|
| 1 | Empanelment of agencies for Hiring of Machines on Rental Basis for Processing of Fresh Municipal Solid Waste at Adampur chhawani waste Processing site Bhopal (Rate per Month) |
| 2 | Trommel ScreenAny sieve size (100 mm – 4 mm); feeding/output/reject conveyors; structure, motor, panel, foundation, installation, operator, O&M with 5 labour including work specified in scope of work. |
| 3 | RDF ShredderHeavy-duty twin shaft shredder for RDF (refused Derived Fuel) output 50–80 mm; complete with feed hopper, discharge conveyor, motor, control panel, operator, installation, operation & maintenance with 3 labour including work specified in scope of work. |
| 4 | Baling MachineHydraulic press unit for compacting RDF, plastic, paper, or recyclable waste into bales; includes feed conveyor, tying system, hydraulic power pack, and control panel; complete with installation, operator, operation & maintenance with 2 labour including work specified in scope of work. |
| 5 | MRF ShredderMRF Shredder (for Plastic / Paper / MLP) – Medium- duty shredder designed for secondary shredding of plastic, paper, and light recyclables at MRF; includes feed hopper, rotor chamber, discharge conveyor, motor with control panel, safety interlocks, installation, operator, operation & maintenance including work specified in scope of work. |
| 6 | Plastic Recycling / Egloo Dana MachineComplete plastic granule production line includes Hopper, Output Conveyor, control panel, operator, operation & maintenance including work specified in scope of work. |
| 7 | Forklift (Diesel / Battery Operated)Industrial forklift for loading, unloading, and movement of bales, waste bins, and recyclables within plant premises; includes fuel/charging, operator, routine maintenance, and insurance. |
| 8 | 25 TPH DOUBLE SHAFT SHREDDER O&M with minimum 3 labour including work specified in as per the specification mentioned in Annexure 1 |
| 9 | Disc Separator (Single) with Rotary Trommel, Air Density Separator, and Magnetic Separator O&M with minimum 3 labour including work specified in as per the specification as mentioned in Annexure 2 |
| 10 | Transportation and Disposal of Unshredded RDF as per SWM Rules 2026 |
| 11 | Transportation and Disposal of Shredded RDF as per SWM Rules 2026 Please Enable Macros to View BoQ information |