| 1 | Dismentaling cement concrete or brick work or granolithic floor including stacking of dismantaled material as directed by Engineer-in- Charge within s distance of 60 meter. |
| 2 | Excavating Supplying, and filling of local earth (including royaity) by mechanical upto 1km also including ramming and watering 66.46 of the earth in layers not 20 cm in trenches, plinth sides foundation etc complete. Add extra on above item no-2.25(b) a for 3km cartage including all complete. |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),excavated soil and disposal of surplus excavated soil directed, within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. |
| 4 | Laying of base concrete 1:6:12 with cement C.Sand & 40mm Brick ballast including mat.Lab.T&P,etc all complete.) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 graded brick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors. |
| 5 | Class-150 brick work in 1:4 cement & coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. etc all complete. |
| 6 | 12mm. Thick plaster in single coat on fair side of single or half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and/or rounded angles not exceeding 80 mm. in girth and finished evenand smooth No extra for mixing any additive and 1:3 cement:coarse sand etc all complete. |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15\\" landings, balconles, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finihing and reinforcement: 1:1.5:3 (1 Cement: 1.5 Coarse sand (zone-III): 3 graded stone aggregate 20 mm (nominal size). |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not include in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authrized overlapping shall be measured up to floor two level(over all Rate)12 mm to 32 mm. tor etc.all complete. |
| 9 | construction of gsb granular sub base by providing well graded material spreding in uniform layers with mortar grader on prepared surface complete as per mort&h etc all complete |
| 10 | Providing and Laying of Rubber moulded Interlocking concrete block with 80mm thick ICBP(75% Grey & 25% Red/Yellow coloured) having strength not less than 30KN/m2 complete as per technical Specification Clause. Ch-26, mord-1504.ch-26, mord-1500.(6.7) |
| 11 | laying old cement concrete interlocking paver blocks of any desingn/shape laid in required line, level, curvature, colour and pattern over and including 50mm thick compacted bed of course sand, filling the joints with fine sand etc all complete. |
| 12 | Construction of gullypit as per knn including material all complete work. |
| 13 | cartage of earth upto 3km including loading and unloading incl mat all complete. |
| 14 | S/F of Sign board with pedestal etc all complete |
| 15 | TAX18% Please Enable Macros to View BoQ information |