| 1 | based on Ruidp 2023 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus as ner excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturatèd soil such as moorum, sand, sandy silt, olay, black cotton soil, kankar, etc. Depth upto 1.5 m |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement: 4 fine/ coarse sand: 8 graded stone aggregate 40 mm nominal size). |
| 4 | Random rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering.In cement mortar 1:4 (1 cement: 4 coarse sand) |
| 5 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 6 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix: including Providing/mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed@ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar1:6 (1 cement: 6 fine/ coarse sand) |
| 7 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete |
| 8 | Distempering with 1st quality acrylic washable distemper (ready mixed) of approved manufacturer and of required shade and colour complete. as per manufacturer's specification. Two or more coats on new work. |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Hot rolled deformed bars |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1%½:3 (1 Cement : 11½ coarse sand : 3 graded stone aggregate 20 mm nominal size). |
| 11 | Brick work with FPS bricks of class designation 75 jn foundation and plinth in:Cement mortar 1:6 (1 cement: 6 coarse sand) Please Enable Macros to View BoQ information |