Tender For Cleaning Of 2Re Sump Of Burhar Vi Bottom Seam For Increase A Capacity Of Sump & Construction Of 10 Nos. Retaining Wall To Around 2Re Sump Of Burhar Vi Bottom Seam At Damni Ug Mine. Period - 120 Days, Shahdol-Madhya Pradesh
TDR : 55801817
Tender Notice
BOQ
12 Days Left
Shahdol
Madhya Pradesh
Tender For Cleaning Of 2Re Sump Of Burhar Vi Bottom Seam For Increase A Capacity Of Sump & Construction Of 10 Nos. Retaining Wall To Around 2Re Sump Of Burhar Vi Bottom Seam At Damni Ug Mine. Period - 120 Days
Name of Work:- Cleaning of 2RE Sump of Burhar VI Bottom seam for increase a capacity of Sump & Construction of 10 Nos. Retaining wall to around 2RE Sump of Burhar VI Bottom seam at Damni UG mine. Period - 120 days
Sl. No.
Item Description
1
PARTICULAR
2
Cleaning/removal of malma /muck from UG sump and stacking within 50m distance .Along (-) 17L between 1RE to 4RE = 50.00 mtr.Along (-) 18L between 1RE to 4RE = 75.00 mtr.Along (-) 19L between 1RE to 4RE = 65.00 mtr.Along (-) 20L between 1RE to 4RE = 70.00 mtr Along (-) 21L between 1RE to 4RE = 70.00 mtr Along (-) 22L between 1RE to 4RE = 70.00 mtr1RE between (-) 17L to (-) 22L = 80.00 mtr.2RE between (-) 17L to (-) 22L = 90.00 mtr.3RE between (-) 17L to (-) 22L = 85.00 mtr. Total = 655 mtr. (0.90)Volume of silt = 655.00 x 4.10 x 1.20 +1.00+ 0.60+1.20 + 0.50 = 2416.95 m3
3
Groove cutting in stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50m.distance. In Floor– 10X(5.15m.x0.30m.X0.30 m.) = 4.63 m3In side– 10X2(1.50m X 0.30m X 0.50m) = 4.50 m3Total - 9.13 m3
4
Reinforced cement concrete (1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) In wall - 10X(5.15 m.x1.80m.X0.30 m.) = 27.81m3
5
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. Wall -10 X 2 X 4.15X1.50 =124.50 m2
6
6 mm thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etccomplete (exclusive cost of materials) one sideWall - 6 X 2 X 4.15X1.50 = 124.50 m2
7
Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m. CEMENT
8
STONE CHIPS
9
STEEL ROD
10
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface CEMENT
11
STONE CHIPS
12
STEEL ROD
13
Unloading of all kind of building materials from tubs at destination in u/g and stacking the same. CEMENT
14
STONE CHIPS
15
STEEL ROD
16
Lead for transportation/carriage of all kinds building materials by manually in u/g. Upto 75.00 m . Sand -13.31 m3, Cement -6.35 m3, stone chips- 24.75 m3, steel- 013 m3 = 44.545 m3
17
Pushing of tub for every 30m after free pushing of first 30.00m Upto 810 m. ( 26*6.02= 156.52) Sand -13.31 m3, Cement -6.35 m3, stone chips- 24.75 m3, steel- 013 m3 = 44.545 m3
18
Material cost (supply and stacking of material including cost of material,Transportation,Royaity etc. complete) CEMENT
19
STONE CHIPS (20mm)
20
STEEL ROD (08mm) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.