| 1 | All these below items/materials from S.N. 1.01 to 1.11 will be given and errected by the contractor at his own cost as per estimate/Resspo Norms. |
| 2 | Stone pad |
| 3 | holding Clamp for top, t-off, dropper etc. |
| 4 | Earth wire clamp for Pole |
| 5 | Suspension clamp with I hook |
| 6 | Dead end clamp with i-hook |
| 7 | HT fuse set |
| 8 | LT clamp with nuts and bolt of PCC/STP |
| 9 | Nut and bolt with washers off size |
| 10 | Distribution box |
| 11 | Piercing connector |
| 12 | Danger board barbed wire including jumper |
| 13 | Loading, Unloading and safe cartage of the following materials (S.N. 2.01 to 2.16) from Electricity Store Centre, Gonda to the work site/dump site. |
| 14 | PCC Pole |
| 15 | 100 KVA T/F |
| 16 | DROPPER CHANNEL |
| 17 | ABC of different size |
| 18 | ACSR Conductor |
| 19 | LT lead |
| 20 | Substation base |
| 21 | Earthing complete |
| 22 | Extra for stays at angle location (stay rod, stay wire,stay) |
| 23 | Top channel |
| 24 | T-off channel |
| 25 | Stay set complete |
| 26 | Disk Insulator with fitting |
| 27 | Pin insulator |
| 28 | Pin with nut |
| 29 | Other material |
| 30 | Erection of single PCC Poles alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site (All decentralize material shall be given by the contractor on his own cost.) |
| 31 | Erection of sectional double pole sectional PCC Poles alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. (All decentralize material shall be given by the contractor on his own cost.) |
| 32 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
| 33 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 34 | Earthing |
| 35 | Bore type Earthing and lowering \\"B\\" class G.I. Pipe (Gindal) of 50mm dia from ground upto water level not less than 40 feet, with G.I. strip of proper size as per standard /Estimate/Resspo Norms. (All the required material shall be given by contractor at his own cost.) |
| 36 | Construction of 11/0.4 KV S/S for following capacity of T/F with mounting and fitting of T/F on plinth/double pole with proper fitting of all acessories and connecting with all circuit including earthing of T/F fitting with all accessories. |
| 37 | 100 KVA T/F |
| 38 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
| 39 | Laying, Stringing & Sagging of ABC Cable of upto proper sag for the different size cable as per estimate/resspo norms |
| 40 | Laying/installation of lead ofdifferent size cable as per estimate/resspo norms |
| 41 | Cutting of tree branches for cleaning route of 11 KV/LT line at the work site (25 mtr.= 1 Job) Please Enable Macros to View BoQ information |