| 1 | Safe carriage of following material from ESC Daliganj/Chinahut to JE Dump store to work site including loading unloading and proper stacking of material |
| 2 | Line material |
| 3 | PCC Pole 8.5 Mtr |
| 4 | 11/0.4 KV 63/100 KVA T/F |
| 5 | 11/0.4 KV 250 KVA T/F |
| 6 | LT Cable 1x630/400/240/3.5x240/400mmsq |
| 7 | ACSR Rabbit/dog/Raccoon/Weasel conductor |
| 8 | 11 Polymer Pin Insulator |
| 9 | 11 KV GI Pin with Nut |
| 10 | Stay Set |
| 11 | Stay wire |
| 12 | Earthing Rod |
| 13 | G.I. Wire |
| 14 | ABC Cable 3x120/95/50/25sqmm |
| 15 | DP Box 3 Phase |
| 16 | Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary clamps. Accessories required including supply & fixing of straight MS 100x50mm top channel (2240mm long) one no., dropper channel, substation base angle 100x50 mm 2 nos. with arrangement of fixing 3 nos. pin insulator as per RESPO specification and direction of E/I. Only pole & insulator supplied by the deppt. |
| 17 | Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. Only pole & insulator shall be supplied by the department. |
| 18 | Construction of T/F plinth of size 2x2x1.2 Mtr with first class bricks and massonary work in the ratio 1:4cement and course sand with RCC Top 1:2:2 cement sand and course sand stone gritt with MS bar and MS channel for resting of T/F |
| 19 | Fabrication and fixing of wiremesh fencing of 11/0.4KV S/S made as per requirement 3mtr height 45x45x5 mm angle frame and 1 No horizontal runner by 40x5 mm MS flat then welding of wiremesh on it 50x25mm made of 12 SWG ,diagonal bracing of all the frame panel welded with MS flat 25x3mm support, grouting properly by cement concrete and course sand |
| 20 | Painting of wiremesh Fencing with 2 coat of red oxide and 2 coat of enamel Paint |
| 21 | Construction of missionary type DP Box with First class brick ballast ,course sand ,cement and MS Bar local sand by making 2 Nos pillar 1 Mtr long 25mm width 6 feet height above ground level ,fixing of 2 Nos MS Angle for mounting of Henlay type fuse unit plastering both side with provision of ,all material arrange by contractor |
| 22 | Fixing of 3-Phase Distribution Box/Kiosk on the LT Pole including all clamps and material required for mounting connections and sealing. |
| 23 | Fabrication and fixing of Henley type Tailless Fuse Unit 500 Amp 650 Volts |
| 24 | Fabrication and Fixing of Electrolytic Bus bar of Size 50x6x750mm |
| 25 | Proper Jumpering of 11KV Line on tapping point |
| 26 | Providing and fixing of 11KV DO Fuse set along with clamp and nut bolt |
| 27 | Laying of LT Cable from T/F to DP Box and DP Box to LT Line pole |
| 28 | Hoisting of LT cable will be passed through GI pipe required size duly clamped with pole at the bottom ,middle and top of the pole only cable supplied by department |
| 29 | Proper Jumpering with existing LT Line with PVC Cable |
| 30 | Errection and commissioning of AB Conductor of size 3x120/95/50/25sqmm |
| 31 | Laying stringing and sagging of 3Phase 3 wire 11KV line on ACSR Weasel/Rabbit /Racoon /Dog conductor as per Respo |
| 32 | Ordinary Earthing by MS Earth rod2500 mm long all material provided by department. |
| 33 | Grouting binding nuzzling of stay set complete including fixing of necessary clamps accessories stay set and stay wire provided by department |
| 34 | Earthing of Pipe type with 60 feet deep boring and providing jindal make pipe \\"B\\" class 1\\" dia and GI strip 25x5 6mtr long attached with clamps and GI pipe . |
| 35 | Safe Installation of 63/100 KVA T/F on Plinth by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 36 | Safe Installation of 250/400 KVA T/F on Plinth by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 37 | Providing, fabrication and fixing of 11KV TPMO Set with AB Switch along with clamps, nut & bolts on existing double pole. |
| 38 | Grouting of PCC/STP in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mm x 45mm above ground level in 1:2:4 in cement, coarse sand and stone grit as per RESSPO norms. |
| 39 | Supply & Fixing |
| 40 | Al Lug 70 sqmm |
| 41 | Al Lug 240 sqmm |
| 42 | Al Lug 400 sqmm |
| 43 | Copper L piece |
| 44 | LT clamp with I hook |
| 45 | Nut & Bolts |
| 46 | Supination Clamp with I hook |
| 47 | Dead End Clamp with I hook GST will be paid extra as per rule. Please Enable Macros to View BoQ information |