| 1 | Safe carriage of following material from ESC Daliganj/Chinahut to JE Dump store including loading unloading and proper stacking of material |
| 2 | (a) Line Material. |
| 3 | (b) PCC pole 8.5/9 Mtr long |
| 4 | (f) 63 KVA T/F |
| 5 | (g) 100 KVA T/F |
| 6 | (h) 250/400 KVA T/F |
| 7 | (j) LT PVC Cable 1x400/3.5x 240/1x 70SQMM |
| 8 | (k)ABC( 3x120/95/70/25/16) Sqmm. |
| 9 | Safe carriage of following material from JE Dump store to site including loading unloading |
| 10 | (a) Line Material. |
| 11 | (b) PCC pole 8.5/9 Mtr long |
| 12 | (f) 63 KVA T/F |
| 13 | (g) 100 KVA T/F |
| 14 | (h) 250/400 KVA T/F |
| 15 | (j) LT PVC Cable 1x400/3.5x 240/1x 70SQMM |
| 16 | (k)ABC( 3x120/95/70/25/16) Sqmm. |
| 17 | Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department. |
| 18 | Prepare proper space for construction of Plinth |
| 19 | Construction of T/F plinth of size 2x2x1.2 meters with help of 1st class bricks and missionary in the ratio 1:4 cement & sand coarse, filling the structure completely as per norms with RCC top 1:2:2 cement, sand coarse, stone grit with MS bar and MS channel for resting T/F. All material shall be arranged by the contractor. |
| 20 | Wiremess fencing of 11/0.4 KV S/S shall be made of rectangular of size as per site requirement not exceeding 3 meter fabrication 45x45x5 mm angle the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of wire mess. Rectangular welded type wire mess of size 50x25 made of 12 S.W.G. wire mess shall be welded all along the periphery of the frame as well as on horizontal runner to give extra strength of welding to wire mess welded on the frame. Diagonal bracing of all the frame panel will be welded with MS flat of size 25x3mm to support as per RESPO specification & direction of E/I. |
| 21 | Painting of wiremesh Fencing with 2 coat of red oxide and 2 coat of enamel Paint |
| 22 | Construction of missionary type DP Box with First first class brick ballast ,course sand ,cement and MS Bar local sand by making 2 Nos pillar 1 Mtr long 25mm width 6 feet height above ground level ,fixing of 2 Nos MS Angle for mounting of Henlay type fuse unit plastering both side with provision of ,all material arrange by contractor |
| 23 | Fabrication and fixing of Henley type Tailless Fuse Unit 500 Amp 650 Volts |
| 24 | Fabrication and Fixing of Electrolytic copper Bus bar of Size 50x6x750mm |
| 25 | Providing & Fixing of 8 No. Fuse wire |
| 26 | Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole. |
| 27 | Providing and fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole. |
| 28 | Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department. |
| 29 | Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only Stay wire shall be supplied by the Department. |
| 30 | Making 11KV Bus bar on newly erected Double pole and tapping of 11KV line |
| 31 | Erection & commissioning of (3x120/95/70/25/16 Sq.mm) Aerial Bunched Conductor. |
| 32 | Laying of LT PVC Cable 1x400/3.5x240 SQMM as RESPO specification & direction of E/I. |
| 33 | Hoisting of LT cable will be passed through GI pipe required size duly clamped with pole at the bottom ,middle and top of the pole only cable supplied by department |
| 34 | Proper Jumpering with existing LT Line with PVC Cable and Al Lugs |
| 35 | Earthing of T/F Pipe type with 60 fit deep boring and providing GI Pipe 1.5\\" dia (60 fit GI Pipe) and GI strip 25x5 mmx6 meter long attached with clamps, L piece, nut & bolts and GI Pipe Cap. All material shall be supplied by the contractor. |
| 36 | Disconnection and re-connection of consumer cable from exiting line to new line to T/F load |
| 37 | Strengthening double pole by replacement of Dropper & substation base angle suitable for 63/100 KVA T/F. |
| 38 | Safe Installation of 63/100 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 39 | Safe Installation of 250/400 KVA T/F on double pole by providing and fixing of all accessories along with making HT/LT connection and its commissioning. |
| 40 | Dismantling of 10/25/63/100 KVA T/F on double pole along with dragging, loading cartage and unloading to work site J.E dump store/Central store. |
| 41 | Supply & Fixing |
| 42 | ALUUNIN LUG 70 kva |
| 43 | ALUUNIN LUG 150 KVA |
| 44 | ALUUNIN LUG 240 kva |
| 45 | ALUUNIN LUG 400 kva |
| 46 | copper l piece |
| 47 | Nut & Bolts |
| 48 | Holding clamp |
| 49 | LT Clamp for pole with shackle insulator |
| 50 | Grouting of Pole GST will be paid extra as per rule. Please Enable Macros to View BoQ information |