|
| 1 | 2.0 Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs) |
| 2 | 2.0 Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs) |
| 3 | Old Unserviceable GI Tubing 40 mm |
| 4 | Old Unserviceable GI Tubing 50 mm |
| 5 | Old Unserviceable GI Tubing 80 mm |
| 6 | Old Unserviceable GI Tubing 100 mm |
| 7 | Old Unserviceable Gun Metal Gate Valve 50 mm |
| 8 | Old Unserviceable Gun Metal Gate Valve 40 mm |
| 9 | Old Unserviceable S/S Spindle/wedge nut and gland cover 300mm |
| 10 | Old Unserviceable S/S Spindle/wedge nut and gland cover 150mm |
| 11 | Old Unserviceable S/S Spindle/wedge nut and gland cover 100mm |
| 12 | Old Unserviceable S/S Spindle/wedge nut and gland cover 80mm |
| 13 | Old Unserviceable cast iron sluice valve of size 300mm bore |
| 14 | Old Unserviceablecast iron sluice valve of size 200mm bore |
| 15 | Old Unserviceable cast iron sluice valve of size 150mm bore |
| 16 | Old Unserviceable cast iron sluice valve of size 100 mm bore |
| 17 | Old Unserviceable cast iron sluice valve of size 80mm bore |
| 18 | Old Unserviceable `D` joint with collar and nuts Bolts of size 300/200mm |
| 19 | Old Unserviceable `D` joint with collar and nuts Bolts of size 150mm |
| 20 | Old Unserviceable `D` joint with collar and nuts Bolts of size 100/80 mm |
| 21 | Old Unserviceable `D` joint with collar and nuts Bolts of size 50 mm |
| 22 | Old Unserviceable non return valve of size 150mm |
| 23 | Old Unserviceable non return valve of size 100 mm |
| 24 | Old Unserviceable non return valve of size 80 mm |
| 25 | Old Unserviceable CI flanged pipe of size 80 mm bore |
| 26 | Old Unserviceable CI flanged pipe of size 100 mm bore |
| 27 | Old Unserviceable CI flanged pipe of size 150 mm bore |
| 28 | Old unserviceable flange joints materials |
| 29 | Old Unserviceable CI Fittings |
| 30 | Old Unserviceable CI/DI pipe of size 100 mm bore |
| 31 | Old Unserviceable CI/DI pipe of size 150 mm bore |
| 32 | Old Unserviceable CI/DI pipe of size 200 mm bore |
| 33 | Old Unserviceable CI/DI pipe of size 300 mm bore |
| 34 | Old Unserviceable valve pit material brick and iron etc Total amount of credit schedule 352090.0 Signature of contractor AGE (Contracts) For ACCEPTING OFFICER |