| 1 | Following work need to done on below given 220KV S/C 220KV Nara-Roorkee line.1. Replacement of Tower No. 160 SA+0 by Construction of new Foundation on war foot basis. |
| 2 | Check survey & final peg marking on proposed route and prepration of final profile. |
| 3 | Cost of excavation of 220 KV tower foundation pits including all earth work, back filling watering and leveling. |
| 4 | Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for 220 KV DA+0 tower |
| 5 | Cost of Concreting for 220 KV D/C DA+0 tower foundation including cost of cement coarse sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars |
| 6 | 1:2:4 (RCC) |
| 7 | 1:3:6 (PCC) |
| 8 | Installation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding ng and placing them in foundation pits. |
| 9 | Erection of super structure of 220 KV DC towers and their extensions whenever required including all work above ground level excluding hoisting of insulator, hardware and accessories but including fitting of number, phase plates, bird guard and fixing & punching for 220KV SC/DC line. |
| 10 | Lowering down the zebra conductor including de-hoisting of all the necessary hardwares & accessories between section to section tower of all the six power conductors. |
| 11 | Safely De-stringing of OPGW between setion to section Tower |
| 12 | Stringing, tensioning clamping, jointing etc of ACSR \\"Zebra\\", conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting armour rods, vibration dampers etc. on all the six phases of 220KV D/C Lines. (FOR S/C LINE- 3 PHASES) |
| 13 | Re-stringing of OPGW Fibre Optic Cable along with all neccessary Hardware sets excluding Joint Box. |
| 14 | Grounding work including all earth work etc. for pipe type earthing including cost of all materials except earthing pipe. |
| 15 | Tack welding of all the bolts up to the height of one section or 5 Mtr. from ground level whichever is higher with three tacks of 10mm/12mm electrode & application of Zinc rich point on the affected surface including cost of materials. |
| 16 | Dismantling/Shorting and Transportation of Damaged tower (DA+0) - 01 No. from Site to 220KV Nara S/S Store (approx 20km). Tower will be unloaded and properly stacked at store under supervision JE concern at provided location at substation |
| 17 | Dismantling of earliar foundation which includes Excavation, breaking of foundation upto 2Mtr depth and removing of concreate, cutting, removing of stub and steel reinforcement , backfilling, levelling and making field suitable for agriculture (Per Loc/Job.) |
| 18 | Supply Portion |
| 19 | Tower Accessories |
| 20 | NUMBER PLATE |
| 21 | DANGER PLATE |
| 22 | PHASE PLATE SET |
| 23 | PIPE TYPE EARTHING MATERIAL FOR TENSION TOWERS |
| 24 | CONDUCTOR ACCESSORIES |
| 25 | VIBRATION DAMPER |
| 26 | Repair sleeves |
| 27 | Mid span joint for ACSR Zebra Conductor |
| 28 | Performed Armour Rod |
| 29 | HARDWARE & INSULATOR |
| 30 | Single Suspension Fitting for ACSR zebra conductor |
| 31 | Single tension fitting For ACSR zebra conductor Please Enable Macros to View BoQ information |