories. |
| 132 | Any other item and sub items not specified in the above but required to complete the works |
| 133 | Instrumentation and Automation |
| 134 | SCADA control system for remote monitoring and control in the central SCADA room including work station for SCADA server, data server, web server complete with server rack panel, PC with monitor for operator stations, laptop, LED display, , printer, necessary software and hardware, internet leased line for for SCADA webcast |
| 135 | UPS for SCADA and monitring, Surveillance and Telephone system etc with UPS panel |
| 136 | Main CPU Controller Panel with Remote I/O PLC panel, RTU for RWPS, CWPS, substation, different WTP units, desktop PC for local HMI, at specified locations including PLC/ICP with software and hardware with complete ancillary equipment. |
| 137 | Instruments like flow meter with transmitter and smart remote display,level sensor with local display and trasmitter, Water quality measurement equipment including analyzer, sensor, local display, necessary weather protection enclosure, transmitter complete with all cables and accessories, Pressure transmitter, Instrumentation and control cables including cable trays, racks, ducts, OFC, LAN cable, conduit cable laying pipe, multiport switch, etc. |
| 138 | IP EPABX Telephone system, IP PA Emergency Announcement system, CCTV monitoring system for WTP and all other remote areas. |
| 139 | Fiber Optic L2 Switch communication system betweenremote locations and WTP through Armoured Single Mode OFC with HDPE pipe conduit complete with enclosure, and all accessories. |
| 140 | Any other item and sub items not specified in the above but required to complete the works. |
| 141 | Clear Water Transmission main |
| 142 | Supply of (MS, DI) Pipes, Specials, Fittings and Pipeline appurtenances at site including transportation, insurance etc. complete with all accessories from WTP to Intermediate Ground Level Storage Reservoir as per technical specificaiton and requirments. |
| 143 | Intermediate Ground Level Storage Reservoir |
| 144 | All piping and appurtenances,Motorised Sluice gates with provision for auto/manual operation, Inlet and outlet gates/valves of reservoirs, Sump drain pumps with piping, Inlet pipes, drain pipes, overflow pipes of reservoir with fittings and special upto outer wall of reservoirs/ valve chambers including ventilation arrangement all complete as required as per technical specificaiton and requirments. |
| 145 | Raw water Intake Structure (Pile Supported) cum pump house including approach bridge.Bathymetry survey in the reservoir area to identify the most viable location of the raw water intake sump and its surroundings by measurement of depth of water level including preparation of detailed bed contour map complete as per technical requirements and specification all complete as per scopeof work. |
| 146 | Geotechnical exploration by boring at required location for identification of strata, collection of samples for detailed investigation in laboratory and submission of the exploration report,including recommendation for type of structure and bearing capacity at various depths as per technical requirements and specification all complete as per scope of work. |
| 147 | Topographical and Contour / level survey work using total station or any other instrument along the alignment of raw water transmission main complete as per technical requirements and specification all complete as per scope of work. |
| 148 | Planning, designing, preparation of site layout plan, construction drawings/ other drawings/including submission of all supporting design calculations of work inclusive of all design and drawings and other allied works. and cost of any software that might be required to carry out the design including but not limited to the following: (a) Design basis report, (b) Selection of Electrical-Mechanical equipment (pumps, motors, valves, cranes etc) including determination of economic diameter of transmission main including surge analysis, (c) General arrangement of raw water intake sump and pumping station, (d) Make, design parameter, drawings and specifications of equipment for supply items, (e) General layout of the pipes, electrical system etc (f) Preparation of architectural and MEP drawings (g) Structural designs and drawings for all Civil Works. The scope shall also include validation of the design & drawings already reviewed and approved by the Employer's Representative. |
| 149 | Planning, designing of all Mechanical works |
| 150 | Planning, designing of all Electrical works |
| 151 | Planning, designing of Instrumentation works and SCADA, Telecommunication and Surveillance system |
| 152 | Raw Transmission Main |
| 153 | Geotechnical exploration by boring at required location for identification of strata, collection of samples for detailed investigation in laboratory and submission of the exploration report,including recommendation for type of structure and bearing capacity at various depths as per technical requirements and specification all complete as per scope of work including soil resistivity work |
| 154 | Topographical and Contour / level survey work using total station or any other instrument along the alignment of raw water transmission main complete as per technical requirements and specification all complete as per scope of work. |
| 155 | Planning, designing, preparation of site layout plan, construction drawings/ other drawings/including submission of all supporting design calculations of work inclusive of all design and drawings and other allied works. and cost of any software that might be required to carry out the design including but not limited to the following: (a) Design basis report, (b) Finalization of route of pipeline, (c) Detailed design of the transmission main including surge analysis, (d) Layout plan and longitudinal section of the pipeline showing location of valves pipeline appurtenances and (e) Design of pipe bridges, including approach bridge to the Intake, thrust blocks, pipe supporting structures any other pipe appurtenant structures as might be required including preparation of detailed working drawings all complete.The scope shall also include validation of the design & drawings already reviewed and approved by the Employer's Representative. |
| 156 | Water Treatment Plant |
| 157 | Topographical survey work with total station or any other instrument of total area of the proposed WTP and CWR and its surroundings including spot levels of the area by formation of 5m grid. |
| 158 | Geotechnical exploration by boring at the location of proposed water treament plant for identification of strata, collection of samples for detailed investigation in laboratory and submission of the exploration report including Soil resistivity test. |
| 159 | Sampling and Raw water quality analysis from the reservoir site to assess the water quality requirements as per technical requirements and specification complete as per scope of work. |
| 160 | Planning, designing, preparation of site layout plan, construction/ other drawings/including submission of all supporting design calculations of work and approval by the Employer's Representative. The rate should be inclusive of all design and other allied works. and cost of any software that might be required to carry out the design including the following: (a) Design basis report, (b) Process and hydraulic design, HFD, plant layout drawing, general arrangement of individual units (c) Water treatment plant layout and hydraulic flow diagram (d) P&ID, Plant control and operation philosophy, (e) Selection of all the equipment/ pumping plant, design parameters, drawings and specifications of equipment as per make of supply items (f) Preparation of architectural and MEP drawings, (g) Structural designs and drawings (h) Process design etc including all associated Civil Works. The scope shall also include validation of the design & drawings already reviewed and approved by the Employer's Representative. |
| 161 | Planning, designing of all Mechanical works |
| 162 | Planning, designing of all Electrical works |
| 163 | Planning, designing of Instrumentation works and SCADA, Telecommunication and Surveillance system. |
| 164 | Clear water transmission main |
| 165 | Topographical and Contour / level survey work using total station or any other instrument along the alignment of raw water transmission main complete as per technical requirements and specification all complete as per scope of work. |
| 166 | Geotechnical exploration by boring at required location for identification of strata, collection of samples for detailed investigation in laboratory and submission of the exploration report,including recommendation for type of structure and bearing capacity at various depths as per technical requirements and specification all complete as per scope of work including Soil resistivity test. |
| 167 | Planning, designing, preparation of site layout plan, construction drawings/ other drawings/including submission of all supporting design calculations of work inclusive of all design and drawings and other allied works. and cost of any software that might be required to carry out the design including but not limited to the following: (a) Design basis report, (b) Finalization of route of pipeline, (c) Detailed design of the transmission main including surge analysis, (d) Layout plan and longitudinal section of the pipeline showing location of valves pipeline appurtenances and (e) Design of pipe bridges, including approach bridge to the Intake, thrust blocks, pipe supporting structures any other pipe appurtenant structures as might be required including preparation of detailed working drawings all complete. The scope shall also include validation of the design & drawings already reviewed and approved by the Employer's Representative. |
| 168 | Detail Design, Drawing for laying of Pipe by trenchless methods including preparation of drawings as maybe required as per technical requirements and specification all complete as per scope of work. |
| 169 | Intermediate Ground Level Storage Reservoir |
| 170 | Topographical survey work with total station of total area of the proposed Intermediate GLSR and its surroundings including spot levels of the area by formation of 5m grid. |
| 171 | Geotechnical exploration by boring at required location for identification of strata, collection of samples for detailed investigation in laboratory and submission of the exploration report,including recommendation for type of structure and bearing capacity at various depths as per technical requirements and specification all complete as per scope of work. |
| 172 | Planning, designing, preparation of site layout plan, construction/ other drawings/including submission of all supporting design calculations of work and approval by the Employer's Representative. The rate should be inclusive of all design and other allied works. and cost of any software that might be required to carry out the design including but not limited to the following: (a) Design basis report, (b) General Layout drawing as per technical requirements and specification all complete as per scope of work., (c) Make, design parameter, drawings and specifications of equipment for supply items, (d) General layout / General arrangment drawings, (e) Preparation of architectural and MEP drawings (if required), (f) Detailed Structural designs and drawings for all associated Civil Works. The scope shall also include validation of the design & drawings already reviewed and approved by the Employer's Representative. |
| 173 | Preparation of the following item for each of the components (from 1 to 5) as listed above |
| 174 | As - Built Drawings |
| 175 | Installation, Operation and Maintenance Manual(s) |
| 176 | Any other items related to Survey, Investigation and Design which are necessary for completion of the Works. |
| 177 | Raw water Intake arrangement cum pump house including approach bridge.Civil Works - |
| 178 | Construction of Raw water Intake arrangement as per technical specification and requirments all complete as per scope of work. |
| 179 | Construction of pumphouse including all enabling Civil works as per tender specification and requirements all complete as per scope of work including Sanitary and Plumbing works. |
| 180 | Construction of approach bridge as per technical specification and requirments all complete as per scope of work. |
| 181 | Construction of cable tranch from bridge to substation as per technical specification and requirments. |
| 182 | Any other item and sub items not specified in the above but required to complete the works. |
| 183 | Mechanical work (Installation of equipment including, but not limited to secure storage, protection, erection, installation and initial testing. Items not listed and required for completing the job shall be supplied by contractor as a part of the installation without any additional payment). |
| 184 | Vertical turbine pumps, column pipe assembly and all accessories and drive motors of duty points / rating based on the minimum requirements as described in the technical specifications and requirements all complete |
| 185 | Pipes, fittings and specials, valves on pump discharge pipe including swing check valves, butterfly valves, sluice valves, air release valve and other apputenances with necessary provision for auto / manual control and operation as described in the technical specifications and requirements or as required all complete as per scope of works. |
| 186 | EOT Cranes with accessories as described in the technical specifications and requirements or as required all complete as per scope of works. |
| 187 | Miscellaneous equipment including ventilation system, fire extinguishers etc. |
| 188 | Any other item and sub items not specified in the above but required to complete the work. |
| 189 | Electrical Work (Installation of equipment including, but not limited to secure storage, protection, erection, installation and initial testing. Items not listed and required for completing the job shall be supplied by contractor as a part of the installation without any additional payment) |
| 190 | LT MCC Switchgear for VT Pump-motor, Soft starters , LPBS, Miscellaneous panels including lighting panels, Aux. as described in the technical specifications and revised requirements for Intake Pump House as required all complete as per scope of works. |
| 191 | Complete lighting system in all the civil structures and buildings (including approach bridge) including fixtures, poles, wires, conduits, cables, wiring and necessary accessories including Emergency lighting systems with lighting fixtures and cables as described in the technical specifications and requirements or as required all complete as per scope of works. (excluding Onshore Tranformer and DG Yard/Substation building) |
| 192 | Installation of Complete cabling system with LT, instrumentation and control cables, cable trays (Including Cable Laying on approach bridge) and accessoriesas described in the technical specifications and requirements or as required all complete as per scope of works. |
| 193 | Earthing for all equipments including earthing pits as necessary, including Lightning protection system for all civil structures and buildings as described in the technical specifications and requirements or as required all complete as per scope of works.(excluding Onshore Tranformer and DG Yard/Substation building) |
| 194 | Any other item and sub items not specified in the above but required to complete the works as described in the technical specifications and requirements or as required all complete as per scope of works. |
| 195 | Instrumentation and SCADA Control Equipment (Installation of equipment including, but not limited to secure storage, protection, erection, installation and initial testing. Items not listed and required for completing the job shall be supplied by contractor as a part of the installation without any additional payment) as described in the technical specifications and requirements or as required all complete as per scope of works. |
| 196 | Installation, Testing and commissioning of Redundant SCADA control system for remote monitoring and control in the central SCADA room including work station for SCADA server, data server, web server complete with server rack panel, PC with monitor for operator stations, laptop, LED display, , printer, necessary software and hardware, internet leased line for for SCADA webcast as described in the technical specifications and requirements or as required all complete as per scope of works. |
| 197 | Installation of Field Instrument & Cabling System for Raw Water Intake PS as per technical specifications and requirements all complete as per scope of works. |
| 198 | Installation, Testing and commissioning of Pressure Transmitter (Smart Electronic 2-Wire type 4-20 mA DC Output load with local LCD Display and HART Supported, Accuracy +1% of span or better reaptibilty of ±1% of span. |
| 199 | Installation, Testing and commissioning of Radder Level Tranmitter (Range 20m) |
| 200 | Installation, Testing and commissioning of Pressure gauge ( Bourdon/Bellow/Diaphram Operation, minimum 150 mm dial size, MOC- AISI 360SS, Movement AISI 316SS, Case material SS 314,IP -65, accuracy ±1%, 0-16 Kg/cm²) |
| 201 | Installation, Testing and commissioning of Instrumentation Cabling system including all GI perforated cable trays, prefabricated GI bends and Tees for cable trays with all nut and bolts, etc. as per employers requirements. |
| 202 | Raw water Transmission Main - |
| 203 | Surface dressing, Jungle clearance, dismantling of existing structures, road cutting along the alignment of the proposed raw water main, Lowering, Laying and Jointing of DI/MS Pipes, pipe specials including pipeline appurtenances (Sluice Valves, Butterfly Valve, Air valve, Dismantling Joints etc) of required classes etc by open cut method (Including carriage from Stack Yard, cutting trenches, lowering, aligning in the excavated trenches including leveling, dressing and ramming the bottom, preparation of pipe bedding, bailing or pumping out water) and laying, jointing over ground with necessary pipe supporting structures, thrust blocks, holding down blocks, valve chamber etc. as required complete, including earthwork, backfilling, disposal, road restoration (as appliacble) with due consolidation to its original level and removal of spoils, complete as per scope. |
| 204 | Construction of Pipe supporting structures along the alignment of the pipe main including erection and hoisting and laying of pipes and specials as per technical specification and requirements and specifications, complete as per scope. |
| 205 | Restoration of road /pathways along the alignment of the raw water main to its original condition inclusive of supplying, laying and finishing with all materials, equipment & labour all complete as per scope. |
| 206 | Washing, Cleaning and disinfecting and Hydraulic testing of all pipes and specials laid and jointed in site in section by filling water including supplying, installing & fixing all equipments (Rate including supply of water) as per tender requirements and specification as per scope of work all complete. |
| 207 | Any other item and sub items not specified in the above but required to complete the works. |
| 208 | Water Treatment Plant Civil Work - |
| 209 | Construction of Stilling Chamber (s), Inlet Channel and Parshall Flume(s) |
| 210 | Construction of Flash Mixer (s) and Distribution Chamber (s) |
| 211 | Construction of Clariflocculator(s) |
| 212 | Construction of Rapid Gravity Filter beds |
| 213 | Construction of Elevated Service cum Backwash reservoir for backwashing of Filter and other utilities. |
| 214 | Construction of Clear Water Reservoir cum Pump house. |
| 215 | Construction of Sludge / backwash waste-water collection sump cum pump house. |
| 216 | Construction of Sludge Lagoon(s) |
| 217 | Construction of Chemical House |
| 218 | Construction of Chlorination Building |
| 219 | Construction of Administrative Building including Plumbing and Sanitation arrangement all complete. |
| 220 | Construction of Filter Annex Building including Plumbing and Sanitation arrangement all complete. |
| 221 | Construction of Staff Quarters. |
| 222 | Land development and landscaping of WTP site, Boundary Wall, Gate, Guard Room, drainage and access road, internal pathways etc all complete including Final Clean-up of all premises of the WTP area. |
| 223 | Construction of substation building as per technical specification and requirments. |
| 224 | Any other item and sub items not specified in the above but required to complete the works. |
| 225 | Mechanical work (Installation of equipment including, but not limited to secure storage, protection, erection, installation and initial testing. Items not listed and required for completing the job shall be supplied by contractor as a part of the installation without any additional payment.) |
| 226 | Stilling Chamber and Parshall Flume: Motorised inlet and outlet valves with provision for auto/manual operation (with valve operating platform) and dismantling joints and piping, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders, valve operating platforms etc, Bypass pipe with valves, fittings and specials, Motorised drop gate/sluice gates, with provision for auto/manual operation, at the exit of Parshall flume. |
| 227 | Flash Mixer: Agitator/Flash Mixers complete with motor assembly, reduction gear, base frame etc, Motorised inlet and outlet valves with provision for auto/manual operation (with valve operating platform) and dismantling joints and piping, Draining pipe with motorised valves with provision for auto/manual control, connecting pipes, specials, fittings for draining to sludge collection sump, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders, operating platforms etc. |
| 228 | Clariflocculator |
| 229 | Clarifier Bridge Assembly alongwith flocculators including support, clips, etc, Metal works including handrails, step irons, steel ladders, operating platforms etc.. |
| 230 | Telescopic sludge bleeding arrangement, Bottom Sludge scraping arrangement complete with motor assembly, reduction gear, scraper blades etc, Sludge extraction piping with motorised isolation valves, fittings and specials, dismantling joints, including extraction header pipes. |
| 231 | Clarified Water collector arrangement including weir plates. |
| 232 | Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks. |
| 233 | Rapid Sand Filters, Pipe gallery and Filter Annex Building. |
| 234 | Filter Sand and Supporting gravel pack, Under drain systems with filter nozzles, Wash water drain troughs, Motoried inlet gates or valves with provision for auto/manual control, Motorised Filtered water outlet valves with provision for auto/manual control, Motorised wash water drain gates or valves with provision for auto/manual control, Motorised Air Scour valves with provision for auto/manual control, Filtered water Flow meters (ROF and LOF) with provision for relay of the data, All necessary valves for filter drain and Air release with motorised control and provision for auto/manual control, Piping including fittings, dismantling joints and specials, Backwash water flow measuring and control system including flow control valve and associate piping, Sump drain pumps with piping, Utility water pipes, valves, hose valves with rubber hose for wash down and cleaning of tanks, Metal works including handrails, step irons, steel ladders etc. |
| 235 | Air Blower of required capacity along with silencer, motor, suction filter, NRV, discharge isolation valve, V-belt and pulley, acoustic hood, pressure gauge, pressure switch and common base frame etc. |
| 236 | Miscellaneous equipment including ventilation system, fire extinguishers etc. |
| 237 | EOT monorail hoist with accessories for handling of blower system. |
| 238 | Chemical House: Mixer of Alum mixing/storage tank with Alum dilution trays, Chemical transfer/dosing pumps for Alum solution with suction/delivery pipes, valve,fittings and specials , Alum dosage chambers with pipes, motorised valves, fittings and specials, Alum dosage pipes, motorised valves, fittings and specials from the chemical house to dosage point with a difiuser, Polymer solution preparation and dosage pump with suction and delivery pipes, motorised valves, fittings and specials, Polymer dosage pipes, motorised valves, fittings and specials from the chemical house to dosage points with diffusers, All other pipes, motorised valves, fittings and specials for utility water supply, overflow and drain in the chemical house, Sump drain pumps with piping, Metal works including handrails, step irons, steel ladders, hatches, Ventilation, fire extinguishers, dust collectors, exhaust fans of lime powder feeding, Weighing Machine of 1000 kg capacity etc. as per technical specification and requirements all complete. |
| 239 | Chlorine Building - |
| 240 | Weigh-scale suitable for chlorine cylinders, Vacuum type Chlorinator for pre-chlorination, Vacuum type chlorinator for post-Chlorination, Chlorine ejector for pre and post chlorination, Utility water boosting pumps and motors with pipes, valves, fittings and specials, Chlorine gas and solution pipes, valves, fittings and specials from the chlorine building upto dosage points (pre and post chlorination), Safety Equipment as per technical specification and requirements all complete. |
| 241 | Chlorine cylinders / tonners as required as per technical specification and requirements all complete. |
| 242 | Filter Backwash arrangement: Horizontal Centrifugal pumps including motors and piping for pumping to Overhead reservoir, Horizontal pumps including motors and piping for surface wash of filter beds and clariflocculator and motorized inlet gate or valve with provision of auto/manual handling, dismantling joints, specials and piping, Metal works including handrails, step irons, steel ladders etc. as per technical specification and requirements all complete. |
| 243 | Sludge sump cum Pump House: Motorised inlet gate or valve with provision of auto/manual handling, dismantling joints, specials and piping, Metal works including handrails, step irons, steel ladders etc. , Horizontal centrifugal pump and motor with motorised valves, dismantling joints, pipings,fittings etc for conveyance of sludge to Sludge Lagoon, as per technical specification and requirements all complete. |
| 244 | Plant piping: Interconnection pipe between inlet chamber, flash mixing tanks including pipes, fittings, dismantling joints, and specials, Interconnection between flash mixing tanks and Clariflocculator including pipes, fittings, dismantling joints and specials, Interconnection between Clariflocculator and clear water reservoir including pipes, fittings, dismantling joints and specials, Interconnection between rapid sand filters and clear water reservoir including pipes, fittings, dismantling joints and specials, Sludge drain pipe between the treatment units upto Sludge holding tanks including pipes, specials, dismantling joints, Interconnecting pipes between Sludge Sump, sludge Lagoon as per technical specification and requirments all complete. |
| 245 | Clear Water Reservoir cum Pumping Station - |
| 246 | Horizontal Centrifugal pumps including motors as specified in the technical specification all complete. |
| 247 | Pipes, fittings and specials, Valves on pump discharge pipe including check valves, butterfly valves, sluice valves, air release valve and other ancillary valves with necessary provision for auto/manual control of with necessary protection against thrust force, Motorised Sluice gates with provision for auto/manual operation, Inlet and outlet gates/valves of reservoirs, Sump drain pumps with piping, Inlet pipes, drain pipes, overflow pipes of reservoir with fittings and special upto outer wall of reservoirs/ valve chambers, Dewatering pump with piping, Surge Protection System including ventilation arrangement, etc. |
| 248 | EOT Crane with accessories. |
| 249 | Miscellaneous equipment including ventilation system, fire extinguishers etc. |
| 250 | Miscellanous Equipments and Furniture. |
| 251 | Water quality analyzer rack, Laboratory equipment /apparatus including Laboratory reagent, Laboratory glassware's and reagents. |
| 252 | Sampling table complete with pumps, pipelines, valves etc, Sampling pumps with piping from sampling points to laboratory. |
| 253 | Air conditioning, ventilation system along with rain protection cowl and bird screen, fire extinguishers etc. |
| 254 | Furniture for Administrative Building, Chemical House (Laboratory furniture), Chlorination Building, Filter Annex Building, Staff Quarter, Guard Room. |
| 255 | Any other item and sub items not specified in the above but required to complete the works |
| 256 | Electrical work. - |
| 257 | Power substation- 33KV Indoor switchboard. |
| 258 | 33KV/0.433 KV transformers with OLTC and Automatic Voltage Regulator. |
| 259 | 415V indoor switch board/MCC/PDB, Soft starters, Capacitors, LPBS, bus-duct, Electrical control panel set for filter bed system, Electrical control panel set for filter bed system, 110 V Ni-Cd batteries including battery chargers and Distribution panels. |
| 260 | Complete lighting system in all the civil structures and buildings (including street poles on approach road, interplant roads and pathways and adequate number of high mast lighting arrangement with lightning arrestors) including fixtures, poles, wires, conduits, cables, wiring and necessary accessories including Emergency lighting systems with lighting fixtures and cables, Miscellaneous panels including lighting panels. |
| 261 | Complete cabling system with HT, LT, instrumentation and control cables, cable trays and accessories. |
| 262 | Earthing for all equipments including earthing pits as necessary, including Lightning protection system for all civil structures and buildings. |
| 263 | 415V 200KVA DG set with AMF panel & accessories |
| 264 | Any other item and sub items not specified in the above but required to complete the works. |
| 265 | Instrumentation and Automation Work - |
| 266 | SCADA control system for remote monitoring and control in the central SCADA room including work station for SCADA server, data server, web server complete with server rack panel, PC with monitor for operator stations, laptop, LED display, , printer, necessary software and hardware, internet leased line for for SCADA webcast. |
| 267 | UPS for SCADA and monitring, Surveillance and Telephone system etc with UPS panel. |
| 268 | Main CPU Controller Panel with Remote I/O PLC panel, RTU for RWPS, CWPS, substation, different WTP units, desktop PC for local HMI, at specified locations including PLC/ICP with software and hardware with complete ancillary equipment. |
| 269 | Instruments like flow meter with transmitter and smart remote display,level sensor with local display and trasmitter, Water quality measurement equipment including analyzer, sensor, local display, necessary weather protection enclosure, transmitter complete with all cables and accessories, Pressure transmitter, Instrumentation and control cables including cable trays, racks, ducts, OFC, LAN cable, conduit cable laying pipe, multiport switch, etc. |
| 270 | IP EPABX Telephone system, IP PA Emergency Announcement system, CCTV monitoring system for WTP and all other remote areas. |
| 271 | Fiber Optic L2 Switch communication system betweenremote locations and WTP through Armoured Single Mode OFC with HDPE pipe conduit complete with enclosure, and all accessories. |
| 272 | Any other item and sub items not specified in the above but required to complete the works. |
| 273 | Clear water transmission main - |
| 274 | Surface dressing, Jungle clearance, dismantling of existing structures, road cutting along the alignment of the proposed clear water main, Lowering, Laying and Jointing of DI/MS Pipes, pipe specials including pipeline appurtenances (Sluice Valves, Butterfly Valve, Air valve, Dismantling Joints etc) of required classes etc by open cut method (Including carriage from Stack Yard, cutting trenches, lowering, aligning in the excavated trenches including leveling, dressing and ramming the bottom, preparation of pipe bedding, bailing or pumping out water) and laying, jointing over ground with necessary pipe supporting structures, thrust blocks, holding down blocks, valve chamber etc. as required complete, including earthwork, backfilling, disposal, road restoration (as appliacble) with due consolidation to its original level and removal of spoils, complete as per scope. |
| 275 | Construction of Pipe supporting structures along the alignment of the pipe main including erection and hoisting and laying of pipes and specials as per technical specification and requirements and specifications, complete as per scope. |
| 276 | Pipe laying by adopting trenchless technologies (below drainage canal, State Highway or any other important road of heavy vehicular traffic), including the cost of casing pipe of required size, taking of entry and exit pits, all related civil works like excavation, shoring/strutting, etc and ground penetrating radar survey to protect existing utilities at the pipe installtion location and restoration of site after completion, inclusive of construction of driving/ receiving pits, labours, material, tools and tackles, hire charges for driving machineries, clearing of sites etc. complete in all respect inclusive of any cost to be incurred in seeking permission from the concerned department as per tender requirements and specification and scope of work all complete. |
| 277 | Restoration of road /pathways along the alignment of the clear water main to its original condition inclusive of supplying, laying and finishing with all materials, equipment & labour all complete as per scope. |
| 278 | Washing, Cleaning and disinfecting and Hydraulic testing of all pipes and specials laid and jointed in site in section by filling water including supplying, installing & fixing all equipments (Rate including supply of water) as per tender requirements and specification as per scope of work all complete. |
| 279 | Any other item and sub items not specified in the above but required to complete the works. |
| 280 | Intermediate Ground Level Storage Reservoir - |
| 281 | Construction of reservoir with chlorine contact tank and sump with proper foundation, excavation, backfilling,disposal of spoils as per technical requirements and speciifcation as per scope of work all complete including Provision of Electromagnetic flow-meter and residual chlorine measurement at the Inlet pipe and level sensor in the reservoir including data transmission to remote location. |
| 282 | Construction of boundary wall, gate and access road as per technical speciifcation and requirements all complete as per scope of work. |
| 283 | Any other item and sub items not specified in the above but required to complete the works. |
| 284 | All piping and appurtenances,Motorised Sluice gates with provision for auto/manual operation, Inlet and outlet gates/valves of reservoirs, Sump drain pumps with piping, Inlet pipes, drain pipes, overflow pipes of reservoir with fittings and special upto outer wall of reservoirs/ valve chambers including ventilation arrangement all complete as required as per technical specificaiton and requirments. |
| 285 | Provisional Sum (For Health, safety, Environment and social requirement, Electricity connection (Service charges and Security Charges), STI, STD and HIV / AIDS alleviation program , Tree cutting, shifting and / or repairing of utilities and supporting utilities, dismantling and restoration of entry, engagement of traffic volunteers, payment of fees of various statutory authorities, transplantation of trees or planting new saplings with guard and other miscellaneous works, CTE, CTO, development of green belt across WTP etc) as outlined in the bid document including Employers share of the Dispute Adjudication Boarda. |
| 286 | 5.1 - Fixed Fee in Local Currency INR (contractor' annual Fixed Fee) |
| 287 | 5.2 - Annual production at WTP (contractor's veriable fee ) |
| 288 | 5.3 - Contractors Guranteed electricity Consumption |
| 289 | Note : The amount under 5.3 shall be used for evaluation purpose only and as per applicability of Clause 14 & 15 of Preamble to BOQ - |
| 290 | Other services during opeartion service period |
| 291 | Provisional Sum for Operation & Maintenance |
| 292 | Gross Total Amount(Summary of Price Schedule 1 to 6) Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
| 8 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail