| 1 | 11 KV Cut Point with 180 Degree AnglePSC POLE 10 METER LONG 300 KG |
| 2 | PSC Pole Clamp (GI) |
| 3 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 1.2 mtr., 2 no's Channel (GI) required =( 2x9.56x1.2) |
| 4 | Fish Plate (GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 5 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 0.306 mtr., 2 no's Channel (GI) required =(2x9.56x0.306) |
| 6 | Danger Plate, 1 no's. |
| 7 | Back Clamp for danger Plate 25X3 mm. Flat (GI), 0.59Kg/Mtr. Flat (GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 8 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 9 | Back Clamp for anticlimbing device 25X3 mm. Flat (GI), 0.59Kg/Mtr. Flat (GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 10 | 11 KV pin insulator polymer |
| 11 | H W fitting(B&S) 70KN, 3Bolt |
| 12 | Disc insulator (B&S) 70 KN polymer |
| 13 | Earthing of Support ( Coil Type ) |
| 14 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 15 | WEDGE Connector for 55 sq.mm AAA conductor |
| 16 | PoLYCARBONATE BIRD GUARD |
| 17 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 18 | Black paint (GIS Numbering and & Zebra Sripping) |
| 19 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 20 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1667mm) =0.42Cu. Mtr. |
| 21 | 11 KV Pin Points With WPBPSC POLE 10 METER LONG 300 KG |
| 22 | PSC Pole Clamp (GI) |
| 23 | 11KV V Cross Arm GI (10.2 Kg Each) |
| 24 | Top bracket 100 x 50 x 6mm GI Channel (GI) (2kg each) |
| 25 | Danger Plate 1No. for each pole |
| 26 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 27 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 28 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 29 | 11 KV Pin insulator Polymer. |
| 30 | Earthing of support (Coil type) |
| 31 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 32 | G.I. nuts, Bolts & washer of different size (1.45Kg/ Pin Point) |
| 33 | 55 mmsq AAAC |
| 34 | Black paint (GIS Numbering and & Zebra Sripping) |
| 35 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 36 | PoLYCARBONATE BIRD GUARD |
| 37 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1667mm) =0.42Cu. Mtr. |
| 38 | (ii) : Installation of DP without AB switch =1NoWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)-DP |
| 39 | Top Channel (GI) GI 100 x 50 x 6 mm 9.56 Kg / Mtr., each chanel length (3Mtr. 2Nos. Channel (GI) required (2 x 9.56 x 3) |
| 40 | Fish Plate (GI) 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 6Nos. required = (6x2.36 x 0.280) |
| 41 | Double Pole belting Channel (GI) 75x40 x 4.8mm 7.14KG per Mtr. each Channel (GI) length 1.66Mtr. 4 Nos. Chanel required = (7.14x3 x 4) |
| 42 | 50x50 x6mm GI Bracing Angle, 4.5Kg/Mtr. each Channel (GI) length 2.671Mtr. 4 Nos. Chanel required = (4.5x3.512 x 4) |
| 43 | Danger Plate 2Nos. |
| 44 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 2No. = (2x 0.59 x 0.510) |
| 45 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 46 | HT Stay set complete |
| 47 | HT Stay Insulator-Type C |
| 48 | 7/10 (SWG) Stay wire 15kg/Stay |
| 49 | GI pipe earthing 40 mm 3Mtr. Long |
| 50 | 50x6mm GI flat for earthing, 2.36kg/mtr., (2.5 Mtr. For mesh for mesh formation and 2.5mtr. For raising) =20.5x2.6 |
| 51 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 52 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 8No. = (8x 0.59 x 0.510) |
| 53 | 11 KV Pin insulator Polymer. |
| 54 | H.W. Fittings (B&S) 70KN 3 bolt |
| 55 | Disc insulator (B&S) 70 KN Polymer |
| 56 | WEDGE CONNECTOR FOR 55 SQMM CONDUCTOR |
| 57 | PoLYCARBONATE BIRD GUARD |
| 58 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 59 | Black paint (GIS Numbering and & Zebra Sripping) |
| 60 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 61 | Civil & ServiceFixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard |
| 62 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 63 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 64 | Construction of Earth chamber including installation of earthing pipe, Makind earthing chamber including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm/50mm including welding of GI flat around pipe. |
| 65 | (iii) : Installation of 100KVA S/SWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 66 | 9 Mtr. long 300 Kg. PSC Pole (For Raising of LT ABC) |
| 67 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 68 | EYE hook for XLPE Aerial bunched Cable |
| 69 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 70 | LT Cable raising channel GI 75x40x4.8 mm GI Channel (1000 mm long)(7.14Kg./Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 71 | Top Channel GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 72 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 73 | M.U Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 74 | AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 75 | AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35) |
| 76 | Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1) |
| 77 | HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 78 | Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 79 | Cantilever Support Angle 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 80 | Transformer Base GI Channel 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 81 | Transformer Base Support GI Channel 100 X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) |
| 82 | Transformer Belting Angle 50 X 50 X 6MM GI (3000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x3.0x4.5 Kg) |
| 83 | Transformer Belting Support Angle 50 X 50 X 6MM GI (580 mm long)(4.5Kg./Mtr,2 No's) (Each 2x0.580x4.5= Kg) |
| 84 | LTDB Mounting Angle 50 X 50 X 6MM GI (1000 mm long)(4.5Kg./Mtr, 2 No's) (Each 2x1x4.5 Kg) |
| 85 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 86 | LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S |
| 87 | 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (50 Mtr. Each Dtr.) |
| 88 | 4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR 100 KVA Trf. |
| 89 | 1.1KV 4 Cx 150 mm2 LT XLPE Cable(Armoured) - FOR Allmunium UG Cable from LTDB to Pole |
| 90 | AB Switch(11KV,200A.3pole,50Hz) |
| 91 | H.G.Fuse( 11KV.200A.3Pole) |
| 92 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 93 | PoLYCARBONATE BIRD GUARD |
| 94 | Disc insulator (B&S)70 KN polymer |
| 95 | H W fitting (B&S)70KN(3bolted) |
| 96 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 97 | 11KV pin insulator polymer |
| 98 | HT stay set complete |
| 99 | HT stay Clamp (1.9Kg/pair) |
| 100 | HT stay insulator TYPE-C |
| 101 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 102 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 103 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 104 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 105 | Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 106 | Danger plate 11kv |
| 107 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 108 | Name plate |
| 109 | Structure Numbering and MarkingYellow Colour Paint for Background |
| 110 | Black Colour Paint for numbering |
| 111 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 112 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 113 | PCC ratio 1:3 :6 (M 10 Grade) for DSS Area (5x3x0.1) = 1.5 Cum (Per pole) |
| 114 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900 x 600 x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire stay insulator. |
| 115 | Fixing and concreating of stay set with 0.5 cum cement concret foundation 1:3:6 size (900mm x 600mm x 900mm) using 40 mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 116 | Laying of 4C x 150msq LT XLPE Cable |
| 117 | SITC and Erection of GI fencing with Gate |
| 118 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 119 | Supply of AL lugs suitable for 150sqmm cable / conductor, crimping with cable and fixing / connecting include supply and erection of PVC tape as per voltage requirement. |
| 120 | Supply and erection of double compression flameproof type glanding for armoured cable 3.5 / 4c 120-185qmm including making hole in base plate and dressing of cable along with vermin proofing properly, supply to be done as per TPCODL spec and approved make dowells. |
| 121 | Part-iv: Const. of LT AB Cable Line Length with 33 Mtr. Span using 4C×35 mm² (P)+1Cx35 mm²(M)+1CX16 mm²(Street Light)=0.18KMLT AB Cable line9Mtr. long PSC Pole 300 Kg. |
| 122 | LT Stay set complete |
| 123 | 7/12 (SWG) G.I. Stay wire-Grade-2 |
| 124 | LT Stay Clamp (1.4 kg / pair) |
| 125 | LT Stay Insulator |
| 126 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 127 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 128 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 129 | Suspension clamp with EYE hook for ABC (25-70mmsq) |
| 130 | 4C x35mmsq + 1C x35mmsq + 16mmsq (Street light) LT AB Cable |
| 131 | Insulated piercing connector, Type A main 25 to 150mmsq and Tap 6 to 35sqmm. |
| 132 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 133 | Earthing of support (Coil type) |
| 134 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 135 | Danger Plate LT |
| 136 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 137 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 138 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 139 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 140 | Black paint (GIS Numbering and & Zebra Sripping) |
| 141 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 142 | Civil & ServiceFixing of LT complete stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG Metal with all labour and material (Excavation of earth will be done of size 500 x 500 x 1500mm.) |
| 143 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 144 | Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm / 50mm including welding of GI flat around pipe. |
| 145 | Dismantling materials of 11KV, S/S and LT line alongwith all accessories Please Enable Macros to View BoQ information |