|
| 1 | Cutting existing steel tubing for alterations or additions (Each cut measured) of bore 15 mm complete connector) done in position without taking down all as specified and as directed |
| 2 | Cutting existing steel tubing for alterations or additions (Each cut measured) of bore 20 mm done in position without taking down complete all as specified and as directed |
| 3 | Cutting existing steel tubing for alterations or additions (Each cut measured) of bore 25 mm done in position without taking down complete all as specified and as directed |
| 4 | Cutting existing steel tubing for alterations or additions (Each cut measured) of bore 40 mmdone in position without taking down complete all as specified and as directed |
| 5 | Cutting existing steel tubing for alterations or additions (Each cut measured) of bore 50 mm done in position without taking down complete all as specified and as directed |
| 6 | Screwing existing steel tubing for alterations or additions (or lengthening screw on pipe to form connector) of bore 15 mm complete connector) done in position without taking down all as specified and as directed |
| 7 | Screwing existing steel tubing for alterations or additions (or lengthening screw on pipe to form connector) of bore 20 mm complete connector) done in position without taking down all as specified and as directed |
| 8 | Screwing existing steel tubing for alterations or additions (or lengthening screw on pipe to form connector) of bore 25 mm complete connector) done in position without taking down all as specified and as directed |
| 9 | Screwing existing steel tubing for alterations or additions (or lengthening screw on pipe to form connector) of bore 40 mm complete connector) done in position without taking down all as specified and as directed |
| 10 | Screwing existing steel tubing for alterations or additions (or lengthening screw on pipe to form connector) of bore 50 mm complete connector) done in position without taking down all as specified and as directed |
| 11 | Taking up/down steel water tubing 15 mm bore including cleaning for refixing or removal to store Complete all as specified and as directed. |
| 12 | All as per item srl No. 11 here-in-before but GI pipe 20 mm bore. |
| 13 | All as per item srl No. 11 here-in-before but GI pipe 25 mm bore. |
| 14 | All as per item srl No. 11 here-in-before but GI pipe 40 mm bore. |
| 15 | All as per item srl No. 11 here-in-before but GI pipe 50 mm bore. |
| 16 | All as per item srl No. 11 here-in-before but GI pipe 80 mm bore. |
| 17 | Refixing old steel tubing and connections in new or old position (Walls, ceiling, floors, etc.15 mm bore galvanised steel tubing medium grade, ISI marked including necessary fittings complete all as specified and as directed. |
| 18 | All as per item srl No. 17 here-in-before but GI pipe 20 mm bore. |
| 19 | All as per item srl No. 17 here-in-before but GI pipe 25 mm bore. |
| 20 | All as per item srl No. 17 here-in-before but GI pipe 40 mm bore. |
| 21 | All as per item srl No. 17 here-in-before but GI pipe 50 mm bore. |
| 22 | Supply & Fix in repair/ replacementing 15 mm bore galvanised steel tubing medium grade, ISI marked including necessary fittings fixed to wall ceiling or laid in floors complete all as specified and as directed. |
| 23 | All as per item srl No. 22 here-in-before but GI pipe 20 mm bore. |
| 24 | All as per item srl No. 22 here-in-before but GI pipe 25 mm bore. |
| 25 | Supply & Fix in repair/ replacementing 20 mm bore galvanised steel tubing medium grade, ISI marked including necessary fittingslaid in trenches complete all as specified and as directed. |
| 26 | All as per item srl No. 25 here-in-before but GI pipe 25 mm bore. |
| 27 | All as per item srl No. 25 here-in-before but GI pipe 40 mm bore. |
| 28 | All as per item srl No. 25 here-in-before but GI pipe 50 mm bore. |
| 29 | All as per item srl No. 25 here-in-before but GI pipe 80 mm bore. |
| 30 | Supply and fixing in repair/ replacement gun metal gate valve with iron wheel head screwed both end suitable for 15mm bore pipe, ISI marked, complete all as specified and as directed. |
| 31 | All as per item srl No. 30 here-in-before but for 20 mm bore GI pipe |
| 32 | All as per item srl No. 30 here-in-before but for 25 mm bore GI pipe |
| 33 | All as per item srl No. 30 here-in-before but for 40 mm bore GI pipe |
| 34 | All as per item srl No. 30 here-in-before but for 50 mm bore GI pipe |
| 35 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth for foundation etc or for laying pipe lines and getting out as in hard/dense soil complete all as specified and directed. |
| 36 | Returning filling in including spreading leveling, watering and well ramming in layer not exceeding 25 cm in hard/dense soil, complete all as specified and directed. |
| 37 | Removing excavated material to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. |
| 38 | S&F in repair/ replacement 3-layer PP-R random copolymer concealed pipes of outer dia 20 mm SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded Polypropylene random fittings floors etc. walls, ceilings or in fixed complete all as specified and directed. |
| 39 | S&F in repair/ replacement 3-layer PP-R random copolymer concealed pipes of outer dia 25 mm SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded Polypropylene random fittings floors etc. walls, ceilings or in fixed complete all as specified and directed. |
| 40 | S&F in repair/ replacement 3-layer PP-R random copolymer concealed pipes of outer dia 32 mm SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded Polypropylene random fittings floors etc. walls, ceilings or in fixed complete all as specified and directed. |
| 41 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for including disposal of unserviceable material complete all as specified and as directed. |
| 42 | M & L for PCC 1:3:6 type C-1 using 20mm graded stone aggregate for to support the pipe line etc, including necessary form work complete all as specified and directed. Supply and laying river bed fine sand in trenches/ ducts 15 cm under cable and 8 cm above the cable for cushioning / protection to cable including spreading, levelling and get thick 18cm after hand punning complete all as specified and directed at site. Please Enable Macros to View BoQ information |