| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: SE EDC, Chandauli, PuVVNL, Varanasi. Name of Work : Work for the installation of new 11/0.4 KV Distribution Transformers under the \\"Business Plan 2026-27\\" within the jurisdiction of the EDD-IInd, Mughalsarai (on Semi Turn-key basis). Tender No.: 17/EDC(C)/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Details Item Code / Make Qty. Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder (Including GST) Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (Including GST) Rs. P TOTAL AMOUNT(Including GST) Rs. P. (col.4 X col.13) TOTAL AMOUNT (Including GST)In Words |
| 2 | Centralised Materials- A |
| 3 | ST pole 11 mtr long |
| 4 | ST pole 9 mtr long |
| 5 | PCC pole 11 mtr long |
| 6 | PCC Pole 8.5 mtr long |
| 7 | MS Dropper Angle 100X50X2028 sq.mm |
| 8 | MS Top Channel 125X65X2240 mm |
| 9 | AB Cable of size 3X95+1X70+1X16 sq.mm |
| 10 | AB Cable of size 3X120+1X95+1X16 sq.mm |
| 11 | 11KV Polymeric Disc Insulator T&C Type 4500Kg |
| 12 | 11 KV Disc Fitting |
| 13 | MS Channel T-Off 125x65x1300 mm |
| 14 | 11 KV Pin Insulator Polymeric |
| 15 | ACSR Weasel Conductor |
| 16 | ACSR Rabbit Conductor |
| 17 | 11 KV Fuse Set |
| 18 | 11 KV TPMO with Insulators |
| 19 | Stay Set Complete (16X1800mm) |
| 20 | Stay Wire (3.15 mm) 7/10 SWG |
| 21 | Earthing Complete |
| 22 | LT XLPE Cable 3.5X70 sq.mm |
| 23 | LT XLPE Cable 3.5X150 sq.mm |
| 24 | LT XLPE Cable 3.5X240 sq.mm |
| 25 | LT XLPE Cable 1X400 sq.mm |
| 26 | LT XLPE Cable 3.5X400 sq.mm |
| 27 | Distribution Box 3 Phase |
| 28 | Guarding Corss Arm (MS Angle 65X65X6/1.6 Mtr. Long) |
| 29 | 11KV V-Type Steel Cross Arm |
| 30 | S/S Base Channel for 100KVA Transformer |
| 31 | G.I. Wire 6SWG &10SWG for Gurding |
| 32 | 11/0.4 KV T/F 100 KVA |
| 33 | 11/0.4 KV T/F 250 KVA |
| 34 | Decentralized Materials- B |
| 35 | Stone Pad 300x300x75 mm |
| 36 | Pearcing Connector |
| 37 | Connecting Lead 1X16 sq.mm |
| 38 | Suspension Clamp |
| 39 | Dead End Clamp |
| 40 | Eye Hook |
| 41 | J-Hook |
| 42 | LT Clamp for Suspension & Dead End |
| 43 | LT DB Clamp |
| 44 | Nut and Bolts with Washer |
| 45 | Distribution Box Clamp |
| 46 | Cross Arm Holding Clamp with Nut & Bolts |
| 47 | Guarding Angle Clamp with Nut & Bolts |
| 48 | Holding Clamp for TPMO, Top Channel and Fuse Set |
| 49 | Clamp for T-Off with Nut & Bolts |
| 50 | Red Oxide Paint |
| 51 | Alluminium Paint |
| 52 | Clamp for Bracket with with Nut & Bolts |
| 53 | MS Angle for Bracket |
| 54 | F-Bracket |
| 55 | Danger Board Barbed Wire Including Jumper |
| 56 | LT Protection Fuse Set with Box |
| 57 | Providing & Fixing of LT Tailless Unit with Frame For 250KVA Dt 300 A, 2 Ckt Inc. Box for Outdoor Type Tailless Unit Board |
| 58 | Allu. Lugs for 70 sq mm |
| 59 | Allu. Lugs for 150 sqmm |
| 60 | Allu. Lugs for 240 sq mm |
| 61 | Allu. Lugs for 400 sq mm |
| 62 | Copper L- clamp for 100 KVA T/F with nut bolt & washer |
| 63 | Copper Z- clamp for 250/400 KVA T/F with nut bolt & washer |
| 64 | Labour & Maintainance charges - C |
| 65 | Work of Carriage of ST Pole 9 mtr. / 11 mrt. with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 66 | Work of Carriage of PCC pole 8.5 mtr. / 11 mtr. with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 67 | Work of Erection of Single Pole / Double Pole with ST Pole 9 mtr. / 11 mtr. with digging & Fitting of fixtures with accessories ( Droper Angle, Top Channel, 11KV Fuse Set, T-Off , V-Cross, Base, Stone Pad, Holding Clamp, F-Bracket, Danger Board with Barbed wire, Nut & Bolts, MS Angle etc.) as per RESSPO standard. |
| 68 | Work of Erection of Single Pole / Double Pole with PCC Pole 8.5 mtr. / 11 mtr. with digging & Fitting of fixtures with accessories ( Droper Angle, Top Channel, 11KV Fuse Set, T-Off , V-Cross, Base, Stone Pad, Holding Clamp, F-Bracket, Danger Board with Barbed wire, Nut & Bolts, MS Angle etc.) as per RESSPO standard. |
| 69 | Work of Carriage & Erection of ACSR Weasel Conductor Conductor with all accessories (Disc Insulator, Pin Insulator etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 70 | Work of Carriage & Erection of ACSR Rabbit Weasel Conductor Conductor with all accessories (Disc Insulator, Pin Insulator etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 71 | Work of Carriage & Erection of Earthing Complete with loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 72 | Work of Carriage & Erection of Stay Complete with loading & unloading as per RESSPO standard. |
| 73 | Work of Carriage & Erection of 11KV Guarding with all accessories (G.I. Wire, Gaurding Angle, Clamp on the Basis of Guarding Angle) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 74 | Work of Carriage & Erection of LT AB Cable (3x95+1x70+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box with Clamp, Dead End Clamp with I/J-Hook, LT Pearcing Connector, Nuts & Bolts etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 75 | Work of Carriage & Erection of LT AB Cable (3x120+1x95+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box with Clamp, Dead End Clamp with I/J-Hook, LT Pearcing Connector, Nuts & Bolts etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 76 | Work of Carriage & Laying by Open air method of LT XLPE Cable 3.5x70 / 3.5x150 / 3.5x240 sqmm (with Crimping Lug, Connecting Lead, L-Piece, Z-Clamp, LT Fuse Set) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 77 | Work of Carriage & Laying by Open air method of LT XLPE Cable 3.5x400 / 1x400 sqmm (with Crimping Lug, Connecting Lead, L-Piece, Z-Clamp) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 78 | Work of Carriage & Mounting of 100 KVA transformer from store centre Sahupuri/Rajatalab to work site and Energizing (with LT Fuse Set) after installation as per RESSPO standard. |
| 79 | Work of Carriage & installation on Plinth of 250 KVA transformer from store centre Sahupuri/Rajatalab to work site and Energizing with all Accessories (Z Clamp, Copper L-Piece) as per RESSPO standard. |
| 80 | Work of Construction of Wire mesh fencing with 1 door for distribution T/F including Grounting of foot & Proper fixingg as per RESSPO standard (fencing size-8x7x6) of T/F of supply of material. |
| 81 | Special Earthing of 250 KVA T/F Nutural and Body Seperately Chemical Pipe, 30Feet Deep & connection with GI Strip of size 30x5mm including cost of material all required material shall be supplied by the contractor. |
| 82 | Work of Construction of Plinth of 250 KVA TF (2X2X1.5M) including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 83 | Work of Erection of Henley Type Tailless Fuse Unit 300 Amp, 650 Volt (Two Circuit) (Complete set as per technical specification & drawing) Suitable up to 250 KVA / 400KVA Distribution Transformer as per RESSPO standard. |
| 84 | Work of Stay Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 85 | Work of Pole Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 86 | Work of Pole Painting as per RESSPO standard. |
| 87 | Work of Dismentaling & Carriage (Receive Back ACSR Weasel Conductor Scrap) from site to store centre Sahupuri/Rajatalab. |
| 88 | Work of Dismantling & Carriage Charges of old 63 KVA T/F form Site to store centre Sahupuri/Rajatalab. |
| 89 | Work of Dismantling & Carriage Charges of old 100 KVA T/F form Site to store centre Sahupuri/Rajatalab. Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |