| 1 | Safe carriage of following material from ESC Daliganj/Chinahut to JE Dump store including loading unloading and proper stacking of material |
| 2 | Line Material. |
| 3 | PCC pole 8.5/9 Mtr long |
| 4 | STP Pole 9/11 Mtr. long. |
| 5 | 100 KVA T/F |
| 6 | 250 KVA T/F |
| 7 | LT PVC Cable 1x400/3.5x 240/1x 70SQMM |
| 8 | ABC( 3x120/95/70/25/16) Sqmm. |
| 9 | 11 KV XLPE Cable (3x35/70/120 /170/185) |
| 10 | 11 KV CJ KIT O/D |
| 11 | 11 KV Polymer Insulator |
| 12 | 11 KV Polymer Disc Insulator |
| 13 | Gi wire |
| 14 | Stay Set Complete |
| 15 | Three Phase DP Box |
| 16 | Safe carriage of following material from JE Dump store to site including loading unloading |
| 17 | Line Material. |
| 18 | PCC pole 8.5/9 Mtr long |
| 19 | STP Pole 9/11 Mtr. long. |
| 20 | 100 KVA T/F |
| 21 | 250 KVA T/F |
| 22 | LT PVC Cable 1x400/3.5x 240/1x 70SQMM |
| 23 | ABC( 3x120/95/70/25/16) Sqmm. |
| 24 | 11 KV XLPE Cable (3x35/70/120 /170/185) |
| 25 | 11 KV CJ KIT O/D |
| 26 | 11 KV Polymer Insulator |
| 27 | 11 KV Polymer Disc Insulator |
| 28 | Three Phase DP Box |
| 29 | Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary clamps. Accessories required including supply & fixing of straight MS 100x50mm top channel (2240mm long) one no. dropper channel/Angle 100x50 mm 2 nos. with arrangement of fixing 3 nos. pin insulator as per RESPO specification and direction of E/I. Only pole & insulator supplied by the deppt. |
| 30 | Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department. |
| 31 | Prepare proper space for contruction of Plinth |
| 32 | Construction of T/F plinth of size 2x2x1.2 meters with help of 1st class bricks and massonary in the ratio 1:4 cement & sand coarse, filling the structure completely as per norms with RCC top 1:2:2 cement, sand coarse, stone grit with MS bar and MS channel for resting T/F. All material shall be arranged by the contractor. |
| 33 | Interlocking Tiles Inside of T/F Fencing |
| 34 | Wiremess fencing of 11/0.4 KV S/S shall be made of rectangular of size as per site requirement not exceeding 3 meter fabrication 45x45x5 mm angle the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of wire mess. Rectangular welded type wire mess of size 50x25 made of 12 S.W.G. wire mess shall be welded all along the periphery of the frame as well as on horizontal runner to give extra strength of welding to wire mess welded on the frame. Diagonal bracing of all the frame panel will be welded with MS flat of size 25x3mm to support as per RESPO specification & direction of E/I. |
| 35 | Painting of wiremesh Fencing with 2 coat of red oxide and 2 coat of enamel Paint |
| 36 | Construction of massonary type DP Box with First first class brick ballast ,course sand ,cement and MS Bar local sand by making 2 Nos pillar 1 Mtr long 25mm width 6 feet height above ground level ,fixing of 2 Nos MS Angle for mounting of Henlay type fuse unit plastering both side with provision of ,all material arrange by contractor . |
| 37 | Fabrication and fixing of Henlay type Tailless Fuse Unit 500 Amp 650 Volts |
| 38 | Fabrication and Fixing of Electrolytic copper Bus bar of Size 50x6x750mm |
| 39 | Providing & Fixing of 8 No. Fuse wire |
| 40 | Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole. |
| 41 | Providing and fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole. |
| 42 | Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department. |
| 43 | Making 11KV Bus bar on newly erected Double pole and tapping of 11KV line |
| 44 | Erection & commissioning of (3x120/95/70/25/16 Sq.mm) Aerial Bunched Conductor. |
| 45 | Laying of cable 11 KV XLPE cable (3x35/70/120/170/185) sqmm in kaccha road by digging of trench laying cable with frist class brick bixing and sand, as RESPO specification & direction of E/I. |
| 46 | Laying of cable 11 KV XLPE cable (3x35/70/120/170/185) sqmm in pakka road by boring method laying cable as per RESPO specification & direction of E/I. |
| 47 | Hoisting of 11 KV XLPE Cable will be passed through MS pipe of required size duly clamped with pole at the bottom, middle and top of the pole. |
| 48 | Supply and fixing of 11 KV Cable joining kit O/D and I/D. |
| 49 | High pressure testing of 11KV Cable by high pressure equipment |
| 50 | Proper Jumpering of 11KV Cable on tapping point |
| 51 | Laying of LT PVC Cable 1x400/3.5x240 SQMM as RESPO specification & direction of E/I. |
| 52 | Earthing of T/F Pipe type with 60 fit deep borring and providing GI Pipe 1.5\\" dia (60 fit GI Pipe) and GI strip 25x5 mmx6 meter long attached with clamps, L piece, nut & bolts and GI Pipe Cap. All material shall be supplied by the contractor. |
| 53 | Safe Installation of 100 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 54 | Safe Installation of 250 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 55 | Supply and fixing of clamps |
| 56 | Holding clamp |
| 57 | Crimping Al Lugs 240/400 sqmm |
| 58 | Copper L-Piece for 250KVA T/F |
| 59 | Nut bolts off size |
| 60 | Danger board with clamp |
| 61 | Barbed Wire (2Kg/Pole) |
| 62 | Grouting of Pole |
| 63 | Painting of STP Pole |
| 64 | Plinthing & muffing of STP Pole GST will be paid extra as per rule. Please Enable Macros to View BoQ information |