| 1 | Execution of topographical and cadastral survey works involving demarcation of pond boundary using total station/GPS, and detailed contouring of the pond area before and after excavation. The scope includes preparation and submission of accurate level sheets indicating contour intervals and demarcation details, ensuring horizontal and vertical control in accordance with standard surveying practices, and as per the instructions of the Assistant Engineer. The work shall be completed in all respects, including field data collection, plotting, and documentation. |
| 2 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] |
| 3 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 4 | [20.62.6]Providing, lowering, laying, cutting (cut surface to be uniformly finished), jointing with rubber rings marked with IS : 5382 and testing of SPIGOT AND SOCKETTED RCC, NP2 MARKED WITH IS : 458-1988 and specials into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete is all respects to the satisfaction to the Engineer - in -charge. 6. 450 mm i/d [Through Rate] |
| 5 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] |
| 6 | [26.4.3]SITE CLEARANCE 3. clearing jungle manually including uprooting rank vegetation , grass, woody vegetation up to 30cm girth measured at height 1 m above ground level and removal of rubbish up to a distance of 50 m out side the periphery of the area cleared [Through Rate] |
| 7 | [3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [5km] |
| 8 | [34.29.2]GI barbed wire fencing 2. G.I Barbed Wire Fencing 1.8 Metre High Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres centre to centre founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 [Through Rate] |
| 9 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] |
| 10 | [4.16.1.3]Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.3. All kind of soil Pipes, cables etc, exceeding 300 mm dia but not exceeding 600 mm dia. [Through Rate] |
| 11 | [4.31.1]Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1. All kinds of soil [Through Rate] |
| 12 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 13 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] |
| 14 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] |
| 15 | [7.70]Extra for bailing / pumping out standing water of pond caused by springs, sub soil water, canal or river seepage and broken water mains or drains except rain water collected in the trenches or foundations before laying brick work. [Through Rate] Please Enable Macros to View BoQ information |