|
| 1 | DSR-ITEMS |
| 2 | NON-DSR-ITEMS |
| 3 | DSR-ITEMS |
| 4 | DSR-2018 Item:2.8.1 |
| 5 | DSR-2018 Item:2.25 |
| 6 | DSR-2018 Item:13.102.1 |
| 7 | DSR-2018 Item:13.100.1 |
| 8 | DSR-2018 Item:18.28.1 |
| 9 | DSR-2018 Item:18.28.2 |
| 10 | DSR-2018 Item:18.28.3 |
| 11 | DSR-2018 Item:18.28.4 |
| 12 | DSR-2018 Item:18.28.5 |
| 13 | DSR-2018 Item:18.28.6 |
| 14 | DSR-2018 Item:18.28.7 |
| 15 | DSR-2018 Item:18.28.9 |
| 16 | DSR-2018 Item:18.29 |
| 17 | DSR-2018 Item:18.62.1 |
| 18 | DSR-2018 Item:18.10.1 |
| 19 | DSR-2018 Item:18.10.2 |
| 20 | DSR-2018 Item:18.12.1 |
| 21 | DSR-2018 Item:18.12.2 |
| 22 | DSR-2018 Item:18.12.3 |
| 23 | DSR-2018 Item:18.12.4 |
| 24 | NON-DSR-ITEMS |
| 25 | Round the clock operation of water suppl |
| 26 | Maint. of water supply system and other |
| 27 | Round the clock operation including chec |
| 28 | Cleaning of overhead tank in resedential |
| 29 | House keeping of various pump houses, ch |
| 30 | Supply of USW for various type of mainte |
| 31 | Supply of SSW for various type of mainte |
| 32 | Thorough cleaning operation of various t |
| 33 | Thorough cleaning operation of various t |
| 34 | Thorough cleaning operation of various t |
| 35 | Thorough cleaning operation of various t |
| 36 | Thorough cleaning operation of various t |
| 37 | Thorough cleaning operation of various t |
| 38 | Thorough cleaning operation of various t |
| 39 | Thorough cleaning operation of various t |
| 40 | Thorough cleaning operation of various t |
| 41 | Thorough cleaning operation of various t |
| 42 | Through cleaning operation of various ta |
| 43 | Thorough cleaning operation of various t |
| 44 | Overhauling pumps of 45 HP Jyoti Make Mu |
| 45 | Overhauling pumps up to 10 HP various ma |
| 46 | Overhauling pumps 15 to 25 HP various Ma |
| 47 | Overhauling of 25 HP aerator gear box by |
| 48 | Overhauling pumps of 150 HP Kirloskar Ma |
| 49 | Overhauling of 25 HP Air Blower by decou |
| 50 | Picking , loading, un-loading stacking o |
| 51 | Attending the NO Water complaints for re |
| 52 | Providing lead caulked joints to spun ir |
| 53 | Deployment of site supervisor for superv |
| 54 | Supply of various sundry Items of emerge Please Enable Macros to View BoQ information |