| 1 | Disconnecting the electrical power connection and dismantling the motor-pump coupling and foundation bolt etc for withdrawal the Motor (Make: CG, 200kW, 415V, 3phase, 1485rpm, 50Hz) of Pump No.A (Madhyamgram Batch) with proper protection as per direction & satisfaction of EIC. |
| 2 | Repairing , tesing checking of 200 Kw , 1440 RPM LT Motor (CG : Make) by rewinding of stator and replacement of bearing including To & Fro transportation as per technical specification and direction of EIC. (Deducted salvage value) |
| 3 | Reinstallation and alignment of the above motor (Make: CG, 200kW, 415V, 3phase, 1485rpm, 50Hz) of Pump (Madhyamgram Batch) with testing after reconnection of power supply terminals and fitting of couplingas with necessary spare parts supply as per technical specification and direction of the EIC. |
| 4 | Disconnecting the electrical power connection and dismantling the motor-pump coupling and foundation bolt etc for withdrawal the Motor No.B (Make: CG, 90 kW, 415V, 3phase, 1485rpm, 50Hz) of Pump (New Barrackpore Batch) with proper protection as per direction & satisfaction of EIC. |
| 5 | Repairing , tesing checking of 90 Kw , 1440 RPM LT Motor (CG : Make) by replacement of 6 Nos copper Lead with sockets , Heat varnishing and replacement of terminal block including To & Fro transportation as per technical specification and direction of EIC. (Deducted salvage value) |
| 6 | Reinstallation and alignment of the above motor (Make: CG, 90 kW, 415V, 3phase, 1485rpm, 50Hz) of Pump (New Barrackpore Batch) with testing after reconnection of power supply terminals and fitting of couplingas with necessary spare parts supply as per technical specification and direction of the EIC. |
| 7 | Supply, delivery, fitting and testing of of FN200 TPN Switch Disconnector unit for 90 Kw motor feeder as per technical specification and direction of EIC. |
| 8 | Supply,delivery , fitting and fixing of HRC Fuse of 700 Amp ,690 V, IR 700-200KA for Soft Starter Panel as per sample and direction of EIC. ( Make:Bussmann) (Deducted salvage value) |
| 9 | Supply,delivery , fitting and fixing of HRC Fuse of 550 Amp ,690 V, IR 700-200KA for Soft Starter Panel as per sample and direction of EIC. (Model:ETN170M5013, Make:Bussmann) (Deducted salvage value) |
| 10 | Supply, delivery , fitting and fixing of UPS 660W / 1100VA for automatic altitude control panel at Ward No.18 ESR, Madhyamgram as per technical specification and direction of EIC. ( Make:APC) |
| 11 | Supply , installation and commissioning of 350NB ,PN16 MS Dismantling Joint at Ward No.18 ESR, Madhyamgram as per technical specification and direction of EIC. |
| 12 | supply ,delivery and installation of Quarturn Gear For Actuator as per sample and direction of EIC. |
| 13 | supply and delivery M18x110 HT Bolt with nut as per sample and direction of EIC. |
| 14 | Servicing and reinstallation of Soft-Stator Panel( for Barasat-B) by dismantaling it part by part and checking all contact mechanisim and cleaning the all parts by CRG & Thinner, repairing and testing with other allied work for item no 8-9 as per technical specification and direction of the EIC |
| 15 | Supply of Flat Rubber Gasket of EPDM Quality with ISI Mark to IS: 5382/1985 Type-4 suitable for flange joint, drilled to IS: 1538 (Table–VI). The gasket should have dual thickness 3/6 mm with 6 mm thickness at the sealing cross section. For 350NB |
| 16 | Repair of Air valve by supplying ebonite and rubber ball, gasket, nuts and bolts with washers and labour all complete. For 150 Diameter |
| 17 | Add Labour Welfare Cess @ 1.00 % on Rs.505,519.00 i.e Total amount over item no. 1 to 16 |
| 18 | Add G.S.T. @ 18.00 % on Rs.510,574.19 i.e Total amount over item no. 1 to 17 Please Enable Macros to View BoQ information |