|
| 1 | M&L for Point wiring in repairs for one light/fan/socket or power point complete with two runs of 2.5 sqmm single core PVC insulated FR-LSH cable 1100 volts grade with multi-stranded copper conductors, drawn through and including PVC double locked Casing & caping including provision of 2.5 sqmm, FR-LSH, PVC insulated copper cable as earth continuity conductor connecting to earth dolly, with and including PVC rectangular box for mounting switches/sockets/regulators etc. of suitable size as required at site and 50 mm deep complete all as specified and as directed. |
| 2 | All as per item No- 01 here-in-before but with 4 Sq mm for 3 pin 15 Amps socket point controlled by one switch on independent board and 4 Sq mm copper conductor green in colour as earth continuity conductor connected to common earth dolly complete all as specified and as directed. |
| 3 | S&F Switch Socket combination, 2 in 1, 5 pin 6A flush type complete all as specified and as directed. |
| 4 | S&F Switch Socket combination, 2 in 1, 5 pin 6A/16A flush type complete all as specified and as directed. |
| 5 | M&L for sub-main wiring in repairs complete with PVC insulated & unsheathed two run of 4.0 Sqmm single core multi stranded copper conductor cable (FRLSH) 1100 Volt grade along with one run of 4.0 Sqmm PVC insulated & Unsheathed copper conductor cable (FRLSH) 1100 Volt grade connected to common earth dolly as earth continuty conductor, drawn through and including 20 mm wide PVC Casing Caping complete all as specified and as directed. |
| 6 | M&L for sub-main wiring in repairs complete with PVC insulated & unsheathed two run of 6.0 Sqmm single core multi stranded copper conductor cable (FRLSH) 1100 Volt grade along with one run of 6.0 Sqmm PVC insulated & Unsheathed copper conductor cable (FRLSH) 1100 Volt grade connected to common earth dolly as earth continuty conductor, drawn through and including 20 mm wide PVC Casing Caping complete all as specified and as directed. |
| 7 | S&F in repairs MCB Distribution board double door type SPN 4 way sheet steel enclosure powder painted with bus bar neutral link & earth din rail, recessed with wall surfaces by chase cutting and making good disturbed surfaces of wall complete all as specified and as directed. |
| 8 | S&F in repairs MCB SP 5 to 32 Amp rating 240V, 10KA 'C' curve miniature circuit breaker (MCB) of following poles and current carrying capacity in the MCB DB complete with connection testing and commissioning complete all as specified and as directed. |
| 9 | S&F in repairs MCB SPN 40 Amp rating 240V, 10KA 'C' curve miniature circuit breaker (MCB) of following poles and current carrying capacity in the MCB DB complete with connection testing and commissioning complete all as specified and as directed. |
| 10 | S&F fixing in repairs 1100 volts grade cable with XLPE insulated armoured heavy duty aluminium conductor, size 10 sqmm 2 core nominal cross section as in separate connection to AC or other appliances complete all as specified and as directed. |
| 11 | S&F fixing in repairs 1100 volts grade cable with XLPE insulated armoured heavy duty aluminium conductor, size 16 sqmm 2 core nominal cross section as in separate connection to AC or other appliances complete all as specified and as directed. |
| 12 | S&F in repairs copper conductor, 4 sqmm 4 Core PVC insulated and sheathed multistrand cable complete all as specified and as directed. |
| 13 | S&F in repairs Modular box for AC with 25 amp MCB and 16 amp socket with plug top complete all as directed by the Engineer-in- Charge |
| 14 | S&F in repairs Motor starter switch 25 amp complete all as directed by the Engineer-in- Charge. |
| 15 | S&F in repairs single pole and neutral enclosure with two pin and earth plug and socket along with a 20 to 30Amps rated SP MCB, 230 volt, 50 HZ as required at site, complete all as specified and directed by Engineer-in-Charge. |
| 16 | M&L for servicing of Window type AC upto 2.0 TR capacity including inspecting ACs for standing pressure and find out type of gas used, dismantling the AC unit, seperate the Grill, Air filter, PCB and use the protector cover for AC unit and washing the cooling coil, condenser coil, air fillter,swing blade, fan blade, grill of outdoor unit by jet pressure including cleaning the all parts of indoor/ outdoor unit and dry the all parts with clean cloth and re-assembling the complete unit and re-installing in its original position and testing on completion of proper servicing complete all as specified and as directed. |
| 17 | M& L for servicing of Split type AC upto 2.0 TR capacity indoor and out door unit complete including inspecting ACs for standing pressure and find out type of gas used, dismantling the AC indoor unit, seperate the Grill, Air filter, PCB and use the protector cover for indoor unit and washing the cooling coil, condenser coil, air fillter,swing blade, fan blade, grill of outdoor unit by jet pressure including cleaning the all parts of indoor/ outdoor unit and dry the all parts with clean cloth and re-assembling the complete unit and re-installing in its original position and testing on completion of proper servicing complete all as specified and as directed. |
| 18 | M& L for servicing of Tower AC of capacity upto 3/4/8 TR indoor and out door unit complete including inspecting ACs for standing pressure and find out type of gas used, dismantling the AC indoor unit, seperate the Grill, Air filter, PCB and use the protector cover for indoor unit and washing the cooling coil, condenser coil, air fillter,swing blade, fan blade, grill of outdoor unit by jet pressure including clean the all parts of indoor/ outdoor unit and dry the all parts with clean cloth and re-assembling the complete unit and re-installing in its original position and testing on completion of proper servicing complete all as specified and as directed. |
| 19 | M & L for disconnecting and remove unserviceable main PCB/ display PCB for Window AC upto 2 TR and Supply and fix new main PCB/ display PCB suitable for existing model complete all as specified and as directed . |
| 20 | M & L for disconnecting and remove unserviceable main PCB/ display PCB for Split AC 2 TR and Supply and fix new main PCB/ display PCB suitable for existing model complete all as specified and as directed . |
| 21 | M & L for disconnecting and remove unserviceable main PCB/ display PCB for Split AC 1.5 TR and Supply and fix new main PCB/ display PCB suitable for existing model complete all as specified and as directed . |
| 22 | M & L for disconnecting and remove unserviceable main PCB/ display PCB for Tower AC of capacity upto 4 TR and Supply and fix new main PCB/ display PCB suitable for existing model complete all as specified and as directed . |
| 23 | Taking out the unserviceable burnt fan motor from Window Air Conditioner of Capacity upto 2.0 TR and supply and fix new fan motor suitable for existing model complete all as specified and directed . |
| 24 | Taking out the unserviceable burnt fan motor from Split Air Conditioner of Capacity upto 2.0 TR and supply and fix new fan motor suitable for existing model complete all as specified and directed . |
| 25 | Taking out the unserviceable burnt fan motor from Casette/ Tower AC of capacity upto 4 TR and supply and fix new fan motor suitable for existing model complete all as specified and as directed. |
| 26 | Taking down unserviceable blower motor of split type air conditioner and supply and fix new blower motor including Blower suitable for existing model of indoor unit of split type air conditioner of capacity upto 2.0 TR including necessary connections and testing on completion complete all as specified and as directed. |
| 27 | Taking down unserviceable Swing motor of split type air conditioner and supply and fix new Swing motor suitable for existing model of indoor unit of split type air conditioner of capacity upto 2.0 TR including necessary connections and testing on completion complete all as specified and as directed. |
| 28 | Disconnecting and removing unserviceable 1/1.5 TR window type/split type Air Conditioner and supply and fix new sealed rotary / reciprocating compressor including brazing the suction / discharge lines suitable for existing model and testing on completion , complete all as specified and directed . |
| 29 | Disconnecting and removing unserviceable 2.0 TR window type/split type Air Conditioner and supply and fix new sealed rotary / reciprocating compressor including brazing the suction / discharge lines suitable for existing model and testing on completion , complete all as specified and directed. |
| 30 | Disconnecting and removing unserviceable 4TR Casette/ Tower type Air Conditioner and supply and fix new sealed rotary / reciprocating compressor including brazing the suction / discharge lines suitable for existing model and testing on completion , complete all as specified and directed . Please Enable Macros to View BoQ information |
| 31 | Disconnecting and removing unserviceable 4TR Casette/ Tower type Air Conditioner and supply and fix new sealed rotary / reciprocating compressor including brazing the suction / discharge lines suitable for existing model and testing on completion , complete all as specified and directed . Please Enable Macros to View BoQ information |