| 1 | Maintenance and upkeeping HT/LT/Distributin Sub -Station Works for various Schemes in the Jurisdiction of ED Shopian FOR THE F.Y. 2026-27 as Per Sheet 1 of this BOQ |
| 2 | Supply, installation, Testing and Commissioning, including loading, Unloading and carriage etc charges at Site of 25 kVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate |
| 3 | Supply, installation, Testing and Commissioning, including loading,Unloading and carriage etc charges at Site of 63 kVA ,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate |
| 4 | Supply, installation, Testing and Commissioning, including loading,Unloading and carriage etc charges at Site of 100 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate |
| 5 | Supply, installation, Testing and Commissioning, including loading,Unloading and carriage etc charges at Site of 200 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate |
| 6 | Installation, Loading, Unloading and Commissioning of 25 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 7 | Installation, Loading, Unloading and Commissioning of 63 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 8 | Installation, Loading, Unloadingand Commissioning of 100 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 9 | Installation, Loading, Unloading and Commissioning of of 200 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 10 | Dismantling / De mounting, Loading, Unloading charges of 25 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 11 | Dismantling / De-Mounting,Loading, Unloading Charges of 63 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 12 | Dismantling / De Mounting, Loading, Unloading Charges of 100 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 13 | Dismantling / De Mounting, Loading, Unloading Chargesof of 200 kVA,11/0.433kV, 3-phase Distribution Transformer |
| 14 | Supply,Erection, testing, commissioning, insurance, loading, carriage and delievery etc charges at site of 8 Mtr. Long Pole (ST-410 SP15) with base plate and cap as per REC Standard |
| 15 | Supply,Erection, testing, commissioning, insurance, loading, carriage and delievery etc charges at site of 9 Mtr. Long Pole ( ST-410 SP33) with base plate and cap as per REC Standard for Sub Station |
| 16 | Supply,Erection, testing, commissioning, insurance, loading, carriage and delievery etc charges at site of 9 Mtr. Long Pole ( ST-410 SP33) with base plate and cap as per REC Standard for HT Line |
| 17 | Supply,Erection, testing, commissioning, insurance, loading, carriage and delievery etc charges at site of 11 Mtr. Long Pole(ST-410 SP56) with base plate and cap as per REC Standard |
| 18 | Supply,Erection, testing, commissioning, insurance, loading, carriage and delievery etc charges at site of 13 Mtr. Long Pole(ST-410 SP69) with base plate and cap as per REC Standard |
| 19 | Supply,Erection, testing, commissioning, insurance, loading, carriage and delievery etc charges at site of 16 Mtr. Long Pole (ST-410 SP80) with base plate and cap as per REC Standard |
| 20 | Erection, Loading, Unloading and commissioning of 8 Mtr. Long Pole (ST-410 SP15) with base plate and caps |
| 21 | Erection, Loading, Unloading and commissioning of 9 Mtr. Long Pole ( ST-410 SP33) with base plate and caps |
| 22 | Erection, Loading, Unloading and commissioning of 11 Mtr. Long Pole(ST-410 SP56) with base plate and caps |
| 23 | Erection, Loading, Unloading and commissioning of 13 Mtr. Long Pole(ST-410 SP69) with base plate and caps |
| 24 | Erection, Loading, Unloading and commissioning of 16 Mtr. Long Pole (ST-410 SP80) with base plate and caps |
| 25 | Dismantling, Loading and Unloading of spared 8 Mtr Long (ST-410 SP15) |
| 26 | Dismantling , Loading and Unloading of spared 9 Mtr. Long Pole ( ST-410 SP33) |
| 27 | Dismantling, Loading and Unloading of spared 11 Mtr. Long Pole(ST-410 SP56) |
| 28 | Dismantling , Loading and Unloading of spared 13 Mtr. Long Pole(ST-410 SP69) |
| 29 | Dismantling, Loading and Unloading of spared 16 Mtr. Long Pole (ST-410 SP80) |
| 30 | supply and laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum / pole , muffing 20 cm above ground level ,including plaster and curing of concrete for ( 8 Mtr ST Pole) |
| 31 | supply and laying of Cement bottoming 1:2:4 mix as per Standards 0.48 cum /pole muffing 20 cm above ground level ,including plaster and curing of concrete for ( 9 Mtr ST Pole ) |
| 32 | supply and laying of Cement bottoming 1:2:4 mix as per Standards 0.66 cum/pole muffing 20 cm above ground level ,including plaster and curing of concrete for ( 11 MtrST Pole ) |
| 33 | supply and laying of Cement bottoming 1:2:4 mix as per Standards 0.78 cum/pole muffing 20 cm above ground level ,including plaster and curing of concrete for ( 13 Mtr ST Pole) |
| 34 | supply and laying of Cement bottoming 1:2:4 mix as per Standards 0.88 cum/pole muffing 20 cm above ground level ,including plaster and curing of concrete for ( 16 Mtr ST Pole) |
| 35 | Supply, Transportation, Laying, stringing and binding of conductor including joints with PG clamps of required size 30 mm² ACSR Conductor (Weasel) along with fitting complete |
| 36 | Providing and Fixing of Ch.Iron 100x50x6mm 9 Ft long, & Ch.Iron 75*40*x6mm 9 Ft long along with Back Clamps / V-cross as required for Complete Sub-Station / Site as per Rec. Standard |
| 37 | Supply, Transportation, Laying, stringing and binding of conductor including joints with PG clamps of required size 50 mm² ACSR Conductor (Rabbit) along with fitting complete |
| 38 | Supply, Transportation, Laying, stringing and binding of conductor including joints with PG clamps of required size 100 mm² ACSR Conductor (Dog) along with fitting complete |
| 39 | Laying, stringing and binding of conductor including joints with PG clamps of required size 30 mm² ACSR Conductor (Weasel) along with fitting complete |
| 40 | Laying, stringing and binding of conductor including joints with PG clamps of required size 50 mm² ACSR Conductor (Rabbit) along with fitting complete |
| 41 | Laying, stringing and binding of conductor including joints with PG clamps of required size 100 mm² ACSR Conductor (Dog) along with fitting complete |
| 42 | Supply, installation, Testing and Commissioning of 35 mm² AB (HT) Cable (3x35+1x70 insulated) mm² XLPE (11 kV, 3C + Earth) as per Rec. standard |
| 43 | Supply, installation, Testing and Commissioning of 50 mm² AB (HT) Cable (3x50 + 1x70 insulated )mm² XLPE (11 kV, 3C + Earth) as per Rec. standard |
| 44 | Supply, installation, Testing and Commissioning of 70 mm² AB (HT) Cable (3 x 70 + 1x95 insulated )mm² XLPE (11 kV, 3C + Earth) as per Rec. standard |
| 45 | Supply, installation, Testing and Commissioning of 120 mm² AB (HT) Cable (3x120 + 1x95 insulated)mm² XLPE (11 kV, 3C + Earth) as per Rec. standard |
| 46 | Supply, installation, Testing and Commissioning of 35 mm² AB (LT) Cable ( 3 x 35 + 1 x 16 + 1 x 25 insulated) mm² XLPE (1.1kV, 3+1 C, Al) as per Rec. standard |
| 47 | Supply, installation, Testing and Commissioning of 50 mm² AB (LT) Cable ( 3 x 50 + 1 x 16 + 1 x 35 insulated)mm² XLPE (1.1kV, 3+1 C, Al) as per Rec. standard |
| 48 | Supply, installation, Testing and Commissioning of 70 mm² AB (LT) Cable ( 3 x 70 + 1 x 16 + 1 x 50 insulated) mm² XLPE (1.1kV, 3+1 C, Al) as per Rec. standard |
| 49 | Supply, installation, Testing and Commissioning of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al) as per Rec. standard |
| 50 | Supply, installation, Testing and Commissioning of 70 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type as per REC. Standard |
| 51 | Supply, installation, Testing and Commissioning of 185 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type as per REC. Standard |
| 52 | Supply, installation, Testing and Commissioning of 240 mm² Single-Core Cable,1.1k V Grade, XLPE un armoured FRLS type as per REC. Standard |
| 53 | Providing and Fixing of 11 KV pin insulator Complete (Polymer/Porcelain) 5 KN With Pins |
| 54 | Providing and Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm |
| 55 | Supply,Installation testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type as per REC Standard |
| 56 | Supply, installation, Testing and Commissioning of LT Fuse of suitable capacity (Please refer Tender Drawing of Fuse set) as per REC Standard |
| 57 | Supply, installation, Testing and Commissioning of 11KV 3 Phase Horn Gap Fuse Set as per REC Standard |
| 58 | Supply, installation, Testing and Commissioning of 11 KV LA SET 9 KVA ,10 KA,LA WITH Polymer ,Porcelain Housing Station Type as per REC Standard |
| 59 | Supply, installation, Testing and Commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6) mm, nut-bolts, 2 Nos turn buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete as per REC Standard |
| 60 | Supply, installation, Testing and Commissioning Heat Shrinkable Outdoor Cable Termination Kit as per the REC. Standard |
| 61 | Supply,Installation testing & commissioning of LT Distribution Box for 25 kVA DTR with 40 Amp MCCB 3P 16 kA for incomer & 25 Amp MCCB 3P 16 kA/10 kA 1 No. each (=2No.) for Outgoing Circuits |
| 62 | Supply,Installation testing & commissioning of LT Distribution Box for 63 kVA DTR with 100 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 1 No. and 63 Amp MCCB 3P 16 kA 1 No.s for Outgoing Circuits |
| 63 | Supply,Installation testing & commissioning of LT Distribution Box for 100 kVA DTR with 160 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits |
| 64 | Supply,Installation testing & commissioning of LT Distribution Box for 200 kVA DTR with 315 Amp MCCB 3P 25 kA for incomer & 160 Amp MCCB 3P 16 kA 3 No.s for Outgoing Circuits |
| 65 | Providing and Fixing of Galvanized Nuts and Bolts |
| 66 | Supply and erection of Danger Plate with clamps (writing in English and Regional Language ) |
| 67 | Supply and fixing of anti-climbing Device with Clamps |
| 68 | Providing and Fixing of LT Shackle with Muki Clamps (50*6mm) completeas per REC Standard and approved drawings |
| 69 | Painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) |
| 70 | Supply,Fixing of Spike Earthing Rod 20mm 2,5 Mtr long with GI strip (25x3)mm |
| 71 | Providing and Fixing of Suspension/Tension Clamp with eye hook as per REC. Standard |
| 72 | Supply, installation, Testing and Commissioning of Prodigy Meter as per the REC. Standard |
| 73 | Supply, installation, Testing and Commissioning of 11 kV Isolator, Double Break,3-pole, 630Amp, Horizontal Mounting Type with Earth Switch as per the REC. Standard |
| 74 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover ) |
| 75 | Providing and Fixing of Wedge Connectors / PG Clamps |
| 76 | Supply,Installation testing & commissioning of Mid Span Straight Through Jointing Kit as per Rec. standard |
| 77 | Polypropylene weather proof outdoor type Meter Box for Single Phase Meter along with Zinc plated clamps |
| 78 | Polypropylene weather proof outdoor type Meter Box for Three Phase Meter along with Zinc plated clamps |
| 79 | Providing and Fixing of ACSR to Cable Connector / Piericing connector |
| 80 | Providing and Fixing of Alumunium Thimbles of sizes |
| 81 | Sign Board Mentioning Name of Village ,Name of Work/scheme, Year of Implementing ,Implementing Agency PDD KPDCL Div Shopian & Name of Contractor |
| 82 | Geo Tagged Photographs of high resolution (Pre and Post Photographs) Both hard and soft copy (for e-compendium) Photographs Per site Technical Officer Please Enable Macros to View BoQ information |