| 1 | Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m |
| 2 | All Kind of soil 70% |
| 3 | Ordinary Rock 30% |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 cement: 4 coarse sand (zone-III) derioved from natural sources: 8 graded stone aggregate 20mm nominal size derived from natural sources) (Nallah) |
| 5 | Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @40% of gross volume upto plinth level excluding cost of form work and including curing complete.. |
| 6 | Reinforced cement concrete work in beams suspended floors,roofs having slope upto 15* landings,balconies shelves,chajjas, lintels bands plain window sills,staircases and spiral stair cases upto floor five level excludiing the cost of centring shuttering,finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size. (crushed agregates) |
| 7 | Reinforcement for RCC works including straightening ,cutting,bending placing in position and binding and all complete.Hot Rolled deformed bars. |
| 8 | Dumping/filling of stone in horizontal on level including cost of stone |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:3:6 (1 cement: 3 coarse sand (zone-III) derioved from natural sources: 6 graded stone aggregate 20mm nominal size derived from natural sources) |
| 10 | Cement concrete flooring 40mm thick 1:2:4(1cement: 2 Coarse sand: 4 graded stone agg.) finished with a floating coat of net cement slurry, but excluding the cost of nosing of step etc. comlepte 40mm thick with 20mm size stone agg. |
| 11 | 20mm cement plaster finished with afloating coat of neat cement cement of mix 1:4 (1cement :4 fine sand) including cost of water proofing ,rapadite. |
| 12 | Providing and fixing up to floor five level precast cement concrete string or lacingcourses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers,steps, stair cases, etc., including hoisting and setting in position with cementmortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete.1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20mmnominal size) |
| 13 | Centering and shuttering including strutting, propping etc. and removal form for:-charge |
| 14 | Footings bases of columns etc for mass concrete. |
| 15 | Columns, Piers, abutments , pillars , posts and struts |
| 16 | Lintle, Plinth beam, grinder, Bressumer and Cantiliver etc |
| 17 | Providing wood work in frames of doors, windows, clerestory windows and other frames wrought framed and fixed in position Ist class K-wood. |
| 18 | Structural steel welded in build up section, trusses and frame work including cutting, hosting, fixing in position and applying a priming cost of approval steel primer and all complete. |
| 19 | Providing CGI sheet roofing fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers. |
| 20 | Providing and fixing 19 gage 1.02mm thick plane sheet eves bordings/ weather bording. |
| 21 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m |
| 22 | Providing and fixing steel rolling shutter for door. Including providing and fixing of ball baring for rolling including painting, priming and all necesserary items as per the direction of site engineer etc complete. |
| 23 | Carriage of material from source to site of work including loding un loading and stacking complete |
| 24 | (i) Sand / Aggregate & sand by an avg lead of 15 Km and 500 Mtr by Head load |
| 25 | (ii)Cement / Steel by an avg lead of 65 Km by MT 500 Mtr by Headload Please Enable Macros to View BoQ information |