| 1 | Safe carriage of following material from ESC Daliganj/Chinahut to JE Dump store including loading unloading and proper stacking of material |
| 2 | Line material |
| 3 | PCC Pole 8.5 Mtr |
| 4 | 11/0.4 KV 63/100 KVA T/F |
| 5 | 11/0.4 KV 250 KVA T/F |
| 6 | LT PVC Cable 1x400/3.5x 240/1x 70SQMM |
| 7 | ABC Cable 3x120/95/50/25sqmm |
| 8 | DP Box 3 Phase |
| 9 | Safe carriage of following material from JE Dump store to site including loading unloading |
| 10 | PCC Pole 8.5 Mtr |
| 11 | 11/0.4 KV 63/100 KVA T/F |
| 12 | 11/0.4 KV 250 KVA T/F |
| 13 | LT PVC Cable 1x400/3.5x 240/1x 70SQMM |
| 14 | ABC Cable 3x120/95/50/25sqmm |
| 15 | DP Box 3 Phase |
| 16 | Digging of pit erection (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department. |
| 17 | Prepare proper space for construction of Plinth |
| 18 | Construction of T/F plinth of size 2x2x1.2 Mtr with first class bricks and massonary work in the ratio 1:4cement and course sand with RCC Top 1:2:2 cement sand and course sand stone gritt with MS bar and MS channel for resting of T/F |
| 19 | Fabrication and fixing of wiremesh fencing of 11/0.4KV S/S made as per requirement 3mtr height 45x45x5 mm angle frame and 1 No horizontal runner by 40x5 mm MS flat then welding of wiremesh on it 50x25mm made of 12 SWG ,diagonal bracing of all the frame panel welded with MS flat 25x3mm support, grouting properly by cement concrete and course sand |
| 20 | Painting of wiremesh Fencing with 2 coat of red oxide and 2 coat of enamel Paint |
| 21 | Construction of missionary type DP Box with First class brick ballast ,course sand ,cement and MS Bar local sand by making 2 Nos pillar 1 Mtr long 25mm width 6 feet height above ground level ,fixing of 2 Nos MS Angle for mounting of Henlay type fuse unit plastering both side with provision of ,all material arrange by contractor |
| 22 | Fabrication and fixing of Henley type Tailless Fuse Unit 500 Amp 650 Volts |
| 23 | Fabrication and Fixing of Electrolytic Bus bar of Size 50x6x750mm |
| 24 | Proper Jumpering of 11KV Line on tapping point |
| 25 | Laying of LT Cable from T/F to DP Box and DP Box to LT Line pole |
| 26 | Hoisting of LT cable will be passed through GI pipe required size duly clamped with pole at the bottom ,middle and top of the pole only cable supplied by department |
| 27 | Proper Jumpering with existing LT Line with PVC Cable |
| 28 | Providing and fixing of 11KV DO Fuse set along with clamp and nut bolt |
| 29 | Errection and commissioning of AB Conductor of size 3x120/95/50/25sqmm |
| 30 | Ordinary Earthing by MS Earth rod2500 mm long all material provided by department. |
| 31 | Earthing of Pipe type with 60 feet deep boring and providing jindal make pipe \\"B\\" class 1\\" dia and GI strip 25x5 6mtr long attached with clamps and GI pipe . |
| 32 | Safe Installation of 63/100 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 33 | Safe Installation of 250 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 34 | Fixing of 3 phase distribution box/kiosk on the LT poles including all clamps and material required for mounting connections and sealing. |
| 35 | Providing, fabrication and fixing of 11KV TPMO Set with AB Switch along with clamps, nut & bolts on existing double pole. |
| 36 | Dismantling of 10/16/25/63 KVA T/F and its carriage back to JE Dump store |
| 37 | Dismantling of 100/250 KVA T/F and its carriage back to JE Dump store |
| 38 | Cutting and chopping of tree branches for clearance of HT/LT Line. After clearance line throughout pieces of tree branches of site. |
| 39 | Disconnection and Reconnection of Consumer Connections including Service Cable works |
| 40 | Grouting of Pole by cement couse sand and stone gritt |
| 41 | Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only Stay wire shall be supplied by the Department. |
| 42 | Supply & Fixing |
| 43 | Allu. Lug 70 sqmm |
| 44 | Allu. Lug 150 sqmm |
| 45 | Allu. Lug 240 sqmm |
| 46 | Allu. Lug 400 sqmm |
| 47 | Clamp for PCC pole for Eye hook |
| 48 | Dead End Clamp |
| 49 | Pearcing Connector |
| 50 | Suspention clamp |
| 51 | Eye Hooq |
| 52 | Nut & Bolts |
| 53 | Cooper L-Piece for 250 KVA T/F GST will be paid extra as per rule. Please Enable Macros to View BoQ information |