| 1 | 11 KV Cut Point with 180 Degree AnglePSC POLE 10 METER LONG 300 KG |
| 2 | PSC Pole Clamp (GI) |
| 3 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 1.2 mtr., 2 no's Channel (GI) required =( 2x9.56x1.2) |
| 4 | Fish Plate (GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 5 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel (GI) length 0.306 mtr., 2 no's Channel (GI) required =(2x9.56x0.306) |
| 6 | Danger Plate, 1 no's. |
| 7 | Back Clamp for danger Plate 25X3 mm. Flat (GI), 0.59Kg/Mtr. Flat (GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 8 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 9 | Back Clamp for anticlimbing device 25X3 mm. Flat (GI), 0.59Kg/Mtr. Flat (GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 10 | 11 KV pin insulator polymer |
| 11 | H W fitting(B&S) 70KN, 3Bolt |
| 12 | Disc insulator (B&S) 70 KN polymer |
| 13 | Earthing of Support ( Coil Type ) |
| 14 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 15 | WEDGE Connector for 55 sq.mm AAA conductor |
| 16 | PoLYCARBONATE BIRD GUARD |
| 17 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 18 | Black paint (GIS Numbering and & Zebra Sripping) |
| 19 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 20 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1667mm) =0.42Cu. Mtr. |
| 21 | Cut point with 90 degree angle.Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 1.2 Mtr. 4 Nos. Chanel required = (4x9.56 x 1.2) |
| 22 | Fish Plate 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 16Nos. required = (16x2.36 x 0.280) |
| 23 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 0.306 Mtr. 4 Nos. Chanel required = (4x9.56 x 0.306) |
| 24 | 11 KV Pin insulator Polymer. |
| 25 | H.W. Fittings (B&S) 70KN 3 bolt |
| 26 | Disc insulator (B&S) 70 KN Polymer |
| 27 | WEDGE CONNECTOR FOR 50 SQMM CONDUCTOR |
| 28 | PoLYCARBONATE BIRD GUARD |
| 29 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 30 | HT Stay set complete |
| 31 | HT Stay Insulator-Type C |
| 32 | 7/10 (SWG) Stay wire 15kg/Stay |
| 33 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 34 | Civil & ServicesFixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard |
| 35 | 11 KV Pin Points With WPBPSC POLE 10 METER LONG 300 KG |
| 36 | PSC Pole Clamp (GI) |
| 37 | 11KV V Cross Arm GI (10.2 Kg Each) |
| 38 | Top bracket 100 x 50 x 6mm GI Channel (GI) (2kg each) |
| 39 | Danger Plate 1No. for each pole |
| 40 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 41 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 42 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 43 | 11 KV Pin insulator Polymer. |
| 44 | Earthing of support (Coil type) |
| 45 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 46 | G.I. nuts, Bolts & washer of different size (1.45Kg/ Pin Point) |
| 47 | 55 mmsq AAAC |
| 48 | Black paint (GIS Numbering and & Zebra Sripping) |
| 49 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 50 | PoLYCARBONATE BIRD GUARD |
| 51 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1667mm) =0.42Cu. Mtr. |
| 52 | Part-ii: Const. of LT AB Cable Line Length with 33 Mtr. Span using - 4C×50 mm² (P)+1Cx50 mm²(M)+1CX16 mm²(Street Light)=0.78KMLT AB Cable line9Mtr. long PSC Pole 300 Kg. |
| 53 | LT Stay set complete |
| 54 | 7/12 (SWG) G.I. Stay wire-Grade-2 |
| 55 | LT Stay Clamp (1.4 kg / pair) |
| 56 | LT Stay Insulator |
| 57 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 58 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 59 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 60 | Suspension clamp with EYE hook for ABC (25-70mmsq) |
| 61 | 4C x50mmsq + 1C x50mmsq + 1Cx16mmsq (Street light) LT AB Cable |
| 62 | Insulated piercing connector, Type A main 50 to 150mmsq and Tap 50 to 150sqmm. |
| 63 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 64 | Earthing of support (Coil type) |
| 65 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 66 | Danger Plate LT |
| 67 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 68 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 69 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 70 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 71 | Black paint (GIS Numbering and & Zebra Sripping) |
| 72 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 73 | Civil & ServiceFixing of LT complete stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG Metal with all labour and material (Excavation of earth will be done of size 500 x 500 x 1500mm.) |
| 74 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 75 | Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm / 50mm including welding of GI flat around pipe. |
| 76 | (iii) Dismantalling materialsDismantling of 9/8 Mtr. PSC/Joist Pole and return to TPCODL store |
| 77 | Dismantling of 11kV Pin Insulator with Pin and return to TPCODL store |
| 78 | Dismantling/Removal of V Cross arm from pole and return to TPCODL store |
| 79 | Dismantling of suspension / Dead End Clamp and return to TPCODL store |
| 80 | Dismantling of 34mmsq AAA Conductor and return to TPCODL store Please Enable Macros to View BoQ information |