|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming of the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 2 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation. |
| 4 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 5 | Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for nonpressure underground Drainage, Sewerage & Cross drainage application. (i) 150 mm internal dia. |
| 6 | (ii) 200 mm internal dia. |
| 7 | Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling,15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 3 M.T. R.C.P.C. manhole cover with frame of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.i) With Pakur variety. (SAIL/TATA/RINL) |
| 8 | Construction of Yard gully Pit of size 450 mm x 350 mm x 500 mm average depth [inside measurement] with 250 mm thick 1st class brick work in cement mortar[6:1] and bottom of the pit consisting of 75 mm thick jhama concrete[1:3:6]over a 1st class picked jhama brick flat soling including supplying, fitting and fixing 3 Mt. load capacity R.C.P.C. grating [Frame - 540 mm x 100 mm, cover 450 mm x 50 mm, weight approximate 47 kg] with cement concrete 1:2:4 with pakur variet stone chips and 15 mm thick pastering to inside and outside wall upto G.L., making invert with cement concrete1:3:6 with jhama khoa and 20 mm thick plaster in 4:1 to invert including 1.5 mm thick neat cement punning to all inside of the pit and top of the pit, complete as per direction of Engineer-in-Charge. |
| 9 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion |
| 10 | Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinth |
| 11 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar (a) 20 mm thick plaster (i) At Ground Floor |
| 12 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. |
| 13 | Removing chokage of H.C.I. or S.W. pipe with split bamboo.(a) Underground |
| 14 | Cleaning and removing silt from choked up gully pit including painting C.I. grating with bituminous paint. |
| 15 | Cleaning silt of inspection pit. |
| 16 | Cleaning silt of master trap pit. |
| 17 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |
| 18 | Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 16 |
| 19 | Add GST @ 18% on Total amount over item No. 1 to 17 Please Enable Macros to View BoQ information |