|
| 1 | Carefully dismantling the existing damaged lime concrete (weathering course) which was already laid without disturbing the existing structure of the temple and incluidng charges for removing all debris from the site of work, etc., all complete complying with standard specifications. |
| 2 | Dismantling the existing damaged brick work / stone masonry in lime mortar walls under 3m hight including removing all debris from site of work, etc., all complete complying with standard specifications. |
| 3 | Labour charge for removing the existing damaged or dislodged stone element like pavukkal, uthiram, bothiyal and cut stone floor slabs and restacking it for later use etc., all complete complying with standard specification. |
| 4 | Pavukkal |
| 5 | Uthiram & Bothiyal |
| 6 | Removal of cut stone flooring slabs |
| 7 | Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds complete compyling standard specifications. Kalkaram |
| 8 | Labour charge for scrapping the lime plaster from the wall etc., all complete complying with standard specification. |
| 9 | Brick work in lime mortar 1:2 (one part of lime and two part of sand) using second class ground moulded Chamber bricks size 9\\" x 43/8\\" x 23/4\\" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. Ground floor |
| 10 | Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications. |
| 11 | Brick masonry lime mortar 1:2 (one part of lime and two part of sand) using Second class ground moulded clay with class designation 7.50 including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram. Kalkaram Upto 15'0\\" for Sannathi |
| 12 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with lime mortar 1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. For kalkaram. |
| 13 | Refixing the removed cut stones from the sannathi including labour cost for fixing etc., all complete complying with standard specification. |
| 14 | Bothiyal & Uthiram |
| 15 | Pavukkal |
| 16 | Cleaning the stone surfaces by water washing the stone elements like wall, piller, uthiram, pothiyal, pavukkal and etc., including cost of material and labour charges etc,. |
| 17 | Supply of cut stone for carrying out temple structure works such as of uthiram and pavukkal and etc,. all comple complying with standard specification. Temple structures from 5'-00\\" -10'-00\\" length |
| 18 | Dressing and fixing the new supply of cut stone like uthiram and pavukkal including cost of labour excluding cost of cut stones etc., all complete complying with standard specification. |
| 19 | Uthiram |
| 20 | Pavukkal |
| 21 | Pointing the cut stone masonary joints with lime mortar 1:1.5 (one part of lime and one point five) including cost of special tiles such brush and watering, curing etc.,complete as per standard specification and as directed by the departmental officers |
| 22 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. Depth from 0.00m to 2.00m |
| 23 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 24 | Plain lime concrete 1:4:8 (one part of lime four part of M-sand and eight part of HBG jelly) for all plain cement concrete works using 40mm gauge HBG stone jelly in position excluding centering and shuttering but including laying, curing and finishing etc.,complete. with standard specification. Foundation and Basement |
| 25 | Random Rubble masonry work in lime mortar 1:2 (one part of lime and two part of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications. For foundation and basement |
| 26 | Flooring with cut stone slab of size 600 x 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and pointing with lime mortar 1:1.5 (one part of lime and one point five) etc all complete complying with standard specification. Single line Dressing |
| 27 | Refixing the removed the cut stone flooring slabs with pointing in lime mortar 1:1.5 and etc., all complete complying with standard specification. |
| 28 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime mortar 1:1.5 (one part of lime and one point five part of sand) finishing the same with lime mortar 1:1.5 (one part of lime and one point five part of sand) bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing cement mortar. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting two coats over a primary coat (one vigraham is accountable with one head, four hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) |
| 29 | Sudhai size Up to 1' 0\\" |
| 30 | Sudhai size above 1' 0\\" up to 2' 6\\" |
| 31 | Painting two coat with approved water based exterior emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface, curing in all floors including brushes etc., complete compyling as per standard specification. |
| 32 | Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings and other superficial area complete with standard specification. Vimanam / gopuram of ht. Up to 15'0\\" excluding Kalkaram |
| 33 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the pavukkal in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. Ground floor |
| 34 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in lime mortar 1:1.5 (one part of lime and one point five part of sand) 12mm thick mixed with water proofing compound conforming to ISS at two percent by weight of lime used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers. |
| 35 | Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications |
| 36 | Considering door size 1.04m x 1.38m = 1.44sqm |
| 37 | Considering door size 2.04m x 3.46m = 7.06sqm |
| 38 | Best Varnishing Woodwork two Coats of approved quality in all floors etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality of paint should be got approved by the Executive Engineer before use on works.) |
| 39 | Supplying and fixing mild steel grill gate for windows, ventilators, etc., including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications. |
| 40 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over one coat of red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 41 | Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft. Vimanam/ Gopuram upto 15'-00\\" ht |
| 42 | Providing Two legged Scaffolding using 15cm Dia blue Gum post or Best quality Bamboo / casurina post of 4m overall length (3m ht + 0.5m Projection + 0.50m into the Ground), 3.50 -6.00m and 6.00 to 8.50 the Distance between the Two rows being 1.25m and the spacing of post being 2m ht both upto 18.00m ht etc., complete complying as per standard specification. For height 3.50 - 6.00m |
| 43 | Sub Total |
| 44 | GST @ 18% Please Enable Macros to View BoQ information |