| 1 | DRAIN CONSTRUCTION |
| 2 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth |
| 3 | OD31052/2026-2027:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 |
| 4 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) |
| 5 | OD35172/2026-2027:PVC WEEP HOLES- Providing weep holes using 50mm dia. PVC pipes working pressure 6kg /sq.cm including cost of materials, conveyance, labour charges etc. complete |
| 6 | 2.5.2.B:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br> (II) By Mechanical Means <br>(B) Reinforced Cement Concrete |
| 7 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification(i) Nominal mix (1:2:4) |
| 8 | OD35173/2026-2027:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump setincluding conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etccomplete |
| 9 | OD35309/2026-2027:Item shifted to subhead 14as item 14.73(DAR)item shifted to head 14 as item 14.74steel work welded in built up sections/framed work, including cutting ,hoisting ,fixing in position and applying a priming coat of approved steel primer using structural steel etc.as required. In grating,frames,guardbar,ladder,railings,brackets,gatesand similar works Details of cost 1mX1M framed guard bar grating of 0.218quintal |
| 10 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 11 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 |
| 12 | OD35171/2026-2027:PVC HOLES in covering slabs Providing holes using 25mm dia. PVC pipes working pressure 10kg f/sq.cm including cost of materials, conveyance, labour charges etc. complete |
| 13 | OD31054/2026-2027:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top ofdrain inposition including all labour charges and miscellaneous expenses etc. complete. |
| 14 | OD469912/2025-2026:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. |
| 15 | OD31069/2026-2027:Berm concrete without formwork Providing Plain cement concrete for road work CC 1:2:4 (1cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size ofcourseaggregate not exceeding 25mm , mixed in concrete mixer etc complete asperspecification(i) Nominal mix (1:2:4) Please Enable Macros to View BoQ information |