| 1 | Supply of Stone Pad | Stone Pad 300x300x75 mm |
| 2 | Supply of MS Top Channel | MS Top Channel 125x65x2240 mm |
| 3 | Supply of MS Dropper Channel | MS Dropper Channel 100x50x2028 mm |
| 4 | Supply of MS T off Channel | MS T off Channel 125x65x1300 mm |
| 5 | Supply of LT Clamp | LT Clamp |
| 6 | Supply of Danger Board | Danger Board with Clamp |
| 7 | Supply of PRC Connector | PRC Connector |
| 8 | Supply of I Hook | I Hook |
| 9 | Supply of Dead and Clamp | Dead and Clamp |
| 10 | Supply of Suspension Clamp | Suspension Clamp |
| 11 | Supply of MS Angle | MS Angle 75x75x6x2028 mm with Clamp |
| 12 | Supply of Barbed Wire | Barbed Wire |
| 13 | Supply of F Clamp | F Clamp for STP |
| 14 | Supply of Number Plate | Number Plate |
| 15 | Supply of Holding Clamp | Holding Clamp for Top Channel with Nut and Bolts |
| 16 | Supply of Double Pole Clamp | Double Pole Clamp |
| 17 | Supply of E Bracket | E Bracket |
| 18 | Supply of Henley Type Lailless Unit | Henely Type Tailless Unit Protection Cubical Panel 500 A, 650 V for 250 KVA DT |
| 19 | Supply of LT PVC Cable | LT PVC Cable 3.5x70/35 sq. mm |
| 20 | Supply of Distribution Box Clamp | Distribution Box Clamp |
| 21 | Supply of Clamp with Nut and Bolts | Clamp with Nut and Bolts |
| 22 | Supply of Allunimum Lug 25 KVA TF | Allunimum Lug 25 KVA TF |
| 23 | Supply of Allunimum Lug 63 KVA TF | Allunimum Lug 63 KVA TF |
| 24 | Supply of Allunimum Lug 100 KVA TF | Allunimum Lug 100 KVA TF |
| 25 | Supply of Allunimum Lug 250 KVA TF | Allunimum Lug 250 KVA TF |
| 26 | Supply of Allunimum Lug 400 KVA TF | Allunimum Lug 400 KVA TF |
| 27 | Safe Carriage of PCC 8.5 M Pole | Safe carriage of PCC 8.5 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 28 | Safe Carriage of ST Pole 9 M Pole | Safe carriage of ST Pole 9 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 29 | Safe Carriage of ST Pole 11 M Pole | Safe carriage of ST Pole 11 m Pole from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 30 | Safe Carriage of 25 KVA TF | Safe carriage of 11/0.4 KVA TF 25 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 31 | Safe Carriage of 63 KVA TF | Safe carriage of 11/0.4 KVA TF 63 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 32 | Safe Carriage of 100 KVA TF | Safe carriage of 11/0.4 KVA TF 100 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 33 | Safe Carriage of 250 KVA TF | Safe carriage of 11/0.4 KVA TF 250 KVA from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 34 | Safe Carriage of 11 KV Pin Insulator | Safe carriage of 11 KV Pin Insulator from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 35 | Safe Carriage of 11 KV Disc Insulator | Safe carriage of 11 KV Disc Insulator from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 36 | Safe Carriage of 11 KV Disc Fitting | Safe carriage of 11 KV Disc Fitting from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 37 | Safe Carriage of 11 KV Fuse Set | Safe carriage of 11 KV Fuse Set from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 38 | Safe Carriage of Earthing | Safe carriage of Earthing Complete from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 39 | Safe Carriage of LT AB Cable | Safe carriage of LT AB Cable 3x50+1x35+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 40 | Safe Carriage of LT AB Cable | Safe carriage of LT AB Cable 3x95+1x70+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 41 | Safe Carriage of LT AB Cable | Safe carriage of LT AB Cable 3x120+1x95+1x16 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 42 | Safe Carriage of LT XLPE Cable | Safe carriage of LT XLPE 1x400 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 43 | Safe Carriage of LT XLPE Cable | Safe carriage of LT XLPE 3.5x70 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 44 | Safe Carriage of LT XLPE Cable | Safe carriage of LT XLPE 1x120 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 45 | Safe Carriage of ACSR Weseal Conductor | Safe carriage of ACSR Weseal Conductor from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 46 | Safe Carriage of LT PVC Armoud Cabler | Safe carriage of LT PVC Armoud Cable 4x16/2Cx4 sq. mm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 47 | Safe Carriage of Distribution Box | Safe carriage of Distribution Box from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 48 | Safe Carriage of Stay Set Complete | Safe carriage of Stay Set Complete from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends. |
| 49 | Erection of PCC Pole 8.5 M Single Support | Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 50 | Erection of ST Pole 11 M Single Support | Erection of 11 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 51 | Erection of ST Pole 9 M Single Support | Erection of 9 mtr long ST Pole as single support including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 52 | Erection of PCC Pole 8.5 M Double Pole | Erection of 8.5 mtr long PCC Pole as Double Pole/Section Pole including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 53 | Erection of ST Pole 11 M Double Pole | Erection of 11 mtr long ST Pole as Double Pole/Section Pole including fixing of HT/LT accessories etc complete, pole should be gruted properly as per DVVNL/Respo norms. |
| 54 | Laying Sagging of Weseal Conductor | Laying sagging stringing, binding, jumpering & fixing of weseal Conductor with all accessories etc. |
| 55 | Laying Sagging of LT AB Cable | Laying sagging stringing, binding, jumpering & fixing of LT AB Cable 3x50+1x35+1x16 sq. mm with all accessories etc. |
| 56 | Laying Sagging of LT AB Cable | Laying sagging stringing, binding, jumpering & fixing of LT AB Cable 3x95+1x70+1x16 sq. mm with all accessories etc. |
| 57 | Laying Sagging of LT AB Cable | Laying sagging stringing, binding, jumpering & fixing of LT AB Cable 3x120+1x95+1x16 sq. mm with all accessories etc. |
| 58 | Laying Sagging of LT XLPE Cable | Laying sagging stringing, binding, jumpering & fixing of LT XLPE 1x400 sq. mm with all accessories etc. |
| 59 | Laying Sagging of LT XLPE Cable | Laying sagging stringing, binding, jumpering & fixing of LT XLPE 3.5x70 sq. mm with all accessories etc. |
| 60 | Laying Sagging of LT XLPE Cable | Laying sagging stringing, binding, jumpering & fixing of LT XLPE 1x120 sq. mm with all accessories etc. |
| 61 | Laying Sagging of LT PVC Armoud Cable | Laying sagging stringing, binding, jumpering & fixing of LT PVC Armoud Cable 4x16/2Cx4 sq. mm. with all accessories etc. |
| 62 | Laying Sagging of LT PVC Cable | Laying sagging stringing, binding, jumpering & fixing of LT PVC Cable 3.5x70/35 sq. mm with all accessories etc. |
| 63 | Erection of Plinth 250 KVATF | Construction and ionstallation of plinth of 250 Kva TF, complete in all respect. |
| 64 | Providing and Installation of Fancing | construction and installation of 6 feet height welded wire mech fancing 4M X 4M area, for 250 KVA TF, complete in all respect. |
| 65 | Erection of Pipe earthing | Pipe earthing up to water level of 250 KVA medium Power Transformers (Body & Nutral). All material shall be provided by the contractor. |
| 66 | Mounting of 25 KVA TF | Mounting of 25 KVA TF on D/P including making of the connection etc. complete. |
| 67 | Mounting of 63 KVA TF | Mounting of 63KVA TF on D/P including making of the connection etc. complete. |
| 68 | Mounting of 100 KVA TF | Mounting of 100 KVA TF on D/P including making of the connection etc. complete. |
| 69 | Mounting of 250 KVA TF | Mounting of 250 KVA TF on Plinth including making of the connection etc. complete. |
| 70 | Erection and grouting of stay | Erection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 71 | Erection of Stone Pad | Stone Pad 300x300x75 mm |
| 72 | Fixing of Barbed Wire | Fixing of Barbed Wire |
| 73 | Fxing of Danger Board | Danger Board with Clamp |
| 74 | Fxing of Number Plate | Fxing of Number Plate |
| 75 | Erection of Earthing Complete | Erection of Earthing Complete |
| 76 | Erection of 3 Phase Distribution Box | Erection of 3 Phase Distribution Box with clamp |
| 77 | Erection of Dead end Clamp | Erection of Dead end Clamp |
| 78 | Erection of PRC Connector | Erection of PRC Connector |
| 79 | Erection of 11 KV Fuse Set | Erection of 11 KV Fuse Set |
| 80 | Erection and installation of Lailless Unit | Erection and installation of Henely Type Tailess Unit Protection Cubical Panel 500 A, 650 V for 250 KVA DT |
| 81 | Received Back Material of 10 and 16 KVA TF | Carriage old material of 10/16 TF from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking. |
| 82 | Received Back Material of 100 KVA TF | Carriage old material of 100 KVA from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking. |
| 83 | Received Back Material of LT AB Cable | Carriage old material of LT AB Cable 3x50+1x35+1x16 sq. mm from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking. |