| 1 | Loading, Carriage and unloading of PCC poles from store to work site or vice-versa. |
| 2 | Loading, Carriage, unloading and taking out cable from cable drum of HT 11 KV cable from store to work site or vice-versa. |
| 3 | Loading, Carriage and unloading of MS Item from store to work site or vice-versa. |
| 4 | Loading, Carriage and unloading of ACSR Dog/ Panther Conductor from store to work site or vice-versa. |
| 5 | Erection of single PCC Pole as per standard specifications including fitting of all material. |
| 6 | Erection of Double pole structure of PCC Pole as per standard specifications including fitting of all material. |
| 7 | Grouting of pole with cement brick ballast and coarse sand as per standard specification including cost of all material. |
| 8 | Making of pole plinth of 400 mm dia, 400 mm height with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 9 | Fixing of stay Set complete |
| 10 | Supply & fixing STONE PAD for PCC Pole as per site requirement as per standard specification |
| 11 | Supply and Fixing of danger board with help of clamp and nut bolts on erected poles |
| 12 | Supply & fixing Barbed wire of at least 10 no. turns with help of top and bottom clamps and nut bolts on ercted PCC poles as per standard specification |
| 13 | Earthing of supports by sagging of M.S. earthing rod 20mm dia and connecting with earth wire with help of al. lug and nut bolts related works as per standard specifications. |
| 14 | Fabrication/modification of MS Item as per requirement of site |
| 15 | Fixing of MS Channel (100x50x6 )mm 1/ 2.4 / 2.8/3 mtr. Long/M.S. Angle with help of MS clamp and nut bolts as per Required size |
| 16 | Digging of Trench for laying of 11KV cable in Normal soil in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 17 | Digging of Trench for laying of 11KV cable in Kharanja/interlocking Road in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 18 | Digging of Trench for laying of 11KV cable in RCC/Metallic Road in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 19 | L/c for Laying of 11 KV XLPE cables in above digged trench covering with bricks and back filling and proper ramming including cost of bricks and sand as per specifications and also upto pole |
| 20 | L/C for Laying of 11KV XLPE cables for h.d.d method |
| 21 | Laying of 11 KV Cable on single/double pole , Pole to pole in Air. |
| 22 | Laying of 11 KV Cable Through GI/MS Pipe |
| 23 | Making of PIT FOR H.D.D 2X2X1 MTR |
| 24 | Making indoor/outdoor joints of 11 KV XLPE Cable where the cable is being laid. |
| 25 | Making Straight through cable box |
| 26 | Laying of Dog Conductor |
| 27 | Laying of GI wire for gaurding of 11 KV OH line. Gaurding section should be makde on each pole. First lacing will be at 1 mtr. Distance from each pole and inter-spacing between laning should not exceed 3 mtr. |
| 28 | Connecting of 11kv Indoor cable box to 11 KV VCB Pannel / HT piller Box/ Metering Cubical after erection of work |
| 29 | Mounting and connection of all type of cable box on pole/cable post with the help of MS Clamp as well as cable laying through M.S. /G.I. Pipe the work includes proper clamping of cable box on both end of pipe. 6 inch dia ( 3 mtr. length). |
| 30 | Supply of G.I. PIPE 150 MM DIA as per site requirement & standard specification Provided by Contractor |
| 31 | Opening of H.T. Jumpers with 3 Phase 3 Wire H.T. O.H. line before erection of work. |
| 32 | Making of H.T. Jumpers with 3 Phase 3 Wire H.T. O.H. line after erection of work. |
| 33 | Mounting and fixing of 11 KV pin and Pin insulator |
| 34 | Mounting and fixing of 11 KV Disc Insulator & Fitting |
| 35 | Making of section point on 11 kv line. |
| 36 | Supply & fixing all size aluminium Lug(25 to 630 sqmm )as per site requirement as per standard specification |
| 37 | Supply & fixing P.G. CONNECTOR DOG. TO DOG.as per site requirement as per standard specification |
| 38 | Supply & fixing all size M.S. Clamp for Round Pole (2½\\" to7½\\" 50X6 M.M)..as per site requirement as per standard specification |
| 39 | Supply & fixing all size M.S. Holding Clamp/STAY Clamp forPCC/ Round Pole (2½\\" to7½\\" 50X6 M.M)..as per site requirement as per standard specification |
| 40 | Supply & fixing all size M.S. CLAMP & Bracing calm For PCC POLE..as per site requirement as per standard specification |
| 41 | Supply & fixing all size NUT BOLT WITH WASHER OFF SIZE .as per site requirement as per standard specification |
| 42 | Supply of 11 kv adapter for connecting (11 kv vcb pannel outging ,incoming or capacitor bank) by contractor |
| 43 | Loading Unloading 11 kv VCB kesco store to work site or Vice - Versa |
| 44 | Shifting of 11kv VCB & Adapter From unloading site to control room |
| 45 | Erection And grouting of 11 kv VCB &Adapter in control room |
| 46 | Earthing connection of 11 kv vcb Panels & Adapter /other structure on control room |
| 47 | Wiring,Testing and Commissioning of newly erected 11kv VCB & Adapter and all related work |
| 48 | Dismentaling of connected 11 KV cable box OLD PANEL |
| 49 | Dismetaling of existing earthing of 11 KV VCB , 33 kv CRP and Capacitor Bank OLD PANEL |
| 50 | Dismetaling of internal control wiring of 11 KV VCB , 33 kv CRP and Capacitor Bank OLD PANEL |
| 51 | Dismenlting of exiting 11 kv OLD VCB , 33 kv CRP and Capacitor Bank panel for making space for erection of new vcb panel |
| 52 | Shifting of exiting 11 kv OLD VCB , 33 kv CRP and Capacitor Bank panel erection of new vcb panel |
| 53 | Erection of exiting 11 kv OLD VCB , 33 kv CRP and Capacitor Bank panel making space for erection of new vcb panel |
| 54 | Connecting 11 kv OLD VCB , 33 kv CRP and Capacitor Bank panel of internal control wiring |
| 55 | Earthing 11 kv OLD VCB , 33 kv CRP and Capacitor Bank panel with help of ms strip by cutting shaping and welding |
| 56 | wiring & testing commission of 11 kv OLD VCB , 33 kv CRP and Capacitor Bank panel |
| 57 | L/c for Laying of CONTROL cables in control trench |
| 58 | L/c for Laying of 11 KV XLPE cables in control Room trench |
| 59 | Cutting of Tree branches |
| 60 | Testing ,commising & Energized Newely 11 kv Network |
| 61 | Carriage of all concering material Kesco Store to site or vice versa Please Enable Macros to View BoQ information |