| 1 | Part- A SupplyBOLT NUT AND WASHER ALL SIZE/ALL TYPE OF CLAMP |
| 2 | DEAD END CLAMP |
| 3 | J HOOK |
| 4 | EYE HOOK |
| 5 | SUSPENSION CLAMP |
| 6 | 3 PHASE DISTIBUTION BOX CLAMP |
| 7 | ABC PIERCING CONNECTOR |
| 8 | LT SHACKLE INSULATOR FOR NEUTRAL WIRE |
| 9 | BOLT And NUT FOR SHACKLE INSULATOR |
| 10 | T OFF CHANNEL WITH CLAMP |
| 11 | GUARDING X ARM HOLDING CLAMP |
| 12 | HENLEY TYPE TAILLESS UNIT PROTECTION CUBICAL PANEL 500A 650 V FOR 250 KVA DT |
| 13 | ALLUMINIUM LUG FOR 25/63/100/250 KVA DT TF |
| 14 | LT FUSE SET PROTECTION UNIT WITH SMC BOX FOR 25/63/100 KVA DT WITH NUT AND BOLT CLAMP |
| 15 | CROSS ARM HOLDING CLAMP |
| 16 | DANGER BOARD WITH CLAMP |
| 17 | STONE PAD |
| 18 | BARBED WIRE GI |
| 19 | PG CLAMP |
| 20 | E BRACKET WITH BOLT AND NUT |
| 21 | GUARDING ANGLE |
| 22 | GI WIRE |
| 23 | HDPE PIPE 140 SQ MM |
| 24 | RED OXIDE AND ALLUMINIUM PAINT EACH |
| 25 | F BRACKET |
| 26 | G.I PIPE |
| 27 | Z CLAMP |
| 28 | Part- B CarrigeLOADING UNLOADING AND CARRIAGE OF LINE ITEM FROM PADRAUNA STORE TO SITE 0-50 KM WITH SAFETY (i) PCC POLE 8.5 M LONG |
| 29 | PCC POLE 9 M LONG |
| 30 | PCC POLE 11 M LONG |
| 31 | LT ABC CABLE 3*50/3*95/3*120 SQMM |
| 32 | ACSR WEASEL /DOG CONDUCTOR /RABBIT |
| 33 | LT XLPE CABLE 3.5*70/3.5*240/3*400/1*400 SQMM |
| 34 | 11 KV VCB OG 200/100/5 A |
| 35 | 3*70 SQMM /3*120/3*185 SQMM 11 KV XLPE CABLE |
| 36 | Part-C WorkERECTION OF SINGLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 37 | ERECTION OF SINGLE PCC POLE 9 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 38 | ERECTION OF SINGLE PCC POLE 11 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 39 | ERECTION OF DOUBLE PCC POLE 8.5 M LONG WITH ALL FITTING INCLUDING EARTHING AND GROUTING AS PER STANDARD RESPO |
| 40 | STAY COMPLETE AS PER STANDARD RESPO |
| 41 | DISMANTLING AND SUBMIT OF OLD AND USED WEASEL CONDUCTOR TO PADRAUNA STORE |
| 42 | CONSTRUCTION OF 3PHASE 3WIRE LINE |
| 43 | ERECTION OF ABC CABLE 3*50/3*90/3*120 SQMM |
| 44 | GUARDING OF LINE (33KV/11 KV) |
| 45 | CARRIAGE OF 250 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 250 KVA DT WITH ALL FITTING INCLUDING CHEMICAL EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND TAILLESS UNIT AND THEN RETURNING BACK OLD 100 KVA DT TO PADRAUNA STORE. |
| 46 | PLINTH FOR 250 KVA DT OF SIZE 2*2*1.5 M AND ITS FENCING. |
| 47 | CARRIAGE OF 25 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 25 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 16/10 KVA DT TO PADRAUNA STORE. |
| 48 | CARRIAGE OF 63 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 63 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 25 KVA DT TO PADRAUNA STORE. |
| 49 | CARRIAGE OF 100 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 100 KVA DT WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT AND THEN RETURNING BACK OLD 63 KVA DT TO PADRAUNA STORE. |
| 50 | DISMANTLING OF OLD AND USED ABC CABLE AND RETURN BACK TO PADRAUNA SORE |
| 51 | LAYING OF CABLE 3*70/3*120/3*185 SQ MM 11 KV WITH HDD METHOD |
| 52 | CARRIAGE OF 25 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 25 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 53 | CARRIAGE OF 63 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 63 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 54 | CARRIAGE OF 100 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 100 KVA DT ON DOUBLE POLE WITH ALL FITTING INCLUDING EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT FUSE SET PROTECTION UNIT . |
| 55 | CARRIAGE OF 250 KVA NEW DT FROM PADRAUNA STORE TO SITE THEN INSTALLING THE 250 KVA DT WITH ALL FITTING INCLUDING CHEMICAL EARTHING (BODY AND NEUTRAL), 11 KV FUSE SET AND LT TAILLESS PROTECTION UNIT . |
| 56 | TREE CUTTING |
| 57 | INSTALLATION OF VCB OG 200/100/5A |
| 58 | REPLACEMENT AND INSTALLATION OF BATTERY AND BATTERY CHARGER WITH CABINET Please Enable Macros to View BoQ information |