|
| 1 | Providing and fixing C.I. sluice valves ( with cap ) complete with bolts, nuts, rubber insertions etc. ( the tail pieces if required will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge. |
| 2 | i) 100 mm dia A.P.N 1.6 |
| 3 | ii) 125 mm dia A.P.N 1.6 |
| 4 | iii) 150 mm dia A.P.N 1.6 |
| 5 | Providing and fixing G.I. Nipple of medium class as perCPWD specification and direction of the Engineer - in - charge. |
| 6 | i) 15 mm dia 150 mm long |
| 7 | ii) 15 mm dia 225 mm long |
| 8 | Providing and laying of flexible PVC pipe (conforming to IS:7634) complete as per specification and direction of the Engineer - in - charge (cost of earth work and fittings will be |
| 9 | i) 15 mm dia |
| 10 | ii) 25 mm dia |
| 11 | Excavating trenches of required width for pipes, cables etc. in/c excavation for sockets, dressing of sides where required, ramming of bottoms, depth upto 1500mm (Slope-1 in 200) in/c getting out the excavated soil and backfilling of soil as required after laying of pipe line, in layers not exceeding 200mm in depth in/c consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter-2 of CPWD specification and direction of the Engineer-in-charge. A. For UPVC pipes in new work. a) In all kinds of soil. |
| 12 | i) For pipes not exceeding 90mm dia. |
| 13 | Charges for fixing and laying rigid UPVC pipes jointing with couplers, solvent cement including testing of joints complete ( excluding the cost of pipes, couplers, solvent cement which are to be issued from the department free of cost and specials like bend, tees etc. which will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge.A. Class - 3 ( working pressure 6.0 kg / cm2) |
| 14 | i) 90 mm OD |
| 15 | ii) 110 mm OD |
| 16 | iii) 140 mm OD |
| 17 | Charges for repairing of leakage in UPVC / HDPE pipe line with PVC coupler & solvent cement etc. including necessary earth excavation, backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. complete as per specification & direction of the Engineer-incharge. |
| 18 | i) 90 mm OD |
| 19 | ii) 110 mm OD |
| 20 | iii) 140 mm OD |
| 21 | Charges for dismantling PVC / HDPE pipe after necessary excavation of earth including washing and stacking of pipes properly at site with all leads and lifts and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. complete as per specification & direction of the Engineer-in-charge. |
| 22 | i) 90 mm dia |
| 23 | ii) 110 mm dia |
| 24 | iii) 140 mm dia |
| 25 | Washing & removal of deposited iron sludge & any other foreign materials etc. from inside the existing water distribution pipeline foreign materials from inside the excavation trenches up to required width & depth cutting of PVC pipeline at a length of every 55.00 mtr. Interval jointing of pipe with PVC coupler and solvent cement in/c satisfactory testing of joints refilling trenches with available excavated earth etc. complete as per direction of the Engineer in charge [Rate in/c the cost of cement solvent PVC pipe for making PVC couplers, will be issued by the Department at free of cost] |
| 26 | i) 90 mm dia |
| 27 | ii) 110 mm dia |
| 28 | iii) 140 mm dia |
| 29 | Washing & removal of deposited iron sludge & any other foreign materials etc. from inside the existing water distribution pipeline (CI/DI) using UPVC pipe washing road fitted with Iron Brush in/c excavation trenches up to required width & depth cutting of CI/DI pipeline at a length of every 55.00 mtr. Interval or part there of & jointing of pipe & specials as required refilling trenches with available excavated earth etc.complete as per direction of the Engineer in charge. [The cost of CI specials lead joint rubber gasket joint will paid separately] |
| 30 | i) 150 mm dia |
| 31 | Charges for washing, cleaning & servicing of ferrule and connection pipe of street hydrant domestic water supply connection upto property line ( for side connection) in/c cost of earth excavation and dismantling the service line in/c ferrule and GI fitting etc. and reconnection the same after necessary washing, cleaning the same as per direction of the Engineer-in-charge. (GI fitting such as GI bend, GI union, GI socket & connection pipe in/c ferrule if required to be paid separately) |
| 32 | Charges for washing, cleaning & servicing of ferrule and connection pipe of street hydrant domestic water supply connection upto property line ( for road crossing connection) in/c cost of earth excavation and dismantling the service line in/c ferrule and GI fitting etc. and reconnection the same after necessary washing, cleaning the same as per direction of the Engineer-in-charge. (GI fitting such as GI bend, GI union, GI socket & connection pipe in/c ferrule if required to be paid separately) Please Enable Macros to View BoQ information |