| 1 | Carriage of following Materials from store center Unnao to dump site with loading, unloading and proper stocking. Distance as per indent placed by concered Executive Engineer |
| 2 | PCC/ST Pole of Diff. Size |
| 3 | Other loose line materials with including diff. size of conductor, Single and double Pole accessories, complete stay, insulator, x-arm, etc. |
| 4 | ACSR Weasel/Rabbit/Dog Conductor/A.B. cable of diff. sizes |
| 5 | 33 KV/ 11 KV XLPE Cable of diff. size. |
| 6 | 33 KV / 11 KV I/D & O/D & S/Th Cable Jointing kit of diff. size. |
| 7 | Dismantling of old damaged Pole and X-arms,brackets, Insulators, Channels and all hardware fittings. |
| 8 | Dismantling of old damaged Double Pole and Insulators, Channels and all hardware fittings. |
| 9 | Dismentling of Old/Damaged 33 KV/11 KV/L.T. line including rolling back its conductor/G.I. wire from work site to dump site. |
| 10 | Erection of PCC/ST Pole (11 KV) including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. |
| 11 | Supply & Fixing of following materials for above job- |
| 12 | F-Clamp with N&B |
| 13 | Cross Arm Holding Clamps |
| 14 | Bolt, Nut and washer |
| 15 | Erection of PCC/ST Pole (L.T. Line) including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. |
| 16 | Supply & Fixing of following materials for above job- |
| 17 | Suspension Clamp for ABC |
| 18 | L.T. Clamp with Nuts & Bolts |
| 19 | Eye Hook |
| 20 | Piercing Connector |
| 21 | Erection of D/Pole (11 KV) including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site. |
| 22 | Supply & Fixing of following materials for above job- |
| 23 | Clamp for Top and Dropper channel with N&B |
| 24 | Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO Norms with grouting materials. |
| 25 | Supply & Fixing of following materials for above job- |
| 26 | Stay Clamp with N&B |
| 27 | Stay Insulator |
| 28 | Grouting of PCC/ST Poles as per RESPO norms with grouting material. |
| 29 | Laying of 33 KV/11 KV stringing and sagging of conductor including all associated works and making clearance of road with joints/jumpers and binding of insulator as required. |
| 30 | Replacement of damaged 33 KV / 11 KV XLPE Cable of diff. size including all associated work as required. |
| 31 | Replacement of 33 KV / 11 KV Jointing Kit of diff. size including all associated work as required. |
| 32 | Re-sagging of existing loose conductor of 33 KV/11 KV/L.T. Line. |
| 33 | Repositioning of existing tilted PCC/ST pole. |
| 34 | Cutting of Tree Branches lying in the route of existing 11 KV/ LT Line Please Enable Macros to View BoQ information |