| 1 | Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and amplings of grith upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side the periphery of area cleared. |
| 2 | Dewatring of water by pummping set including all. |
| 3 | Excavation in water and liquid mud including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move). |
| 4 | Deposal of Malwa |
| 5 | R.R. Stone massonary work in cement & coarse sand mortar in 1:3 in substructure including supply of all material labour T&P etc. complete for proper completion of work (12.6 & 1405.3) |
| 6 | Providing and laying in cement concrete 1:4:8 (1 cement 4 coarse sand : 8 graded stone ballast 40mm nominal size) and curing complete, including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of E/I S.I. No. 281 |
| 7 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification |
| 8 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications |
| 9 | Providing and laying of boulder apron laid in wire crates with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each. Taking output = 3 mx1.5mx1.25m = 5.63 cum |
| 10 | Providing and fixing of 3 seater Concrete Bench |
| 11 | Carted Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth and earth work in embankment to the in 20 cm. Layers including ramming and dressing the surface to required levels and slops and also including 1.50 m. lift and 3.00 k m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30m distance as directed by the Engineer-in charge. |
| 12 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 13 | Supply & laying of 80mm Interlocking concrete block pavement having thickness 80 mm as per drawing and technical specification Clause 1504. Ch.-20 New Item-40 |
| 14 | Providing and laying in cement concrete 1:2:4 (1 cement 2 coarse sand : 4 graded stone ballast 40mm nominal size) and curing complete, including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of E/I S.I. No. 281 |
| 15 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making Jof drip course which shall be paid extra. |
| 16 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. (S.I.No. 10.05/504) |
| 17 | M-150 Brick Work in 1:6 (One cement & six fine sand of 1.25 F.M.) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. |
| 18 | M-150 Brick Work in 1:4 (One cement & Four fine sand of 1.25 F.M.) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. |
| 19 | 12 mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. |
| 20 | Distempering (Two coat) with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including the surface even with plaster of Paris or approved synthetic materials and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. |
| 21 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. in M.S. Grills / Stair case railing /gates / trusher / racks etc. (S.I.No. 10.02/502A) |
| 22 | Add 18%GST Please Enable Macros to View BoQ information |