|
| 1 | PKG-1SCHEDULE ITEMS DSR 2023-30% |
| 2 | PKG-1NON SCHEDULE ITEMS |
| 3 | PKG-2SCHEDULE ITEMS DSR 2023-30% |
| 4 | PKG-2 NON SCHEDULE ITEMS |
| 5 | PKG-1 Electrical Schedule Item |
| 6 | PKG-1 Electrical Non Schedule item |
| 7 | PKG-2 Electrical Schedule Item |
| 8 | PKG-2 Electrical Non Schedule item |
| 9 | PKG-1SCHEDULE ITEMS DSR 2023-30% |
| 10 | DSR2023 item: 2.8.1 |
| 11 | DSR2023 item: 2.25 |
| 12 | DSR2023 item: 4.1.3 |
| 13 | DSR2023 item: 5.3 |
| 14 | DSR2023 item: 5.9.4 |
| 15 | DSR2023 item: 5.12 |
| 16 | DSR2023 item: 5.22A.6 |
| 17 | DSR2023 item: 6.4.2 |
| 18 | DSR2023 item: 6.13.2 |
| 19 | DSR2023 item: 7.38.1.1 |
| 20 | DSR2023 item: 8.2.2.2 |
| 21 | DSR2023 item: 8.31 |
| 22 | DSR2023 item: 9.21.2 |
| 23 | DSR2023 item: 9.62.1 |
| 24 | DSR2023 item: 9.63.1 |
| 25 | DSR2023 item: 9.66.1 |
| 26 | DSR2023 item: 9.82 |
| 27 | DSR2023 item: 10.1 |
| 28 | DSR2023 item: 10.16.1 |
| 29 | DSR2023 item: 10.25.2 |
| 30 | DSR2023 item: 11.39 |
| 31 | DSR2023 item: 11.40 |
| 32 | DSR2023 item: 11.46.3 |
| 33 | DSR2023 item: 12.41.2 |
| 34 | DSR2023 item: 12.42.5.2 |
| 35 | DSR2023 item: 12.43.2 |
| 36 | DSR2023 item: 13.2.2 |
| 37 | DSR2023 item: 13.16.1 |
| 38 | DSR2023 item: 13.18 |
| 39 | DSR2023 item: 13.41.1 |
| 40 | DSR2023 item: 13.47.1 |
| 41 | DSR2023 item: 13.61.1 |
| 42 | DSR2023 item: 13.71 |
| 43 | DSR2023 item: 13.80 |
| 44 | DSR2023 item: 13.88 |
| 45 | DSR2023 item: 13.91 |
| 46 | DSR2023 item: 13.99.1 |
| 47 | DSR2023 item: 14.1.2 |
| 48 | DSR2023 item: 14.2.2 |
| 49 | DSR2023 item: 14.6.1 |
| 50 | DSR2023 item: 14.8.2 |
| 51 | DSR2023 item: 15.2.1 |
| 52 | DSR2023 item: 15.7.4 |
| 53 | DSR2023 item: 16.70.2 |
| 54 | DSR2023 item: 17.10.2.2 |
| 55 | DSR2023 item: 17.13.2 |
| 56 | DSR2023 item: 18.9.2 |
| 57 | DSR2023 item: 18.9.4 |
| 58 | DSR2023 item: 18.48 |
| 59 | DSR2023 item: 18.51.1 |
| 60 | DSR2023 item: 22.14.1 |
| 61 | Deduction for using PPC over OPC |
| 62 | PKG-1NON SCHEDULE ITEMS |
| 63 | NS-1/ Man- power Unskilled for Cleaning |
| 64 | NS-2/ Man- power Unskilled for Cleaning |
| 65 | NS-3/ LOCK |
| 66 | NS-4/Providing corrugated, colour coated |
| 67 | NS-5/supply and fixing of Ridge panel, c |
| 68 | NS-6/Supply of CPVC Gate Valve of dia 2 |
| 69 | NS-7/Supply of CPVC Gate Valve of dia |
| 70 | NS-8/ PillarTap |
| 71 | PKG-2SCHEDULE ITEMS DSR 2023-30% |
| 72 | DSR2023 item: 2.8.1 |
| 73 | DSR2023 item: 2.25 |
| 74 | DSR2023 item: 4.1.3 |
| 75 | DSR2023 item: 5.3 |
| 76 | DSR2023 item: 5.9.4 |
| 77 | DSR2023 item: 5.12 |
| 78 | DSR2023 item: 5.22A.6 |
| 79 | DSR2023 item: 6.4.2 |
| 80 | DSR2023 item: 6.13.2 |
| 81 | DSR2023 item: 7.38.1.1 |
| 82 | DSR2023 item: 8.2.2.2 |
| 83 | DSR2023 item: 8.31 |
| 84 | DSR2023 item: 9.21.2 |
| 85 | DSR2023 item: 9.62.1 |
| 86 | DSR2023 item: 9.63.1 |
| 87 | DSR2023 item: 9.66.1 |
| 88 | DSR2023 item: 9.82 |
| 89 | DSR2023 item: 10.1 |
| 90 | DSR2023 item: 10.16.1 |
| 91 | DSR2023 item: 10.25.2 |
| 92 | DSR2023 item: 11.39 |
| 93 | DSR2023 item: 11.40 |
| 94 | DSR2023 item: 11.46.3 |
| 95 | DSR2023 item: 12.41.2 |
| 96 | DSR2023 item: 12.42.5.2 |
| 97 | DSR2023 item: 12.43.2 |
| 98 | DSR2023 item: 13.2.2 |
| 99 | DSR2023 item: 13.16.1 |
| 100 | DSR2023 item: 13.18 |
| 101 | DSR2023 item: 13.41.1 |
| 102 | DSR2023 item: 13.47.1 |
| 103 | DSR2023 item: 13.61.1 |
| 104 | DSR2023 item: 13.71 |
| 105 | DSR2023 item: 13.80 |
| 106 | DSR2023 item: 13.88 |
| 107 | DSR2023 item: 13.91 |
| 108 | DSR2023 item: 13.99.1 |
| 109 | DSR2023 item: 14.1.2 |
| 110 | DSR2023 item: 14.2.2 |
| 111 | DSR2023 item: 14.6.1 |
| 112 | DSR2023 item: 14.8.2 |
| 113 | DSR2023 item: 15.2.1 |
| 114 | DSR2023 item: 15.7.4 |
| 115 | DSR2023 item: 16.70.2 |
| 116 | DSR2023 item: 17.10.2.2 |
| 117 | DSR2023 item: 17.13.2 |
| 118 | DSR2023 item: 18.9.2 |
| 119 | DSR2023 item: 18.9.4 |
| 120 | DSR2023 item: 18.48 |
| 121 | DSR2023 item: 18.51.1 |
| 122 | DSR2023 item: 22.14.1 |
| 123 | Deduction for using PPC over OPC |
| 124 | PKG-2 NON SCHEDULE ITEMS |
| 125 | NS-1/ Man- power Unskilled for Cleaning |
| 126 | NS-2/ Man- power Unskilled for Cleaning |
| 127 | NS-3/ LOCK |
| 128 | NS-4/Providing corrugated, colour coated |
| 129 | NS-5/supply and fixing of Ridge panel, c |
| 130 | NS-6/Supply of CPVC Gate Valve of dia 2 |
| 131 | NS-7/Supply of CPVC Gate Valve of dia |
| 132 | NS-8/ PillarTap |
| 133 | PKG-1 Electrical Schedule Item |
| 134 | 2.3.2 Supplying and fixing following way |
| 135 | 1.10.2 Wiring for light point/ fan point |
| 136 | 1.14.1 Wiring for circuit/ submain w |
| 137 | 1.14.2 Wiring for circuit/ submain w |
| 138 | 1.21.2Supplying and fixing of follow |
| 139 | 1.22.4 Supplying and fixing metal bo |
| 140 | 1.22.7 Supplying and fixing metal bo |
| 141 | 1.24.1 Supplying and fixing follow |
| 142 | 1.24.3 Supplying and fixing follow |
| 143 | 1.24.4 Supplying and fixing follow |
| 144 | 1.24.5 Supplying and fixing follow |
| 145 | 1.25 Supplying and fixing two m |
| 146 | 1.26Supplying and fixing modular bla |
| 147 | 1.27.2 Supplying and fixing following si |
| 148 | 1.27.4Supplying and fixing following siz |
| 149 | 2.10.1 Supplying and fixing 5 A to 32 A |
| 150 | 2.10.3 Supplying and fixing 5 A to 32 A |
| 151 | 5.2 Earthing with G.I. earth pipe 4.5 me |
| 152 | 6.8Providing and fixing G.I. tape 20 mm |
| 153 | PKG-1 Electrical Non Schedule item |
| 154 | NS-1 Supply & instalation of Ceiling fan |
| 155 | NS-2 Supply & instalation of 300 mm |
| 156 | NS-3 Supply,Installation, testing an |
| 157 | NS-4 Supply & laying of Copper Flexible |
| 158 | PKG-2 Electrical Schedule Item |
| 159 | 2.3.2 Supplying and fixing following way |
| 160 | 1.10.2 Wiring for light point/ fan point |
| 161 | 1.14.1 Wiring for circuit/ submain w |
| 162 | 1.14.2 Wiring for circuit/ submain w |
| 163 | 1.21.2Supplying and fixing of follow |
| 164 | 1.22.4 Supplying and fixing metal bo |
| 165 | 1.22.7 Supplying and fixing metal bo |
| 166 | 1.24.1 Supplying and fixing follow |
| 167 | 1.24.3 Supplying and fixing follow |
| 168 | 1.24.4 Supplying and fixing follow |
| 169 | 1.24.5 Supplying and fixing follow |
| 170 | 1.25 Supplying and fixing two m |
| 171 | 1.26Supplying and fixing modular bla |
| 172 | 1.27.2 Supplying and fixing following si |
| 173 | 1.27.4Supplying and fixing following siz |
| 174 | 2.10.1 Supplying and fixing 5 A to 32 A |
| 175 | 2.10.3 Supplying and fixing 5 A to 32 A |
| 176 | 5.2 Earthing with G.I. earth pipe 4.5 me |
| 177 | 6.8Providing and fixing G.I. tape 20 mm |
| 178 | PKG-2 Electrical Non Schedule item |
| 179 | NS-1 Supply & instalation of Ceiling fan |
| 180 | NS-2 Supply & instalation of 300 mm |
| 181 | NS-3 Supply,Installation, testing an |
| 182 | NS-4 Supply & laying of Copper Flexible Please Enable Macros to View BoQ information |