| 1 | Removal of Existing Damaged Weathering Course in the temple including all cost of Labour and cost of transportation, complete etc., as per standard specifications. |
| 2 | Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds - 100sft. For Vimanam up to 15'00\\". |
| 3 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortar 1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar 1:4 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. Excluding kalkaram For Vimanam up to 15'00\\". |
| 4 | Removal of Existing Damaged Modern Flooring in the temple including all cost of Labour and cost of transportation, complete etc., as per standard Specifications. |
| 5 | Flooring with cut stone slab of size 600mm x 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and Pointing With Lime Mortor 1:1.5 etc complete. Single Line Dressing |
| 6 | Providing Water wash and appropriate methodology to restore the originalities of the existing Granite structures inclusive of necessary scaffolding charges, conveyance and all hire charges for all tools and plants and clearing the site after completion of work etc., complete. |
| 7 | Pointing the cut stone joints with Lime Mortor 1:1.5 20 mm deep using red and yellow oxide and including cost of special tiles such brush and watering, curing etc complete, as per standard specifications. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. |
| 8 | Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required well beaten with wooden beater etc, complete with standard specifications. SOR Pg 32 W-0103 |
| 9 | Plastering with Lime mortar 1:1.5, 20mm thick including cost and conveyance of all materials and all labour charges, curing etc, complete complying with standard specifications. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. |
| 10 | Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. - 10 m 2 (S.I. No 358) |
| 11 | Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications Below 7'0\\" |
| 12 | Varnishing surface of wooden door including all materials, labour charges including all furniture fittings etc complete with std. Specifications |
| 13 | Scaffolding charges for Vimanams and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inspection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work. 15' |
| 14 | Supplying and filling in foundation and basement with filling M-sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling M-sand. |
| 15 | Sub Total |
| 16 | GST @ 18% Please Enable Macros to View BoQ information |