| 1 | Survey of 11kV & LT UG Cable and submission of route survey drawing(in two copies) inscribing different land marks as per instruction of site engineer |
| 2 | Excavation of soil for formation of cable trenches & re-instatement of 33kV UG cable trenches with the excavated soil as per direction of Site Engineer. |
| 3 | Excavation of soil by cutting of Metalled Road/ Cement Concrete/ Brick Soling etc for 33KV UG cable & re-instatement of the same as per instruction of Site Engineer |
| 4 | Supply & Laying of 1st Class Kiln-Burnt Bricks with proper size and shape suitable for protective cover as per approved drawing of WBSEDCL and instruction of site engineer |
| 5 | Erection of Four pole complete with all fittings and foundation but without any insulator, with painting and as per instruction of Site Engineer (Wide Flange Beam: 13 M long ) |
| 6 | Erection of Double pole complete with all fittings and foundation but without any insulator, with painting and as per instruction of Site Engineer (Wide Flange Beam: 13 M long ) |
| 7 | Erection of Single pole complete with all fittings and foundation but without any insulator, with painting and as per instruction of Site Engineer (Wide Flange Beam: 13 M long ) |
| 8 | Lifting & checking of 1.1 kV 4C 185 sq.mm. cable to ascertain the actual fault including guarding arrangement up to the time of testing & jointing works |
| 9 | Lifting & checking of 1.1 kV 4C 300 sq.mm. cable to ascertain the actual fault including guarding arrangement up to the time of testing & jointing works |
| 10 | Lifting & checking of 11 kV 3C 95 sq.mm. cable to ascertain the actual fault including guarding arrangement up to the time of testing & jointing works |
| 11 | Lifting & checking of 11 kV 3C 300 sq.mm. cable to ascertain the actual fault including guarding arrangement up to the time of testing & jointing works |
| 12 | Relaying & dressing of existing healthy portion of the 1.1 kV 4C 185 sq.mm. cable in the already excavated trench as per instruction of the Site Engineer. |
| 13 | Relaying & dressing of existing healthy portion of the 1.1 kV 4C 300 sq.mm. cable in the already excavated trench as per instruction of the Site Engineer. |
| 14 | Relaying & dressing of existing healthy portion of the 11 kV 3C 95 sq.mm. cable in the already excavated trench as per instruction of the Site Engineer. |
| 15 | Relaying & dressing of existing healthy portion of the 11 kV 3C 300 sq.mm. cable in the already excavated trench as per instruction of the Site Engineer. |
| 16 | Supply & laying of 160 mm\\" diam PE80, PN-6 HDPE pipe (IS- 4984-2016) by HDD method as per instruction of site engineer including preparation & submission of drawing for such cable laying (As per Office Order No 40 dated : 08/10/2021 of the CE(Dist.), WBSEDCL) |
| 17 | Supply & laying of 110 mm\\" diam PE80, PN-6 HDPE pipe (IS- 4984-2016) by HDD method as per instruction of site engineer including preparation & submission of drawing for such cable laying (As per Office Order No 40 dated : 08/10/2021 of the CE(Dist.), WBSEDCL) |
| 18 | Laying & dressing of 1.1 kV 4C 185 sq.mm. cable in the excavated cable trenches as per drawing no.PLN(D)/SS/104, dt. 05.05.2015 and instruction of the Site Engineer. |
| 19 | Laying & dressing of 1.1 kV 4C 300 sq.mm. cable in the excavated cable trenches as per drawing no.PLN(D)/SS/104, dt. 05.05.2015 and instruction of the Site Engineer. |
| 20 | Laying & dressing of 11 kV 3C 300 sq.mm. cable in the excavated cable trenches as per drawing no.PLN(D)/SS/104, dt. 05.05.2015 and instruction of the Site Engineer. |
| 21 | Laying & dressing of 11 kV 3C 300 sq.mm. cable in the excavated cable trenches as per drawing no.PLN(D)/SS/104, dt. 05.05.2015 and instruction of the Site Engineer. |
| 22 | Making & fixing of end termination joint indoor type for 1.1 kV 4C 185 sq.mm. cable including fixing of the jointing box at the existing structure but without supply of the jointing materials & kit as per instruction of the Site Engineer. |
| 23 | Making & fixing of end termination joint indoor type for 1.1 kV 4C 300 sq.mm. cable including fixing of the jointing box at the existing structure but without supply of the jointing materials & kit as per instruction of the Site Engineer. |
| 24 | Making & fixing of end termination joint indoor type for 11 kV 3C 95 sq.mm. cable including fixing of the jointing box at the existing structure but without supply of the jointing materials & kit as per instruction of the Site Engineer. |
| 25 | Making & fixing of end termination joint indoor type for 11 kV 3C 300 sq.mm. cable including fixing of the jointing box at the existing structure but without supply of the jointing materials & kit as per instruction of the Site Engineer. |
| 26 | Making of Straight Through/Transition Joint including making of jointing pit of 11 kV 3C 95 sq.mm. cable without supply of the jointing materials & kit excluding making of \\"protection duct for cable joint\\" |
| 27 | Making of Straight Through/Transition Joint including making of jointing pit of 11 kV 3C 300 sq.mm. cable without supply of the jointing materials & kit excluding making of \\"protection duct for cable joint\\" |
| 28 | Making of protective duct for 11KV & LT cable joint complete as per WBSEDCLs approved drawing (Ref. Drg. no. PLN(D)/SS/106, dt. 05.05.2015) |
| 29 | Construction of RMU Plinth i.r.o. Out Door 11 KV 250/ 350 MVA 400 / 630A. 3 /4 Way RMU with FRTU (Ref. Drg. no. PLN(O)/SS/137, dt. 04.07.2019) |
| 30 | Earthing complete with driving of Earth Spike & connection of earth electrode with non current carring metalic parts of Supports, Stay, Wires, Craddle Guards, L.A., etc. |
| 31 | Earthing of Transformar Neutral complete as per specification of WBSEDCL |
| 32 | Earthing of Transformer (Indoor or outdoor) & RMU as per drawing consisting of 1 nos, 3 metres long 50 mm dia. medium gauge G.I TATA make Pipe (M), installation & connection in between earth pipe and other equipments using 2 nos. G.I Flat 40mm x 6 mm. by welding complete and as per instruction of the Site Engineer (including supply of all materials). (for Body) |
| 33 | Making of R.C.C/ Cement Concrete/ Masonry Plinth/ Foundation suitable for Distribution Feeder Pillar Box (Ref. Drg. no.PLN(D)/SS/102, dt. 05.05.2015) including supply of materials as per approved drawing. |
| 34 | Erection of Feeder Piller Box on the existing plinth/ structure including proper fixing on the plinth/ Structure as per instruction of the Site Engineer. |
| 35 | Erection of 315KVA, 11/0.4KV DTR on the existing plinth/ structure including proper fixing on the plinth / Structure as per instruction of the Site Engineer. |
| 36 | Erection of 4Way RMU as per specification of WBSEDCL |
| 37 | Dismantling of the L&MV Kiosk/ Feeder Piller Box from the existing plinth including a return to store. |
| 38 | Demolishing of the existing Feeder Pillar plinth including removal of debris from site |
| 39 | Dismantling of 250/315KVA, 11/0.4KV Dist. Transformer from existing structure and returning the same to store. |
| 40 | Dismantling of 4 Way RMU and Return to Store |
| 41 | Fixing of Caution Board |
| 42 | Conducting physical survry of 11kV & LT UG lines and subsequent data uploading and data validation with providing necessary logistic support (To be executed as per Office Order no CED/111 dated 21.09.2022 of the Director(HR)) |
| 43 | Making of Straight Through/Transition Joint including making of jointing pit of 1.1 kV 4/3.5C 300 sq.mm. cable without supply of the jointing materials & kit excluding making of \\"protection duct for cable joint\\" |
| 44 | Making of Straight Through/Transition Joint including making of jointing pit of 1.1 kV 4/3.5C 185 sq.mm. cable without supply of the jointing materials & kit excluding making of \\"protection duct for cable joint\\" Please Enable Macros to View BoQ information |